                                                         EXPLANATION OF NOTES, ABBREVIATIONS & TERMS
                                                         USED ON BOREHOLE AND TEST PIT REPORTS
DRILLING/EXCAVATION METHOD
AS           Auger Screwing                         RD                Rotary blade or drag bit                NQ         Diamond Core - 47 mm
AD           Auger Drilling                         RT                Rotary Tricone bit                      NMLC       Diamond Core - 52 mm
*V           V - Bit                                RAB               Rotary Air Blast                        HQ         Diamond Core - 63 mm
T            TC - Bit, e.g. ADT                     RC                Reverse Circulation                     HMLC       Diamond Core – 63mm
HA           Hand Auger                             PT                Push Tube                               BH         Tractor Mounted Backhoe
ADH          Hollow Auger                           CT                Cable Tool Rig                          EX         Tracked Hydraulic Excavator
DTC          Diatubre Coring                        JET               Jetting                                 EE         Existing Excavation

WB           Washbore or Bailer                     NDD               Non-destructive digging                 HAND       Excavated by Hand Methods

PENETRATION/EXCAVATION RESISTANCE
L            Low resistance . Rapid penetration possible with little effort from the equipment used
M            Medium resistance. Excavation possible at an acceptable rate with moderate effort from equipment used
H            High resistance to penetration/excavation. Further penetration is possible at a slow rate
R            Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the digging implement


These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of excavation or drilling tools,
and the experience of the operator.

WATER
                                        Water level shown at date                                                  Partial water loss
                                        Water inflow                                                               Complete water loss

GROUNDWATER NOT                         The observation of groundwater whether present or not, was not possible due to drilling water, surface seepage or cave in
OBSERVED                                of the borehole/test pit.
GROUND WATER NOT                        The borehole/test pit was dry soon after excavation. However, groundwater could be present in less permeable strata.
ENCOUNTERED                             Inflow may have been observed had the borehole/test pit been left open for a longer period.
SAMPLING AND TESTING
SPT                           Standard Penetration Test to AS1289.6.3.1-2004
4,7,11 N=18                   4,7,11 = Blows per 150mm                   N = Blows per 300mm penetration following 150mm seating
30/80mm                       Where practical refusal occurs, the blows and penetration for that interval are reported
RW                            Penetration occurred under the rod weight only
HW                            Penetration occurred under the hammer and rod weight only
HB                            Hammer double bouncing on anvil
DS                            Disturbed Sample
BDS                           Bulk disturbed sample
G                             Gas Sample
W                             Water sample
FP                            Field permeability test over section noted
FV                            Field vane shear test expressed as uncorrected shear strength (sv = peak value)
PID                           Photoionisation Detector reading in ppm
PM                            Pressuremeter test over section noted
PP                            Pocket penetrometer test expressed as instrument reading in kPa
U63                           Thin walled tube sample - number indicates nominal sample diameter in millimetres
WPT                           Water pressure tests
DCP                           Dynamic cone penetration test
CPT                           Dynamic cone penetration test

CPTu                          Static cone penetration test with pore pressure (u) measurement

ROCK CORE RECOVERY

            TCR = Total Core Recovery (%)                                     SCR = Solid Core Recovery (%)               RQD = Rock Quantity Designation (%)




    Explanation of Notes, Abbreviations & Terms Used on Borehole and Test Pit Reports                                                                  Date: 12/07/2018
    FRM-068
                                                                                                                                                       Ver. 1.03

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Geotechnical Report.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.