The proposed lawful point of discharge for the site shall be the existing kerb and channel within Clipper
Street. Stormwater runoff from the proposed development shall be collected on site and directed to the
kerb via the construction of new on site drainage.
The total impervious area of the developed site was calculated to be 679m2 which equates to
approximately 74% fraction impervious (fi=0.74).
Time of Concentration (tc)
The time of concentration has been determined by using a combination of standard inlet time and pipe
flow time as described in QUDM.
A standard inlet time of 5 minutes has also been deemed appropriate for the proposed development
time of concentration:
tc, developed = 5 minutes
3.2.1 DR AI NS re su lt s f o r d ev e lop ed s ite
The developed site catchment is summarised below:
• Area – 0.0921 Ha
• Total time of concentration (tc) – 5 minutes
• Percent Impervious (fi) – 74%
Peak flow rates from the existing site have been determined by modelling various storm durations for
each AEP storm ensemble. The peak flow rate for the median AEP storm event are given in Table 2.
Table 2 - Developed site peak flow rates.
AEP Storm Event Peak flow rate (L/s)
1EY 21
0.5EY 27
0.2EY 38
10% 42
5% 50
2% 60
1% 66
3. 3 W ate r Q u ant it y C omp ar i son
Table 3 compares the peak flow rates for the median design storm for each of the existing and
developed cases.
4
Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.