Original source · versioned page text
Minor Change Existing Approval OPW22 0104.02
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: OPW22/0104.02 Your Reference: 21556-18/10/2022 4 January 2023 JNE Developments P/L C/- Tod Consulting Pty Ltd PO Box 61 NOOSAVILLE QLD 4566 [email protected] Dear Sir/Madam, Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 18 October 2022, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: OPW22/0104.02 Street address: 25 Pavilion St Pomona Qld 4568 Real property description: Lot 21 SP 316902 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 3 June 2022 Development Permit for Operational Works - Drainage Works, Earthworks, Electrical and Street Lighting, Roadworks, Stormwater. In relation to the request to make a minor change to the existing approval, Council on 4 January 2023, decided to approve the requested changes. The changes are detailed below. Approve the change Amend condition 1 Delete condition 3 Amend condition 56 currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 21556-C100 D Earthworks Plan and Erosion and Sediment Control Prepared by TOD Consulting (as annotated in red by Council) 17/10/2022 21556-C200 D Roadworks and Drainage Plan Sheet 1 of 2 Prepared by TOD Consulting 17/10/2022 21556-C201 C Roadworks and Drainage Plan Sheet 2 of 2 Prepared by TOD Consulting (as annotated in red by Council) 17/10/2022 21556-C202 B Road Longitudinal Section, Typical Sections and Details Prepared by TOD Consulting (as annotated in red by Council) 25/05/2022 21556-C203 B Road Cross Sections Sheet 1 of 2 Prepared by TOD Consulting 25/05/2022 21556-C204 B Road Cross Sections Sheet 2 of 2 Prepared by TOD Consulting 25/05/2022 21556-C300 B Stormwater Drainage Detention/Bioretention Basin Details Prepared by TOD Consulting 25/05/2022 21556-C301 C Stormwater Drainage Longitudinal Section Prepared by TOD Consulting 17/10/2022 221308 (Sheet 1 of 3) A Locality Plan, Notes, Legend & Street Light Compliance Prepared by Ampflo 10/05/2022 221308 (Sheet 2 of 3) A Electrical Reticulation, LV Schematic Labels & Commissioning Plan Prepared by Ampflo 10/05/2022 221308 (Sheet 3 of 3) A Schedules Prepared by Ampflo 10/05/2022 221308 A National Broadband Network Prepared by Ampflo 10/05/2022 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 15 June 2024, unless an application to extend the currency period is approved by Council. PLAN REQUIRING AMENDMENTS Deleted PRIOR TO COMMENCEMENT OF WORKS Engineering Submit amended plans to Council as described in the list of plans requiring amendments. Plans must be submitted and approved prior to the pre-start meeting. All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council prior to the prestart meeting. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Electrical reticulation works; Erosion and sediment control works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction; Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased; Proposed fencing to the site during the construction phase of the development; Adequate parking arrangements for construction workers; No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures; Works programme identifying key components of the works and their respective durations; Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues; Include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details; Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details; identification of complaint management procedures including: contact details for the on-site manager; dispute resolution procedures; For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice; The relevant conditions of the higher order Reconfiguration of Lot approval viz. RAL21/0017 to which this approval relates; All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Roadworks (External Roadworks & Road Widening Works) All pavement widening or construction of new pavement must join neatly to the existing pavement so that there are no irregularities in line or level resulting at or adjacent to the join for the length of the construction. Where necessary the existing pavement must be brought to a satisfactory standard to allow for the above. All street surfacing must consist of a minimum depth of 30mm of an approved hot mixed asphaltic concrete, unless other pavement types are approved as feature areas in intersection thresholds, speed control devices, turning areas, indented parking etc. The installation and/or modification of any traffic signs, street signs, line marking and Raised Reflective Pavement Markings (RRPMs) must be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). New or relocated signage must be installed using the VLok installation system. All new signage must be Class 1 retroreflective material in accordance with AS 1906.1, Retroreflective materials and devices for road traffic control purposes – Part 1: Retroreflective sheeting. The developer must notify Council’s Traffic Engineer for any works involving the removal or modification of existing council traffic signs and/or parking bays prior to such works commencing. Root barriers are required to be installed behind the back of kerb for all new kerbs within 5m of a trunk of a tree. Pavement Design and Construction The pavement designs shown on the engineering drawings are not approved. To attain approval for the pavement design, the following details must be submitted and certified by an RPEQ with the proposed pavement design: The design CBR must be based on the four day soaked CBR value for the subgrade material; The design subgrade CBR must be representative of each homogenous insitu section of finished subgrade. With respect to each section: For four or less test results, the design CBR must be taken as the least estimated insitu CBR result; For five or more test results, the design CBR must be taken as the 10th percentile of all estimated insitu CBR results; The samples must be taken generally in the position of the outer wheel path on both sides of the proposed road. A sketch plan showing the location of all tests must be submitted with the test results for pavement design approval Where imported material has been (or is proposed to be) used for subgrade replacement, and the depth of the imported material is less than 300mm, the pavement design CBR must be based on the testing results of the insitu material and not the imported material. At the time of subgrade inspection, the subgrade must exhibit no visible signs of deformation under proof rolling by a fully loaded water truck. The pavement subgrade will not be passed until this requirement has been achieved. Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065; Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards; All paths must have a slip resistant surface; Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists; The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Pathways must: terminate in a manner that ensures smooth transition to existing surfaces for public safety; be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility. Site Access and Driveways Driveway crossovers must be constructed in accordance with council’s Standard Drawings RS-049, RS-050 and respective addendums. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossovers/driveways: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete; The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties; Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path; The property access must be located a minimum of 1m clear of power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing the Plan of Survey. Slope and batters are a maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Bioretention Basins - Construction The bioretention devices must be constructed in accordance with the document Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). Option 1 of the staged construction and establishment methods is to be followed as documented in the guidelines. During construction and establishment of the bioretention devices, the supervising RPEQ must ensure that the device is constructed in accordance with the document Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009) and that the forms contained in section 3.15 including the associated supporting information and data are completed. These forms and certification from the RPEQ that the device has been constructed in accordance with the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), all conditions of approval, and the approved engineering drawings must be submitted to Council prior to plan sealing. A construction hold point with a council delegate shall be established once the bioretention device underdrainage pipe work is installed. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled on-site. Laboratory results must be provided for the filter media which demonstrate that the media complies with the specifications contained in the latest version of the “Guidelines for Soil Filter Media in Bioretention Systems” (produced by the Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity specified on the approved engineering plans will be achieved. In addition laboratory results must be provided demonstrating that the transition layer and drainage layer meet the following bridging criteria: D15 (drainage layer) ≤ 5 × D85 (transition layer) D15 (transition layer) ≤ 5 × D85 (filter media) The bioretention under-drains and cleanout points shall be provided as uPVC pipe generally as shown on IPWEA Standard Drawing No. DS-0070 Where the bioretention filter media interfaces with stormwater pits and retaining walls non-woven geotextile shall be fixed to the pit / retaining wall and extend 300mm out into the filter media generally in accordance with IPWEA Standard Drawing No. DS-0070 to prevent tunnelling of water along the interface. Bioretention Basins – Maintenance & handover Following installation of the filter media for the bioretention devices, a temporary cover consisting of a suitable geotextile covered with soil and turfed is to be immediately installed. This temporary cover is to be maintained in place for a minimum period of 24 months following acceptance of the bioretention devices On Maintenance or until 80% of building works has been completed (whichever occurs first). Following this period the temporary cover is to be removed, and the approved plantings installed. The bioretention devices are then to be appropriately maintained for a minimum period of 12 months prior to being accepted as Off Maintenance by Council’s delegate. A bioretention performance bond equivalent to 150% of the bioretention plants plus removal of temporary turf and 12 months maintenance is to be lodged with Council prior to acceptance of the device on-maintenance. A construction hold point with a council delegate shall be established when the temporary cover is to be removed from the bioretention device an inspection shall be arranged with Council’s delegate. Prior to acceptance of the basin either on or off maintenance, council must receive evidence that the results for the in-situ hydraulic conductivity testing conducted in accordance with FAWB PRACTICE NOTE 1: In Situ Measurement of Hydraulic Conductivity Belinda Hatt, Sebastien Le Coustumer April 2008 for the bioretention filter media achieve the design criteria. Subsoil drains are to be cleaned out and accumulated sediment manually removed from the surface of basin and coarse sediment forebays at Off Maintenance and as required during the maintenance period. All stormwater quality treatment devices must be maintained by the development in accordance with Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) until they are accepted as Off Maintenance by Council. Any defects in WSUD devices identified during the maintenance period must be reviewed and a report recommending required rectification works submitted to Council and endorsed by Council’s delegate. Works to repair the device and prevent the problem occurring in the future must be completed and the device maintained for a minimum period of 12 months prior to the WSUD device being accepted as Off Maintenance. Prior to council accepting the bioretention devices Off Maintenance, maintenance checklists including the full cost of maintaining the devices in accordance with Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) must be submitted to Council. Erosion and Sediment Control Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. These measures must be designed, implemented and maintained in accordance with “Best Practice Erosion and Sediment Control” published by the International Erosion Control Association (Australasian Chapter) (IECA, 2008), to the extent that such measures and practices are also consistent with the following: Minimise Erosion; For areas of the site which drain to a sediment basin, implement drainage and erosion control measures prior to rainfall which prevent or minimise rill erosion and gully erosion; For areas of the site which do not drain to a sediment basin, implement drainage and erosion control measures prior to rainfall (including contingency measures) which prevent or minimise erosion, including rain drop erosion, chemical erosion, rill erosion and gully erosion; Prior to the sealing of the plan of survey for the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Manage concentrated stormwater flows Prior to each rainfall event ensure concentrated stormwater flow paths are provided with capacity in accordance with IECA (2008) Table 4.3.1 and are structurally stable in all rainfall events for the following sources: (a) From stormwater catchments upslope of the area of disturbance which are either stable or external to the site, ensure stormwater is diverted or managed either: around the site or through the site without causing erosion and without contaminating the flow; or if it is impractical to convey the flows around or through the site, convey the flows into appropriately sized sediment basins without causing erosion (b) From all disturbed areas of the site to sediment basin(s) without causing erosion Minimise sediment released from the site Install and maintain sediment basins for each disturbed catchment area of the site and including undisturbed catchments which cannot be diverted, such that: (a) Each basin is sized and operated in accordance with either a Type-A or Type-B sediment basin as documented in IECA (2008) Appendix B (June 2018). (b) Each basin is to be provided with an automated system of flocculent dosing and a suitable supply of flocculent/coagulant, with the type of flocculent/coagulant determined based on Chemical Coagulants and Flocculants Fact Sheet (IECA, 2018). (c) Markers are provided within each basin indicating the maximum sediment storage level and any additional water storage capacity for water reuse. (d) During discharge from the primary outlet system, the concentration of total suspended solids (“TSS”) discharged does not exceed 50mg/L and that pH is within the range of 6.5-8.5 unless entering a naturally acidic environment. Install and maintain additional sediment control measures within the site, as necessary to maximise sediment capture. Minimise the tracking of dirt from the site onto roadways. Ensure that all dirt on roadways caused by vehicles leaving the site is removed without causing water contamination, prior to rainfall and at least at the end of each work day. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have: Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods; Been revised by an RPEQ or CPESC to address the issues raised by changes in the projected construction schedule and/or methods; Been revised to address predicted rainfall events; and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. Earthworks and the implementation of erosion and sediment controls are undertaken in ways which ensure flooding characteristics (including stormwater quantity characteristics) external to the development site are not worsened during construction for all events up to and including the 1% AEP (1 in 100 year ARI) event. Drainage paths must be regularly inspected to ensure the sediment fences/measures are not being bypassed as a result of sediment build up. Sediment laden runoff must be prevented from leaving the subject site and entering neighbouring properties and/or stormwater systems. Soil exposure must be limited on the site to a distance of no more than 2m beyond the extent of earthworks shown on the approved plans except where the exposed soil is effectively stabilised without delay and prior to rainfall occurring. A log book for the Erosion and Sediment Control measures and inspections must be maintained by the site manager and made readily available to Council when requested. The supervising engineer must verify and endorsed the E&SC measures upon their installation, and periodically check these measures and the log book during construction and the stabilisation stages. Any defects in erosion and sediment control devices, such as sediment fences, are to be inspected and documented. Upon Inspection, the contractor is to determine whether the device should be replaced or repaired. Documentation is to include how the damage was caused and what measures can be implemented to reduce the possibility of repeat occurrences. Any damage to either permanent or temporary water quality control structures or devices is to be immediately rectified at the contractor’s expense. The effectiveness of the erosion and sediment control devices must be monitored. All ESC measures are to be inspected: at least daily (when work is occurring on site) or weekly (when work is not occurring on site); or within 24 hours of expected rain; or within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to mobilise sediment on site). Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION / PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines. The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 6 – Engineering Design Standards”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy and the draft departmental guideline for the use of polypropylene pipe and high density polyethylene pipe for stormwater prior to plan sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: certification that all works have been undertaken and completed in accordance with the requirements of this Permit; as Constructed details in accordance with Council’s Planning Scheme Policy; maintenance and operational manuals for all proprietary or site specific devices a 12 month minimum maintenance period for civil works that would not be impacted by a failure of the alternate poly pipe types a 5 year minimum maintenance period for civil works that would be impacted by a failure of the alternate poly pipe types. Please note that the works “impacted” includes the road formation, paths etc that have poly pipes below Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a Council inspection reveals works do not comply with approval requirements submitted certification falsely states works comply with approval requirements. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability (i.e. until house construction has occurred on all lots), Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: evidence that the site has been effectively stabilised in the short term; evidence that soil has been adequately ameliorated; evidence that seed of annual and perennial grass species has been applied at an adequate rate; and that grass seed has germinated at a density that is likely to achieve an effective grass cover. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Landscaping (As per requirements of higher order approval RAL21/0017) Development Permit for Building Works All building work. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Mark Lewis Coordinator - Engineering Enc: Appeal Rights Approved Plans/Documents cc. Unitywater DECISION NOTICE HISTORY Original Decision Notice – 3 June 2022 Decision Notice - Minor OPW22/0104.02; amend condition 1. Delete condition 3, amend condition 56 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 4 of 4 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.