Original source · versioned page text
Civil Engineering Report
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
14 > Conclusion It is proposed to provide a new water property connection to the existing water main in Bottlebrush Avenue to service a lot. The existing property connection and meter service will be abandoned in accordance with Unitywater requirement. It is proposed to provide a new sewer property connection to the existing main located within site to service a lot. The proposed multi-residential development will be accessed via new individual crossovers to NSC standard drawings, off Bottlebrush Avenue. The driveways will be constructed as per Noosa council and Australian Standard requirement. The proposed development will require earthworks to provide the development requirements and allow for stormwater discharge to Bottlebrush Avenue. All earthworks undertaken on site will be compliant with all relevant Australian Standards. As no excavation is proposed to expose subsoil at or below RL 5.0m, the development would not be subject to the State Planning Policy July 2017 and consequently there is no requirement for an Acid Sulfate Soil investigation to be undertaken as part of the Development Application. The development will be serviced for electricity and telecommunications via new connections to the existing overhead and underground infrastructure in Bottlebrush Avenue. There are no gas mains in the vicinity of the site, if gas is required to service the development, APA will need to be contacted to arrange a connection. 15 > Limitations of Report MPN have prepared this report for the proposed residential subdivision at 23 Bottlebrush Avenue, Noosa Head, in accordance with MPN’s proposal to John Haines. This report is provided for the exclusive use of John Haines for this specific project and its requirements. It should not be used or relied upon by a third party and MPN accepts no responsibility for the use of this report by any party other than John Haines. 12 Inspired engineering 22 May 2025 https://mpncnetau.sharepoint.com/sites/Administration/Shared Documents/10000-10999/10200-10299/10256/Report/22-05-25 Civil Engineering Report_Issue A.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.