Skip to the record
Accept no imitations.

Original source · versioned page text

MCU25 0079 - Negotiated Reference Documents (As Published)

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (23.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

12. Conclusion:
The second preliminary site visit involved capturing trunk diameter measurements to map out the TPZ and
SRZ radius.

It was anticipated that a significant number of active roots would be exposed by the proposed excavation
activities at this distance from the Structural Root Zone (SRZ); however, the hand excavation conducted
on the 27th of May revealed minimal active roots within the pothole sites.

These findings confirm that the tree can be retained without damaging active roots where the driveway
alignment is closest to the SRZ on the southern side of the tree.

The two exposed surface roots on the road reserve will require a soil top-dressing cover during operational
works to create a protective barrier and prevent further damage.

Mulching and watering are essential during construction to control moisture loss and soil erosion throughout
all phases.

13. Recommendations
    •   Consider all design implementations in favour of preserving the health and vitality of the tree.

    •   Utilise sensitive earthworks methods within the TPZ to avoid damage to the branch structures and
        root system.

    •   Engage a consulting arborist to oversee the excavation works within the TPZ of the Norfolk Island
        Pine.

    •   Refer to the guidelines of Noosa Shire Council tree management principles.

    •   Facilitate the installation tree protection fencing to deter stockpiling of materials or further soil.
        disturbances within the root zone.

    •   Adhere to the development guidelines AS 4970 Protection of trees on development sites.




Arborist Report Impact Assessment – TSA: 5635.1 4 Ventura Street Sunrise Beach.
Treesafe Australia Pty Ltd. June 2025© *Refer to explanatory Notes.

Page 8 of 18
Log in to download the original file

MCU25 0079 - Negotiated Reference Documents (As Published).pdf · 23.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.