4.2.3 Rainfall Data
The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/1973 –
31/12/1983, as outlined in the MUSIC Modelling Guidelines for South East Queensland –
Version 1 December 2010.
The mean Annual Rainfall for Cooroy Composite 1973 – 83 = 1600mm
4.3 MUSIC Modelling Results
The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC version 6.3.0 is capable of incorporating
rainwater re-use in the model. These features have been used in making comparisons between
different stormwater management systems for this report.
4.3.1 Water Quality Objectives
This model meets the pollution load reduction target as detailed in Water by Design Deemed to
Comply Solutions – Stormwater Quality Management (South East Queensland) version 1.0 –
Table A-2 (2010). The following have been included in Appendix 2:
The treatment train effectiveness for the system.
The MUSIC Version 6.3.0 Summary Report.
The information above indicates that the additions to the NoosaCare Kabara site and the
proposed stormwater treatment train will achieve reductions in pollutant loads as detailed in
Table 4.2 below.
TABLE 4.2: COMPARISON OF LOAD REDUCTIONS
Parameter MUSIC POLLUTANT
REDUCTION LOAD
RESULT REDUCTION
TARGETS
Flow 12.5%
Total Suspended Solids 85% 80%
Total Phosphorous 59% 60%
Total Nitrogen 65% 45%
Gross Pollutants 100%
4.3.2 Assessment of Results
The developed site has been modelled as a series of commercial sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD) treatment trains. Plan No’s 2160-01 to 03
shows the proposed locations of the rainwater tank, bio-retention swale and bio-retention basin.
The reductions listed in Section 4.3.1 above comply with Council’s requirements. Therefore, it is
considered that the proposed stormwater treatment system is currently sufficient to reduce the
pollutants prior to exiting the site. The 59% reduction of Total Phosphorus from the proposed
system is just below the target of 60%, which is considered within an acceptable error range.
13
2160, Kabara Upgrade, Cooroy IWMP.doc January 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.