Original source · versioned page text
BRN23_Construction Set_Rev B_230327
Klip-lok(or similar) metal sheet roof @ 3° pitch
3,600 CL
3,600 CL
2,700 CL
2,700 CL
2,400 JL
2,400 JL
2,100
400
Raised garden beds 200 x 200 Painted timber posts
3 Elevation 03
1:100
3,600 CL
2,700 CL
2,400 JL
2,100
4 Elevation 04
1:100
Client Name Drawing Title: Scale: As Shown @ A3 Date: 22.02.2022
15 Ross Cresent Mark Bain Constructions ELEVATIONS 02 Status: SD Checked By: NPH
Sunshine Beach Project Name
The builder shall check and verify all dimensions and verify
REVISION A Queensland 4567 Proposed New Residence
any errors and omissions to the Designer. Do not scale off
drawings. Drawings shall not be issued for construction
Project No: Drawing No.:
BRN023 SD05
purposes until issued by the Designer for construction. In the
23 Beckmans Road, Tewantin,
Ph 07 5447 4443 Qld, 4565
first instance contact :
Mr Nigel Heald 07 5447 4443
GSPublisherVersion 0.0.100.100
V:\14_Nigel's Backup\MBC\BECKMANS ROAD\ARCHIVE\BECKMANS ROAD REV B.pln Plot Date: 28/02/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.