Council archive · source document
1802-4017 SRA - Amended response - with conditions · MCU18/0015
Attached to the e-mail MCU18/0015 & RAL18/0001 - Changed referral agency response - with conditions.
1802-4017 SRA
Attachment 1—Changed conditions to be imposed
No. Conditions Condition timing
Material change of use and Reconfiguring a lot
10.8.2.3.2.1 Schedule 10, Part 8, Division 2, Subdivision 3, Table 2, Item 1 – Queensland Heritage
Place or near a Queensland Heritage Place—The chief executive administering the Planning Act 2016
nominates the Director-General of the Department of Environment and Science to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following condition(s):
1. The development must be carried out generally in accordance with At all times
the following plans:
Proposed Lot reconfiguration plan, drawing PO.02(D)DD02-
A, prepared by Tim Ditchfield Architects and dated
November 2018 prepared by Innovative Planning Solutions
and dated 30 March 2016.
Overall Site Plan, – Main Floor Level, drawing
PL.05(D)DD05-A, prepared by Tim Ditchfield Architects
and dated November 2018prepared by Innovative Planning
Solutions and dated 30 March 2016.
Section A & B, drawing PL.08 (D), prepared by Innovative
Planning Solutions and dated 30 March 2016.
Section F, drawing DD10-A, prepared by Tim Ditchfield
Architects and dated November 2018
Lot 3 – Development Control Plan, drawing DD19-A,
prepared by Tim Ditchfield Architects and dated
November 2018
2. Provide written notice of the commencement of the Detached House Within ten working
use and Multiple Housing use to Environmental Services and days of the issue of
Regulation, Department of Environment and Science at the commencement
[email protected]. of the use
3. (a) Take photographs of the trees and the creek bed located on the (a) As indicated
boundary of Lot 2 on RP865533 and Lot 27 on RP89506:
(i) prior to the commencement of works; and (b) Within ten
(ii) at the completion of works. working days of
(b) Submit both sets of the photographs to Environmental Services completion of the
and Regulation, Department of Environment and Science at works
[email protected] of State Development, Manufacturing, Infrastructure and Planning Page 3 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1802-4017 SRA - Amended response - with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 271 KB (small file)
- File type
No other editions are linked here.