Council archive · source document
Attachment 4a - Engineering Report Part 1 · MCU18/0015
Attached to the e-mail Response to Information Request (Ecological Corridors Plan & Engineering Report Part 1) MCU18/0015 & RAL18/0001.
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
A conceptual layout of the treatment train as input to the MUSIC Model is shown in Figure
7.3.1a below.
Figure 7.3.1a: MUSIC Model Layout
The locations and details of the water quality treatment devices are shown on Engineering
Drawings C5756/18/P33, attached as Appendix C.
The Rainfall Runoff Parameters for the source catchments have been taken from Water
By Design’s – MUSIC Modelling Guidelines, Version 1.0 2010 and are shown in Table 7.3.1b
below.
Table 7.3-1b: Rainfall Runoff Parameters
Rainfall Threshold mm/day 1
Pervious Area Properties
Soil Storage Capacity (mm) 500
Initial Storage (% of Capacity) 10
Field Capacity (mm) 200
Infiltration Capacity Coefficient - a 211
Infiltration Capacity Exponent - b 5.0
Groundwater Properties
Initial Depth (mm) 50
Daily Recharge Rate (%) 28.0
Daily Baseflow (%) 27.0
Daily Deep Seepage Rate (%) 0.0
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4a - Engineering Report Part 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.