EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
23 Bottlebrush Avenue, Noosa Head
22 May 2025
             PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                         RESPONSE
                                                                         Best Practice Erosion and Sediment Control
                                                                         (BPESC) 2008; and
                                                                    d) temporary or permanent downpipes are
                                                                         connected to the stormwater system before
                                                                         laying the roof; or

                                                                    e) localised erosion is avoided by directing
                                                                       flow from downpipes over non-erosive
                                                                       areas.

Works in a watercourse

PO2                                                                AO2.1                                                             RO2
Construction activities within watercourses are                    Work within waterways must be undertaken in                       Not Applicable. No proposed works occurring in
planned to prevent erosion, construction failure                   accordance with Best Practice                                     a water course
and associated sedimentation.
                                                                   Erosion and Sediment Control, Appendix I –
                                                                   Instream works, Sections 14 and 16 International
                                                                   Erosion Control Association 2008.

                                                                   AO2.2
                                                                   Temporary vehicular crossings of waterways
                                                                   must be designed and constructed to convey
                                                                   flows for the 50%AEP event and remain stable
                                                                   for all rainfall events up to 10%AEP event.




https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10200-10299/10256/codes/22-05-25 erosion and sediment control code_issue a.docx
                                                                                              Page 3

Log in to download the original (Civil Engineering Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.