Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2160 IWMP Report_Jan2022

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Civil, Environmental &
Hydraulic Engineers



                         15


[OCR of page images]
 

 

ROOFWATER DOWNPIPES

 

   
 

 

 

 

 

 

 

 

 

 

 

|
DN150 OVERFLOW
PIPE TO GULLY PIT
FIRST FLUSH
DIVERTER
DN150 OUTLET TO
DN132 ORIFICE
4,000L TANK
{ASSUME TANK IS 0.8m DIA X 2.9m WIDTH x 1,8 HIGH)
project
Callaghan & Toth | PROPOSED KABARA HOSTEL EXTENSION TYPICAL DETENTION TANK
Civil, Environmental & location
Hydraulic Engineers | 99 TOPAZ STREET COOROY
Lo eet ee ;
—H pn: se74gost Fox 54749081 Figure 4.2
www.callaghanandtoth.com.au
Scale: NTS 15

 

 
Log in to download the original file

2160 IWMP Report_Jan2022.pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.