Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Civil Engineering Report

of 76

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 39, section 1. The text section number identifies this passage in the reader.

All underground cables shall be treated as being energised. Where a cable is located that is                                                                      For Emergency Situations
not represented on the ENERGEX BYDA map, then ENERGEX shall be contacted immediately.                                                                               Please Call 13 19 62




                                                                                                                                                                                                                          BYDA



                                                                                                                                                                                                         Sequence: 254747512
                                                                                                                                                                                                         Date:     08/05/2025

                                                                                                                                                                                                         Scale:           1:500
                                                                                                                                                                                                         Tile No:         1




                                                                                                                                                                                                              LEGEND




                                                                                                                                                                                                             AS5488 Category “D” Plan




                                                                                                                                                                                                     DISCLAIMER: While reasonable measures
                                                                                                                                                                                                     have been taken to ensure the accuracy of the
                                                                                                                                                                                                     information contained in this plan response,
                                                                                                                                                                                                     neither Energex nor Pelican Corp shall have
                                                                                                                                                                                                     any liability whatsoever in relation to any loss,
                                                                                                                                                                                                     damage, cost or expense arising from the use
                                                                                                                                                                                                     of this plan response or the information contained
                                                                                                                                                                                                     in it or the completeness or accuracy of such
                                                                                                                                                                                                     information. Use of such information is subject to
                                                                                                                                                                                                     and constitutes acceptance of these terms.
This output provides details of the ENERGEX electrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.   Plans generated 08/05/2025 by Pelicancorp TicketAccess Software | www.pelicancorp.com

Log in to download the original (Civil Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.