Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU25 0079 - Negotiated Reference Documents (As Published)

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (23.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

4. Site Visit
The consulting arborist liaised on site with Michael Lyell on two separate occasions. An initial walkthrough
of the site was performed to discuss the scope of the project with Michael Lyell on the 26th of March 2025.

A second preliminary site visit was conducted on the 27 th of May 2025 with potholing conducted to
investigate and visually observe the presence of active roots along the proposed driveway alignment.

Inspection data was captured upon the day of this site visit for the addition to the arborist report/impact
assessment.

5. Supporting documents and Information
The following Documents and information were provided by Icon Building Designs and Ingeniir C/o Urban
Town Planning.

 1.                Proposed Site Plan. Ground Floor, Driveway and crossover to Clipper Street.

 2.                First Floor Unit Plan with set back from the boundary.

 3.                Vehicle Manoeuvring diagrams.




Arborist Report Impact Assessment – TSA: 5635.1 4 Ventura Street Sunrise Beach.
Treesafe Australia Pty Ltd. June 2025© *Refer to explanatory Notes.

Page 3 of 18
Log in to download the original file

MCU25 0079 - Negotiated Reference Documents (As Published).pdf · 23.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.