Original source · versioned page text
2160 IWMP Report_Jan2022
PRE DEVELOPMENT noosa 100-Year Duration=6 min, Inten=295.9 mm/hr, Cf=1.20
Prepared by HP Inc. Printed 20/01/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing Equivalent Runoff Area=586.0 m² 0.00% Impervious Runoff Depth=34 mm
Tc=6.0 min Frequency Adjusted C=0.84 Runoff=0.04052 m³/s 0.020 Ml
Subcatchment 2S: Existing Runoff Area=2,000.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min C=1.00 Runoff=0.16463 m³/s 0.080 Ml
Reach 4R: Creek Inflow=0.20514 m³/s 0.100 Ml
Outflow=0.20514 m³/s 0.100 Ml
Total Runoff Area = 0.2586 ha Runoff Volume = 0.100 Ml Average Runoff Depth = 39 mm
22.66% Pervious = 0.0586 ha 77.34% Impervious = 0.2000 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.