Original source · versioned page text
Plans for Approval - OPW22-0255
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 5
3.
0
11
11 112 13.0 3.5 .0
3.
5
11
2.
1 11 14
0
11
2.
1
1
11
12
116.0
.
Callaghan & Toth
0
11
2.0 .5
2.
5
11
3.
115.5
0
Civil, Environmental &
11
3
11
.5
6.
11
0
0.0
0.
5
Hydraulic Engineers
11
4.
115.0 1
11
110.5 11
0
0.
11
0
4.
5
1
11
5.
11
6.0
0
5.
11
5
6.
11
0
6.
11
5
.5
0.5
7.
110
11
0
11
7.
1111.5
5
1.0
11 11
1
11 .0
1
8.
1.5 0
11
11
6 .0
8.
5
11
9
11
.0
6.
5
11
.5 9
BM: Spike in Bit.
11
12
EROSION & SEDIMENT CONTROL LEGEND.
6.5
RL: 116.61
0.
0
12
0.
The following Construction Site Conditions and their suggested
5
12
method of control should be used in conjunction with the
1.
0
11
71.01
12
7.0
following documents:
1.
5
12
2.
0
"Erosion and Sediment Control Manual (V1.2)"
"Contract Standards for Erosion and Sediment Control",
12
2.
and the Pocket Guide (Nov. 2009)
5
117
.5
Urban Erosion and Sediment Control for Waterway Health
Protection, available on Councils web site.
118
.0
13
3.
5
13
4
12
.0
3.0
118.5
13
4.
5
13
5.
0
119.0
9.0
11 13
5.
5
.0
5.5
118
11188.
.0
1
8 13
118.0 11 118.0 6.
0
.5 .5
118118
13
119.0 6.
5
11
9.
0
13
11
119.5 7.
9. 0
5
120.012
0.
0
12
12
0.
0.
5
5
12
12
1.
1.
0
0
12
1.
5 121.5
13
7.5
12
2.
0 122.0
122.5 12
122.5 3.
0
123.0 123.0
123.5
123.5
124.0
124.0
124.5
125.0
W
137
125.5
.0
126.0
126.5
127.0
136.5
127.5
128.0
128.5
129.0
129.5
136.0
130.0
130.5
131.0
131.5
132.0
132.5
133.0
135
133.5
134.0 .5
13
4.5
13
5.0
135.5
13
5.5
[OCR of page images]
/
NL
¥
BM: Spike inbith
RL: 116%
fe
/
4
“
ee
SEDIMENT & EROSION CONTROL CHECK LIST
ISSUE
MANAGEMENT COMMITMENT
OBJECTIVE / TARGET
Comply with all statutory regulations and maintain
them during earthworks/construction.
Comply with the erosion and sediment control plan.
MANAGEMENT STRATEGY
Site foreman to identify and check direction of storm water
land flows as shown on plan. Provide barriers and other
at the end of table drains, and intercept sediments
before reaching gullies.
TASKS / ACTIONS
Erect sedimentation barriers as shown on the plans
before commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon as the drains
are cut.
PERFORMANCE INDICATORS
Site foreman to check that sediment fence and rock weirs
are trapping the flows after rain. Ensure no bypass occurs.
FREQUENCY / DEADLINE
Site foreman shall monitor performance and repair damage
after every storm until grass is established. Sediment shall
be removed before it reaches overflow level.
RESPONSIBLE PERSON
The Principal Contractors foreman shall be
responsible for inspections.
REPORTING / REVIEW
Site Foreman to advise workers: if they notice any
barrier requiring repair, report it to foreman.
CORRECTIVE ACTIONS
Site foreman is to repair any damaged barriers
daily. Replacements are to be purchased as required.
measures shown on the plan to intercept storm water flows |"
— a
lel Te -
te Jy 8-7 _- °
/ et ce a
/ QW) |=
é aa — 2
> “crosion_a SeDINENT CONTROL PLAN
STRAINER WIRE
DT [ey TOP & BOTTOM
FILTER FABRIC FIXED TO FENCE
AND EMBEDDED INTO
GROUND MIN. 200mm
PROVIDE OVERFLOW WEIR 0.5 WIDE
WHERE BACKUP FLOW IS
UKELY TO OVER TOP WEIR
a2} f
FLOW
STAR PICKET
SEDIMENT CONTROL LEGEND:
Amw_ SEDIMENT FENCE TO STD DWG ESC-04 & 05 OR COIR LOG
TO STD DWG Log-01
FIELD INLET SEDIMENT TRAP TO ESC-02 WITH COIR LOGS)
AROUND EDGES OF INLET
N ROCK CHECK DAM TO STD DWG RCD-01 CONSISTING OF
75@ ANGULAR ROCK OVER GEOFAB, 200mm HIGH AT Sm
CENTRES. TO REMAIN IN TABLE DRAIN AFTER
COMPLETION OF WORKS
—_ DIRECTION OF SEDIMENT FLOW/FINISHED ALLOTMENT FLOW
ROCK FILTER DAM INSTREAM TO IECA RFD-03 & RFD-04
EROSION & SEDIMENT CONTROL LEGEND.
Callaghan & Toth )
Civil, Environmental &
Hydraulic Engineers
PO BOX 2305
NOOSAVILLE 4566
yt 1.16/90 Goodchap Street
=| Phone 54749081
www.callaghanandtoth.com.au
designed | MP. datum AHD DERIVED
drawn MP.
Jenecked | AOT | Origin (BM) PSM 116668 |
approved
The following Construction Site Conditions and their suggested
method of control should be used in conjunction with the
following documents:
“Erosion and Sediment Control Manual (V1.2)"
"Contract Standards for Erosion and Sediment Control",
and the Pocket Guide (Nov. 2009)
Urban Erosion and Sediment Control for Waterway Health
Protection, available on Councils web site.
Alexander David Toth 6069
NAME . RPEQ
12/10/22
SIGNED DATE
SURVEYED BY
MAX WATTERSON & ASSOCIATES
PHONE: 5442 6121
FT
project
PROPOSED DEVELOPMENT AT
130 LAKE MACDONALD DR
COOROY
Ee
($<
Client
S. ARNOLD & L. PETERSEN
LC )
—
‘STAGE 2 EROSION & SEDIMENT
CONTROL PLAN
——_
LOTS 11-13 OF THE
RECONFIGURATION OF LOT 233
ON MCH4301
Parish of TEWANTIN
County of MARCH
NOOSA SHIRE COUNCIL
Locality of COOROY
SCALE
0 3 10 Meters 25
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:500(A3) 56 'Nor SCALE” FROM THIS. DRAWING
\ USE_ONLY_DIMENSIONS PROVIDED. )
REVISIONS
A | FOR APPROVAL
B | AMMENDED FOR APPROVAL
c
FILES
COMPUTER DIRECTORY
X:\JOBS\CT PROJECTS IN PROGRESS\2151 130
LAKE MACDONALD DR\DESIGN
FOR APPROVAL
Sheet 10of 13 sheets
drawing number
2151-10
SCALE: 1:500 (A3)
\ date OCTOBER 2022 yy,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.