Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2016-03-10 Ordinary Meeting Agenda

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                            10 MARCH 2016


PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS
1 MARCH 2016 – Crs. Joe Jurisevic (Chair), Noel Playford, Tony Wellington and
Frank Wilkie
Other Councillors in Attendance: Cr Sandy Bolton


1    BUILDING & PLUMBING - UPDATE REPORT TO 31 DECEMBER 2015
     That Council note the report by the Building and Plumbing Manager to the Planning &
     Organisation Committee Meeting dated 1 March 2016 providing an update on the activities
     of the Building and Plumbing Branch for the period ending 31 December 2015.


2    REQUEST   TO   CHANGE    EXISTING     DEVELOPMENT  APPROVAL   FOR
     RECONFIGURATION OF A LOT (1 LOT INTO 2 LOTS & PARK) AT 178 EUMUNDI
     NOOSA ROAD NOOSAVILLE - REC12/0014.02
     That Council note the report by the Coordinator Engineering to the Planning & Organisation
     Committee Meeting dated 1 March 2016 regarding application No. REC12/0014.02 to
     Change Condition 9 of the Development Permit to Reconfigure a Lot (1 Lot into 2 Lots &
     Park) at 178 Eumundi Noosa Road, Noosaville described as Lot 80 on SP 211687 and
     agree to change Condition 9 to the following:
     Earthworks
     9.1   Certification of the earthworks undertaken on the lots provided by a RPEQ must be
           submitted to Council prior to the sealing of the survey plan. The certification must
           include:
           (a)   Certification that the works have been undertaken in accordance with the
                 provisions of AS 3798 ‘Guidelines on Earthworks for Commercial and
                 Residential Development’
           (b)   Test results as required by AS 3798,
           (c)   Certification of the quality and uniformity of the materials.
           This certification must be lodged with any Development Permit for Building works to
           the Building Certifier.
     OR
     9.2   The owner of the subject land will enter into a covenant with the Council pursuant to
           Section 97A of the Land Title Act 1994.
           The purpose of the covenant is to stipulate that any development of proposed Lot 102
           is to be carried out in accordance with the specifications and recommendations of the
           attached report by Douglas Partners dated 7 September 2015 reference “Report on
           Geotechnical Investigation 178 Eumundi-Noosa Road, Noosaville”.
           At the time of application for building works and/or associated earthworks, the
           applicant must provide certification from a suitably qualified geotechnical engineer
           stating that the proposed works are in accordance with the Douglas Partners report.
           The covenant will be prepared by the applicant and lodged with the Council prior to
           release of the survey plan for this approval for perusal by the Council’s solicitor at the
           cost of the applicant.




                                                                                       Page 6 of 18
Log in to download the original file

2016-03-10 Ordinary Meeting Agenda(PDF, 878KB).pdf · 899 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.