Council archive · source document
Attachment 5 - Geotechnical Report · MCU18/0015
Attached to the e-mail Response to Information Request (Engineering Report MUSIC Model Date & Geotechnical Report) MCU18/0015 & RAL18/0001.
J000635-002-R-Rev1 November 2018
Table 2: Seismic Data Acquisition Parameters.
Seismic source: 10 kg sledgehammer on aluminium plate
Geode-24 seismograph using Geometrics Seismodule Controller
Recording system:
software; 24-bit 24-channel recorder
Recording channels: 24 per record
Sampling rate: 0.25 ms
Record length: 2 seconds
Geophone type: 4.5 Hz single geophones
Initial offset: 12 m
Source interval: 12 m
Geophone interval: 1.5 m
The MASW seismic testing method provides a subsurface profile of seismic surface shear-wave velocities
(vs). When correlated with the borehole/test pit findings, the seismic wave velocities can be used to provide
an indication of changes in the subsurface profile along the alignment tested.
Results of the seismic testing were correlated with the available geotechnical data, our previous experience,
and published information.
Seismic survey results are presented as 2D cross sections in Figure 2, with a discussion of the results given
in Section 5.2.
5.0 INVESTIGATION FINDINGS
5.1 Geological Mapping
The Gympie Special Geology map 1 indicates that the site is located close to the contact between the
Pleistocene age quartz sand and Jurassic to Cretaceous aged quartz diorite. Image 1 shows an extract from
the geology map.
1 GYMPIE SPECIAL 1:100,000 Geological Series. Map Sheet 9445 and Part 9545, First Edition, Department of Mines and Energy, Brisbane, 1999.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Geotechnical Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.