Skip to the record
For the highest quality transcripts.

Council archive · source document

10/0036 - Altum Constructions - MCU - Multiple Housing Type 2 - Duplex [As Published] · 132010.36

of 48

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

   

 

 

 

 

Description of attachinent of title of attactiment

‘| Methad of tédgement to

assessment manager

 

Fler Connlree€e C tence
CHORE,

£6,660

 

 

  

 

 

hey

Says Freed lense
Cv T .

4 LOU otc O Gees

 

LHR PALA F CEM

 

» ee ee

 

Oheees

 

LETTE 5: LE OUST wnl6" “LE QuCv bE (O4 LODGECHCAT PEE

 

 

Das Re

   

 

 

 

sf :;By making this application?Ideclar
provide false or misleading tnformation).

 

 
 
      
 

 

 

‘Notes for completing this form
moo ~ . >.

Question’: oe ote

* Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of

application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required -

under section 263, then an application must contain, or be accompanied by, the written |

include a dectaration by the applicant that the owner has given written consent to
* Owner's consent is not required for a mobite and temporary ERA.

Question 9:

consent of the owner, or

the making of the application.

*. Section 264 of the Sustainable Planning Act 2009 provides that ifa development involves a state resource,'a

regulation may require the application to be supported by certain evidence prescfibed under the regulation, Schedute

’* 14 of the Sustainable Planning Regutation 2009 prescribes the state resources for which
* given, and the evidence required, to support the application.

oe

Question 23: : , -

evidence is required to be

¢ The Building and Construction Industry (Portable Long Service Leave). Act 1991 prescribes when the portable long uO

service leave levy is payable. .
« The portable long service leave levy amount and other prescribed percentages and rates

for calculating the levy are

prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation:2002, ©

Question 14:

_ © The portable tong service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portabte'Long Service Leavé)‘Act 1991 requires thi levy'to be paid before a development permit is issued.
© Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
oe agency, on request from QLeave, or can be.completed on the QLeave website at www.qleave.qid.gov.au. For further

. information contact QLeave on 1800 803 481 or www.gleave.qld.gov.au.

 

6. ~ : ‘Application details—IDAS form 1
: a . " Version 1.0 18 December 2009

the land is required foran

5 @

 

Used in these records

About this file

File size
7.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0036 - Altum Constructions - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.