SUPERSEDED Negotiated Decision Notice - 010.2008.00000256.001 [As Published] · 142008.256
2008/256
L-DT-907 OP1 Details – EDAW 12 Feb 2008
2. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
3. All trees must be planted a minimum distance of 1 metre from all services. All koala food and
habitat trees must have any trenches located a minimum of 1.5m from the tree trunk, with
trenches within 4m of the tree trunk to be on one side of the tree only; tree roots greater than
100mm diameter will generally not be cut but will be protected by tunnelling or bridging, and
tree roots less than 100mm diameter will be cut cleanly and appropriately treated.
4. Retaining walls are to be finished in accordance with the approved Landscape Management
report.
5. Any retaining wall not forming part of the pool or building and greater than 800mm in height
(excluding crib walls) must have timber posts installed at 10 m intervals with a diameter
greater than 200mm for koala access, or retaining walls must have modest slope and suitable
textures to facilitate climbing by koalas.
6. Any unfenced pools must have a rope installed for koalas to exit the pool.
7. Work required on and around existing trees is to be supervised and instructed under the
guidance of a suitably qualified arborist. Prior to the felling or lopping of trees in construction
work areas a qualified fauna spotter is to assess the trees for the presence of fauna, and
recommend appropriate action.
8. Protection of trees is to be carried out during building work. Trees to be retained on sites are
to be isolated with orange safety mesh around the tree’s canopy ‘drip line’, or generally to a
minimum distance of 1.5m from the trunk where this is not practically possible. No earth is to
be deposited around the base of any tree.
9. The relevant requirements of the Flora and Fauna Implementation Management Plan and the
Koala Implementation Management Plan must be complied with at all times.
10. The landscaping construction must be implemented in accordance with horticultural industry
best practices.
11. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents in the vicinity of the development.
12. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by the Manager - Land Development or his
nominee.
13. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines
can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways.
14. The requirements of this development approval are to be effected, prior to the use of the
relevant premises. Council reserves the right to call upon the bond or guaranteed sum
applicable to the overall site to effect compliance with conditions.
15. This Development Permit lapses if the development has not happened by 24 June 2010,
unless application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
4 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - 010.2008.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 61 KB (small file)
- File type
No other editions are linked here.