Original source · versioned page text
Civil Engineering Report
Original PDF page 46, section 1. The text section number identifies this passage in the reader.
EROSION AND SEDIMENT CONTROL CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Best Practice Erosion and Sediment Control (BPESC) 2008; and d) temporary or permanent downpipes are connected to the stormwater system before laying the roof; or e) localised erosion is avoided by directing flow from downpipes over non-erosive areas. Works in a watercourse PO2 AO2.1 RO2 Construction activities within watercourses are Work within waterways must be undertaken in Not Applicable. No proposed works occurring in planned to prevent erosion, construction failure accordance with Best Practice a water course and associated sedimentation. Erosion and Sediment Control, Appendix I – Instream works, Sections 14 and 16 International Erosion Control Association 2008. AO2.2 Temporary vehicular crossings of waterways must be designed and constructed to convey flows for the 50%AEP event and remain stable for all rainfall events up to 10%AEP event. https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10200-10299/10256/codes/22-05-25 erosion and sediment control code_issue a.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.