2014-09-16 Infrastructure & Services Committee Agenda

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 35 of 50

04 September, 2014                                                Printed:                                                                       /. -e
                                                                                                                                              el
                                                                                     Adjusted  Actual Costs            Actual Total
                                                                         Original                                                Budget balance
                                                                                     Budget     (including            Incl Committ
                           Project Description              Manager      Project                                                (Adjusted budget -
                                                                                    (including actuals against           ments
                                                                         Budget                                                   Actual Total)
                                                                                    carryovers) carry overs)

                       HOLIDAY PARKS
         Boreen Point Campground - wastewater              IWichete String Joo 000] wo0000__]    sarsu__]      ©     | sais0_]      05250    |   J) [100% J
         Noosa River Holiday Pk- Internal refurb           Michelle Stirling $75,000 vsoo Poo fee Pepe Eee                                                      tt           |
ew]                                             LLU                          eee              Ee Em
                     IT MAJOR PROJECTS
            SSA                                                  a A                            EH                                                                                     Sco           PSS           SST
        Whole of Shire-Mobie computing                   Bx corner      | $220,000 | $220,000 | stored | ssz.too_ | SC |                    a          | dt              —
        ft   of Sirecapra vaste                             sintnes      som [aco          [0                                                           | | |
        whole of Shre-replace ele UPS________iwsin Tomas] _si2eo0 | size0_[                      |                  |     > __      $12,600   |         P| |             —            pO
        ivi Engineering Design Sofware ______|PessSenderon | _svsoro | —sisoro_|                 |                  |     > __      $15,019   |         P | tt
                                                                                                               $0       $10,571     $117,529                      ee        eee        a
                  PARKS & PLAYGROUNDS
        [Noosa Botanical Gardens-Pathwayrenewal_          Ross Sanderson | $10,000_|___ $10,000 |_ $200  |    SOS 200               89,800                                 8%
        [Noosaville Munna Pk basket ballcourt_            Ross Sanderson | $6,000 _| $6000  |     SO                                86,000
      hem ongrvarmonssens                            item [esc | een | oom f= [=]                                                         [ETT                                         p_feremstrtnnin
      fomminnernemtmees                                  ete           [owe          wom | mm |               @ | = |                         ptt
      Se                                                                                                                                      ptt Tt             |
          gneasnayueninms                                 meen            em |        ome f       @ | oome               el         ee                                eee
                                                                                                                      ae
        Whole of Stire-BBQ renewal                        Ross Sanderson | 18.000 | stecoo |      so    |    so     dT me          em
       liroks of Shre~pakshelews                           Ress Sanderson | sao000 | sinan0 | sior7 | scazeo | ms7_|                 ee __[_|           | {| | |
         whole of Shrepaygroundrenewalpog _______|Rss Sanderson         |   20000] —sao.000 |    sasvo_[      wo    | =m |         vmav__               pt tt
        Whole of Shire playground softfal_                Ross Sanderson | $10,000 | sooo Tso           Ps                         Sg
           FUE & Ene dbie FACILITIES
     fermen                                            freee fee                           |         fff                                      Pt
        [Tewantin - pathway upgrade and lighting          Ross Sanderson | $270,000 _| $270,000 | so    |                      |___ $270,000                               i |

         Noosa Heads - Main Beach boardwalk                Ross Sanderson     pet                                                                                                      Ross Sanderson Grant application to be prepared. Pedestrian
                                                                                                                                                                                                      counts to be collected in September. Design review
                                                                                                                                                                                                      scheduled for October
      fame                                           fee [wm fom fo                                                                                                       EF                          Grant application to be prepared. Pedestrian
                                                                                                                                                                                                      counts to be collected in September. Design review
                                                                                                                                                                                                      scheduled for October
         Porona State School& Staton Stathway SSRs Santer                 Over  |    aaa            Cid SCSCSSOCCdYCSCS                                                               [Ross Sanderson |
        Wreyba Creck Boarcwalk rehabitaton stage (te a                 oe fi 699              SSS                                    8 609                          a                     AS
         eerie ne oT ONT swan fo                                                | veow       | om [            »   | om» |          mm [i | [1                     |
        [Sunshine Beach State School safetyimprovements    Ross Sanderson Over   |   $20,700 |  $19,367 | SO            819,387    8313                                   190% _|
        a
                           PLANNING

         Standards Review - Standard Drawings              Ross Sanderson ft t=                                                                                                        Craig Eldridge & Currently in design. Bus shelter design to be
                                                                                                                                                                                       Steve Simpson  reviewed. Consideration for local architect to
                                                                                                                                                                                                      develop 'Noosa' style bus stop and report back to
                                                                                                                                                                                                      Council
                                                           Ross Sanderson jor}             foe Pow                    Te                                                               Craig Eldridge & Currently in design. Bus shelter design to be
                                                                                                                                                                                       Steve Simpson  reviewed. Consideration for local architect to
                                                                                                                                                                                                      develop ‘Noosa’ style bus stop and report back to
        Whole of Shire - Traffic Study                                                                                                                                                                Council

                                                                                                                                                                                                                                     Page 35 of 50
Log in to download the original file

2014-09-16 Infrastructure & Services Committee Agenda(PDF, 5MB).pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.