Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment 4a - Engineering Report Part 1 · MCU18/0015

Attached to the e-mail Response to Information Request (Ecological Corridors Plan & Engineering Report Part 1) MCU18/0015 & RAL18/0001.

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

CONTENTS
6.0      WASTE MANAGEMENT .................................................................................................................7

   7.1       Legal Point of Discharge ............................................................................................................8

   7.1       Flooding .....................................................................................................................................8

   7.2       Stormwater Quantity Management .........................................................................................8

  7.2.1           Peak Discharge Calculations ........................................................................ 9
  7.2.2           Overland Flow Path Depth Analysis .......................................................... 10
  7.2.3           Downstream Drainage Report ................................................................... 11
  7.2.4           Peak Flow Management ............................................................................ 11
   7.3       Stormwater Quality Management ......................................................................................... 12

  7.3.1           Assessment Criteria ................................................................................... 12
  7.3.1           Proposed MUSIC Model Concept .............................................................. 12
  7.3.2           Proposed Water Sensitive Urban Design Devices ..................................... 15
  7.3.3           MUSIC Model Results ................................................................................ 16
  7.3.4           Maintenance of WSUD Devices ................................................................. 16
8.0      SEWERAGE RETICULATION ........................................................................................................ 17

9.0      WATER SUPPLY........................................................................................................................... 18

10.0 ELECTRICITY AND TELECOMMUNICATIONS .............................................................................. 18

11.0 GEOTECHNICAL .......................................................................................................................... 18

12.0 EARTHWORKS ............................................................................................................................ 19

13.0 EROSION AND SEDIMENT CONTROL ......................................................................................... 19

14.0 CONCLUSION.............................................................................................................................. 20

Used in these records

About this file

File size
16.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4a - Engineering Report Part 1.pdf · 16.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.