14 >                  Conclusion

It is proposed to provide a new water property connection to the existing water main in Bottlebrush
Avenue to service a lot. The existing property connection and meter service will be abandoned in
accordance with Unitywater requirement.

It is proposed to provide a new sewer property connection to the existing main located within site to
service a lot.

The proposed multi-residential development will be accessed via new individual crossovers to NSC
standard drawings, off Bottlebrush Avenue. The driveways will be constructed as per Noosa council and
Australian Standard requirement.

The proposed development will require earthworks to provide the development requirements and allow
for stormwater discharge to Bottlebrush Avenue. All earthworks undertaken on site will be compliant with
all relevant Australian Standards.

As no excavation is proposed to expose subsoil at or below RL 5.0m, the development would not be
subject to the State Planning Policy July 2017 and consequently there is no requirement for an Acid
Sulfate Soil investigation to be undertaken as part of the Development Application.

The development will be serviced for electricity and telecommunications via new connections to the
existing overhead and underground infrastructure in Bottlebrush Avenue.

There are no gas mains in the vicinity of the site, if gas is required to service the development, APA will
need to be contacted to arrange a connection.



15 >                  Limitations of Report

MPN have prepared this report for the proposed residential subdivision at 23 Bottlebrush Avenue, Noosa
Head, in accordance with MPN’s proposal to John Haines. This report is provided for the exclusive use of
John Haines for this specific project and its requirements. It should not be used or relied upon by a third
party and MPN accepts no responsibility for the use of this report by any party other than John Haines.




                                                                                                                                                             12
Inspired engineering

22 May 2025
https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/10000-10999/10200-10299/10256/Report/22-05-25 Civil Engineering Report_Issue A.docx

Log in to download the original (Civil Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.