Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

MCU25 0079 - Negotiated Reference Documents (As Published)

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (23.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                 Table 8 - ESC maintenance requirements.

                         ESC Measure                  Maintenance Trigger            Timeframe for Completion
                                                                                          of Maintenance

                  Sediment basins              When settled sediment exceeds        Within 7 days of the
                                               the volume of the sediment           inspection.
                                               storage zone

                  Other ESC measures           The capacity of ESC measures         By the end of the day.
                                               falls below 75%.

                 Sediment accumulation on ESC devices is to be removed and disposed of to the satisfaction of Noosa
                 Council.

                 5    CO N CLU S IO N


                 This SWMP outlines how stormwater runoff from the site will be managed in order to not adversely
                 impact the receiving environment.

                 The proposed lawful point of discharge for the development shall be the existing kerb and channel
                 within Clipper Street. Stormwater detention is not considered to be required for the development site.
                 Stormwater runoff will need to be collected on site and directed to the lawful point of discharge at the
                 build phase to ensure no adverse impacts to neighbouring properties as a result of the development.
                 Stormwater treatment should be managed through the implementation of best management practices
                 on site. Based on the scale of the proposed development, and typical pollutants produced, these
                 measures are considered adequate.

                 By implementing the proposed stormwater management system, and providing adequate maintenance,
                 the downstream environment and neighbouring properties will not experience any adverse deterioration
                 of water quality as a result of the proposed development.




                                                                                                                      10
Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
Log in to download the original file

MCU25 0079 - Negotiated Reference Documents (As Published).pdf · 23.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.