Original source · versioned page text
20250212-NC- Change representations to the decision notice.pdf
Assessment for Proposed Wedding and Events Facility, 658 Louis Bazzo drive, Ringtail Creek” David Moore and Associates ,Report No: R24041/D3877/Rev.2/31.08.24 dated 31 August 2024 and the Acoustic Amenity conditions of this development approval including construction of the 1.8 metre high by 30 metre long acoustic barrier. Comment Correction of minor typographical errors. Amended Condition 21 21. Prior to commencement of the use, certification must be submitted to Council from a suitably qualified person that the development has been constructed is in accordance with report “Environmental Noise Level Impact Assessment for Proposed Wedding and Events Facility, 658 Louis Bazzo drive, Ringtail Creek” prepared by David Moore and Associates, Report No: R24041/D3877/Rev.2/31.08.24 dated 31 August 2024 and the Acoustic Amenity conditions of this development approval including construction of the 1.8 metre high by 30 metre long acoustic barrier. Condition 29 29. Where complaints (other than frivolous or vexatious complaints) are made to council about noise from the approved use, council may require the Operational Management Plan to be updated. Comments Similar to our representations for Condition 20 above, Condition 29 enables Council to request an updated Operational management plan as consequence of a complaint made. This condition is considered unreasonable as it is onerous and not necessary considering the other conditions of approval which ensure the development will not adversely impact on adjoining residents amenity. In addition to this, Condition 25 requires numerous updates and amendments to the Operational management plan prior to the commencement of use (including how complaints and transgressions will be dealt with). Furthermore, Condition 28 also requires a 3 year review which provides an opportunity for Council to reasonably update the OMP, if deemed necessary. As such, we request that Condition 29 be deleted. Amended condition 29: 29. Where complaints (other than frivolous or vexatious complaints) are made to council about noise from the approved use, council may require the Operational Management Plan to be updated. Deleted Condition 31 31. The operator/on-site manager must be on the premises at all times while a function is occurring, including the day and night of the event. Comments Whilst this condition is generally acceptable, our client is concerned that there could be instances where the operator/ on-site manager may be required to leave the site temporarily to undertake certain tasks or duties i.e. assist someone, undertake collections or deliveries. Therefore, it is requested that this condition be amended to say that the event manager must always be available. This is considered reasonable taking to account some events maybe held for several hours. JFP Ref: M3155P Page 4
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (20250212-NC- Change representations to the decision notice.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.