Appendix D Geotechnical report App · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
-4- The DCP comprises a Cone of 20 mm diameter with 30 degree taper attached to steel rods of smaller section. The cone end is driven with a 9 kg hammer falling 510 mm (AS. 1289 Test 6.3.2). The test was developed initially for pavement subgrade investigations, and empirical correlations of the test results with California Bearing Ratio have been published by various Road ‘authorities. The Company has developed their own correlations with Standard Penetration tests and Density Index tests in sands. LOGS The borehole or test pit logs presented herein are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on the frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will enable the most reliable assessment but is not always practicable or possible to justify on economic grounds. In any case, the boreholes or test pits represent only a very small sample of the total subsurface conditions. The attached explanatory notes define the terms and symbols used in preparation of the logs. Interpretation of the information shown on the logs, and its application to design and construction, should therefore take into account the spacing of boreholes or test pits, the method of drilling or excavation, the frequency of sampling and testing and the possibility of other than “straight line” variations between the boreholes or test pits. Subsurface conditions between boreholes or test pits may vary significantly from conditions encountered at the borehole or test pit locations. GROUNDWATER Where groundwater levels are measured in boreholes, there are several potential problems. «Although groundwater may be present in lower permeability soils, it may enter the hole slowly or perhaps not at all during the time the hole is open. +A localized perched water table may lead to an erroneous indication of the true water table. +Water table levels will vary from time to time with seasons or recent weather changes and may not be the same at the time of construction. NOTEREP.SAM ~The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be bailed out of the bore and mud must be washed out of the hole or "reverted" if water observations are to be made. More reliable measurements can be made by use of standpipes which are read after stabilizing at periods ranging from several days to perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from perched water tables or surface water. FILL The presence of fill materials can often be determined only by the inclusion of foreign objects (eg. bricks, steel, etc.) or by distinctly unusual colour, texture or fabric. Identification of the extent of fill materials will also depend on investigation methods and frequency. Where natural soils similar to those at the site are used for fill, it may be difficult with limited testing and sampling to reliably determine the extent of the fill. The presence of fill materials is usually regarded with caution as the possible variation in density, strength and material type is much greater than with natural soil deposits. Consequently, there is an increased risk of adverse engineering characteristics or behaviour. If the volume and quality of fill is important to a project, then frequent test pit excavations are preferable to boreholes. LABORATORY TESTING Laboratory testing is normally carried out in accordance with Australian Standard 4289 "Methods of Testing Soil for Engineering Purposes". Details of the test procedure used are given on the individual report forms and the attached explanatory notes summarize important aspects of the Laboratory Test Procedures adopted. ENGINEERING REPORTS Engineering reports are prepared by qualified personnel and are based on the information obtained tation and on current engineering standards of interpre’ and analysis. Where the report has been prepared for a specific design proposal the information and interpretation may not be relevant if the design proposal is changed. If this happens, the Company SOIL SURVEYS ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Geotechnical report App.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.