Original source · versioned page text
Civil Engineering Report
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
EROSION AND SEDIMENT CONTROL CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Erosion and drainage control, sediment capture and stormwater runoff PO1 AO1.1 RO1 Development design, density, layout, and Construction works are designed, planned and All Erosion and Sediment control for staging provide for erosion control, drainage executed with respect to the principles of construction activities will be completed in control and sediment capture and treatment erosion reduction, drainage management and accordance with the IECA guidelines. Further during the construction phase. sediment capture in accordance with Appendix information is provided within the stormwater 2, Table A of the Queensland State Planning management plan. Policy and International Erosion Control Association Best Practice Erosion and Sediment Control (BPESC) 2008; AND AO1.2 Construction works are designed and managed to restrict the extent of clearing and soil exposure to that necessary for access, and safe construction; AND https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10200-10299/10256/codes/22-05-25 erosion and sediment control code_issue a.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.