INTEGRATED PLANNING ACT 1997

Part E, Version 3.1, 3 March 2008

 
   

_Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

 

 

 

 

[Nature of the works
1. Nature of work that requires assessment against a planning scheme:
([] Building work - Complete Table A [X] Operational work - Complete Table 8
Table B
(i) What is the nature of the operational work?

([] Roadworks ([] Stormwater {([) Water infrastructure [1] Sewerage infrastructure
{_] Landscaping (FD Earthworks [] Drainage Works C1 Signage
[L] Clearing vegetation under the planning scheme DX] Other - Specify below

 

 

 

Boat Storage Device

ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
yo! pel q x
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form}

[EX] Development Permit [] Preliminary approval [J] Both (Specify betow)

 

 

(iii) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
[XJ No —_[_] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
—X] No (_] Yes - Complete Table B(a)

 

 

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (Le. the total value including GST, materials and labour) |$ 10000
jandatory Information 4 wo, . so. : . |
3. Confirm that the following mandatory information accompanies this application
Confirmation of [oy eri cant
lodgement — Method of lodgement

 

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works finchuding the
extent of any cut and fit) K Confirmed over the counter

 

 

 

 

 

OFFICE USE ONLY

 

 

 

Date Received Reference Numbers i

 

 

Advice for completing Part E

l.

General advice
Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering ail questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

(oa)

 

 

A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,

 

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0611 - Transport Type 5 - Boat lifting device (inc INCORRECT 4M boat lift plans) [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.