124-002 Technical Memorandum Revision B
Figure 2 – Proposed stormwater tank location
Source: BRW Hydraulics
PROPOSED HYDRAULIC DESIGN
CHARGED DRAINAGE LINES
The maximum potential head on the charged line is 2.600m and measured between the Ground floor roof
and the discharge point at the kerb. With the charged roof water line running full the head loss and flow
rates in the pipe discharging to the kerb are as follows:
• 23m of 150mm PVC, equivalent length including fittings = 40.5m. Flow rate = 19.3L/s. Therefore the
Headloss in 150mm PVC pipe (6.5m/1000m) = 0.263m
• 6.5m of 150mm PVC, equivalent length including fittings = 20.0m. Flow rate = 14.4L/s. Therefore the
Headloss in 150mm PVC pipe (4.0m/1000m) = 0.08m
• 26m of 100mm PVC, equivalent length including fittings = 30.5m. Flow rate = 6.2L/s. Therefore the
Headloss in 100mm PVC pipe (4.3m/1000m) = 0.134m
Page 4 of 6
2261 david low way, peregian beach, qld 4573 acn: 626 671 092 [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.