2021-11-15 General Committee Meeting Agenda

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


             General
         Committee Meeting


         Monday, 15 November 2021
                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-11-15 General Committee Meeting Agenda(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 57 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                             15 NOVEMBER 2021


TABLE OF CONTENTS

ITEM                                                                    PAGE

1.     ATTENDANCE & APOLOGIES                                               3

2.     CONFIRMATION OF MINUTES                                              3

3.     PRESENTATIONS                                                        3

4.     DEPUTATIONS                                                          3

5.     ITEMS REFERRED FROM COMMITTEES                                       3

       1    51997.2283.03 - MINOR CHANGE TO AN EXISTING APPROVAL FOR
            (MULTIPLE DWELLINGS) AT 6/80-86 HILTON TCE NOOSAVILLE            3

       2    132005.1133.15 – APPLICATION FOR A MINOR CHANGE TO A
            DEVELOPMENT APPROVAL FOR 140 MULTIPLE DWELLING UNITS AND
            ASSOCIATED FACILITIES – SHOP, RESTAURANT, MULTI-FUNCTION ROOM
            AND GYM AT 75 RESORT DRIVE, NOOSA HEADS                          3

       3    TOURISM FUNDING AGREEMENT REVIEW PROCESS                         3

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                  4

       4    FURTHER REPORT - 132005.1133.15 – APPLICATION FOR A MINOR
            CHANGE TO A DEVELOPMENT APPROVAL FOR 140 MULTIPLE DWELLING
            UNITS AND ASSOCIATED FACILITIES – SHOP, RESTAURANT, MULTI-
            FUNCTION ROOM AND GYM AT 75 RESORT DRIVE, NOOSA HEADS            4

       5    FURTHER REPORT - TOURISM FUNDING AGREEMENT REVIEW PROCESS       15

       6    RAL20/0019 – PLANNING & ENVIRONMENT COURT APPEAL NO. D116 OF
            2021 – REFUSAL OF AN APPLICATION FOR RECONFIGURING A LOT – 1
            LOT INTO 2 LOTS AT 23 JIRRIMA CRESCENT, COOROIBAH               17

       7    COASTAL HAZARDS ADAPTATION PLAN & SECOND ROUND COMMUNITY
            CONSULTATION SUBMISSIONS                                        25

       8    CONTRACT NO T000048 TRAFFIC CONTROL SERVICES - TENDER AWARD     34

       9    FREE WEEKEND BUS TRIAL                                          39

       10   FINANCIAL PERFORMANCE REPORT – OCTOBER 2021                     43

       12   NOOSA SHIRE COUNCIL 2020-21 ANNUAL REPORT                       56

7.     CLOSED SESSION                                                 58




                                                                  Page 2 of 58

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                          15 NOVEMBER 2021



1.   ATTENDANCE & APOLOGIES




2.   CONFIRMATION OF MINUTES

     The Minutes of the General Committee Meeting held on 18 October 2021 be received and
     confirmed.




3.   PRESENTATIONS

     Nil.




4.   DEPUTATIONS

     Nil.




5.   ITEMS REFERRED FROM COMMITTEES

     PLANNING & ENVIRONMENT COMMITTEE

     1      51997.2283.03 - MINOR CHANGE TO AN EXISTING APPROVAL FOR (MULTIPLE
            DWELLINGS) AT 6/80-86 HILTON TCE NOOSAVILLE
            (Planning & Environment Committee Agenda, 9 November 2021, Item 1, Page 4)
            Reason for referral – for further consideration.


     2      132005.1133.15 – APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT
            APPROVAL FOR 140 MULTIPLE DWELLING UNITS AND ASSOCIATED FACILITIES
            – SHOP, RESTAURANT, MULTI-FUNCTION ROOM AND GYM AT 75 RESORT
            DRIVE, NOOSA HEADS
            (Planning & Environment Committee Agenda, 9 November 2021, Item 2, Page 16)
            Reason for referral – for a further report (refer to Report 4 in this Agenda)


     SERVICES & ORGANISATION COMMITTEE

     3      TOURISM FUNDING AGREEMENT REVIEW PROCESS
            (Services & Organisation Committee Agenda, 9 November 2021, Item 3, Page 14)
            Reason for referral – for further report (refer to Report 5 in this Agenda)




                                                                                               Page 3 of 58

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                  15 NOVEMBER 2021


6.   REPORTS DIRECT TO GENERAL COMMITTEE

     4     FURTHER REPORT - 132005.1133.15 – APPLICATION FOR A MINOR CHANGE TO
           A DEVELOPMENT APPROVAL FOR 140 MULTIPLE DWELLING UNITS AND
           ASSOCIATED FACILITIES – SHOP, RESTAURANT, MULTI-FUNCTION ROOM AND
           GYM AT 75 RESORT DRIVE, NOOSA HEADS

     Author              Coordinator Planning, Patrick Murphy
                         Environment & Sustainable Development Department

     Index               ECM/ Application/ 132005.1133.15

     Attachments         Nil


     EXECUTIVE SUMMARY
     The report to Planning & Environment Committee recommended a new condition which
     prevented the ‘Cooking Classes’ area from being used as part of the approved restaurant. The
     condition was included to preserve a previously identified shared space for residents and
     visitors staying in the site’s multiple dwelling units. The applicant has recently advised that it is
     intended for the cooking classes to be undertaken in conjunction with the approved restaurant,
     with the classes overseen by the restaurant’s signature chef. Given the acoustic report has
     addressed the use of the space for cooking classes, the proposal raises no car parking issues
     and the area can be converted to a shared space in the future it is recommended the condition
     is unnecessary and the officer recommendation has been revised accordingly.

     RECOMMENDATION
     That Council note the report by the Coordinator Planning to the Planning & Environment
     Committee meeting dated 9 November 2021 and the Further Report to the General Committee
     Meeting dated 15 November 2021 regarding application 132005.1133.15 to make a minor
     change to an existing approval for 140 Multiple Dwelling Units and Associated Facilities –
     Shop, Restaurant, Multi-Function Room and Gym situated at 75 Resort Drive Noosa Heads
     and:
     A.    Agree to change Conditions 2 and 83 to read as follows:
           2.    Development undertaken in accordance with this approval must generally comply
                 with the approved plans of development. The approved plans are listed below and
                 are as amended by the conditions herein.
             Plan No.          Rev. Plan/Document Name                                           Date
             7038-DA01         25   Masterplan Noosa Springs Resort prepared by Blackburne       22-07-21
                                    Jackson Design
             7038-DA03         14   Carparking/Basement prepared by Blackburne Jackson           20-11-2018
                                    Design
             7038-DA04         38   Ground Floor prepared by Blackburne Jackson Design           26-10-21

             7038-DA05         19   First Floor prepared by Blackburne Jackson Design            26-10-21

             7038-DA06         17   Second Floor prepared by Blackburne Jackson Design           26-10-21

             7038-DA07         12   Site Section prepared by Blackburne Jackson Design           08-10-2018

             7038-DA08         13   Site Section prepared by Blackburne Jackson Design           08-10-2018



                                                                                         Page 4 of 58

Section 5

GENERAL COMMITTEE MEETING AGENDA                                          15 NOVEMBER 2021


        Plan No.    Rev. Plan/Document Name                                             Date
        7038-DA09   16   Indicative Apartment Layouts prepared by Blackburne            10-08-2018
                         Jackson Design
        7038-DA10   14   Indicative Apartment Layouts prepared by Blackburne            10-08-2018
                         Jackson Design
        7038-DA12   09   Perspective sketches prepared by Blackburne Jackson Design 08-10-2018
        7038-DA14   06   Finishes Palette prepared by Blackburne Jackson Design         29-09-17

        7038-DA17   05   Indicative Apartment Layouts prepared by Blackburne            10-08-2018
                         Jackson Design
        7038-DA19   07   Building 15 Elevations prepared by Blackburne Jackson          10-08-2018
                         Design
        7038-DA20   08   Block 18 - Elevations prepared by Blackburne Jackson           08-10-2018
                         Design
        7038-DA21   08   Building 3 Elevations prepared by Blackburne Jackson           01-11-2018
                         Design
        7038-DA23   11   Block 2 - Elevations prepared by Blackburne Jackson            01-11-2018
                         Design
        DD1.1       F    Location Plan prepared by Sparks Architects                    08-06-2017

        DD1.3       H    Unit Type 1 prepared by Sparks Architects                      08-06-2017

        DD1.4       H    Unit Type 2 prepared by Sparks Architects                      08-06-2017

        DD1.6       E    First Floor Plan Block 7 prepared by Sparks Architects         08-06-2017

        DD1.7       D    Roof Plan Block 7 prepared by Sparks Architects                08-06-2017

        DD1.9       E    First Floor Plan Block 8 prepared by Sparks Architects         08-06-2017

        DD1.10      D    Roof Plan Block 8 prepared by Sparks Architects                08-06-2017

        DD1.12      E    First Floor Plan Block 9 prepared by Sparks Architects         08-06-2017

        DD1.13      D    Roof Plan Block 9 prepared by Sparks Architects                08-06-2017

        WD2.1       B    Elevations prepared by Sparks Architects                       23-08-2017

        WD2.2       B    North Elevations Block 7 prepared by Sparks Architects         23-08-2017

        WD2.3       B    East Elevations Block 7 prepared by Sparks Architects          23-08-2017

        WD2.4       B    South Elevations Block 7 prepared by Sparks Architects         23-08-2017

        WD2.5       L    West Elevations Block 7 prepared by Sparks Architects          10-05-2019

        WD2.6       B    Elevations Block 8 prepared by Sparks Architects               23-08-2017

        WD2.7       B    Elevations Block 9 prepared by Sparks Architects               23-08-2017

        DD3.1       D    Sections Block 7 prepared by Sparks Architects                 08-06-2017

        DD3.2       B    Section Block 7 prepared by Sparks Architects                  08-06-2017

        DD3.3       D    Section Block 8 prepared by Sparks Architects                  08-06-2017

        DD3.4       D    Section Block 9 prepared by Sparks Architects                  08-06-2017



                                                                                  Page 5 of 58

Section 6

GENERAL COMMITTEE MEETING AGENDA                                       15 NOVEMBER 2021


        Plan No.    Rev. Plan/Document Name                                           Date
        DD4.1       G    3D prepared by Sparks Architects                             08-06-2017

        DD4.2       G    3D prepared by Sparks Architects                             08-06-2017

        DD4.3       G    3D prepared by Sparks Architects                             08-06-2017

        DD4.4       G    3D prepared by Sparks Architects                             08-06-2017

        DD4.5       G    3D prepared by Sparks Architects                             08-06-2017

        DD4.6       G    3D prepared by Sparks Architects                             08-06-2017

        DD4.7       G    3D prepared by Sparks Architects                             08-06-2017

        5622_A01-   E    CTS 400 Site Plan – Level 1 prepared by Blackburne           JANUARY
        10_E             Jackson Design
        7088_A01-   B    CTS 100 Site Plan – Level 1 prepared by Blackburne           03-10-17
        21_B             Jackson Design
        7088_A01-   B    CTS 300 Site Plan – Level 1 prepared by Blackburne           03-10-17
        31_B             Jackson Design
        7088_A02-   G    Block 15 Basement Level – Floor Plan prepared by             31-08-2018
        30_G             Blackburne Jackson Design
        7088_A02-   H    Block 15 Level 1 – Floor Plan prepared by Blackburne         02-10-2018
        31_H             Jackson Design
        7088_A02-   H    Block 15 Level 2 – Floor Plan prepared by Blackburne         02-10-2018
        32_H             Jackson Design
        7088_A02-   H    Block 15 Level 3 – Floor Plan prepared by Blackburne         02-10-2018
        33_H             Jackson Design
        7098_A02-   M    Block 3 Basement Level – Floor Plan prepared by              05-09-2018
        01_M             Blackburne Jackson Design
        7098_A02-   L    Block 3 Level 1 – Floor Plan prepared by Blackburne          05-09-2018
        02_L             Jackson Design
        7098_A02-   J    Block 3 Level 2 – Floor Plan prepared by Blackburne          05-09-2018
        03_J             Jackson Design
        7098_A02-   K    Block 3 Level 3 – Floor Plan prepared by Blackburne          05-09-2018
        04_K             Jackson Design
        7088_A02-   G    Block 16 Basement Level – Floor Plan prepared by             31-08-2018
        90_G             Blackburne Jackson Design
        7088_A02-   H    Block 16 Level 1 – Floor Plan prepared by Blackburne         02-10-2018
        91_H             Jackson Design
        7088_A02-   H    Block 16 Level 2 – Floor Plan prepared by Blackburne         02-10-2018
        92_H             Jackson Design
        7088_A02-   H    Block 16 Level 3 – Floor Plan prepared by Blackburne         02-10-2018
        93_H             Jackson Design
        7088_A04-   D    Block 15 - Elevations prepared by Blackburne Jackson         04-09-17
        10_D             Design
        7088_A04-   D    Block 15 - Elevations prepared by Blackburne Jackson         04-09-17
        11_D             Design
        7098_A04-   D    Block 3 - Elevations prepared by Blackburne Jackson          03-10-17
        01_D             Design


                                                                                Page 6 of 58

Section 7

GENERAL COMMITTEE MEETING AGENDA                                        15 NOVEMBER 2021


        Plan No.     Rev. Plan/Document Name                                           Date
        7098_A04-    D    Block 3 - Elevations prepared by Blackburne Jackson          03-10-17
        02_D              Design
        7088_A04-    D    Block 16 - Elevations prepared by Blackburne Jackson         04-09-17
        30_D              Design
        7088_A04-    D    Block 16 - Elevations prepared by Blackburne Jackson         04-09-17
        31_D              Design
        7088_A05-    C    Block 15 - Sections prepared by Blackburne Jackson           04-09-17
        10_C              Design
        7088_A05-    C    Block 16 - Sections prepared by Blackburne Jackson           04-09-17
        15_C              Design
        7088_AO17-   02   Parkridge Building 2 & 14 prepared by Blackburne             09-10-2018
        01_02             Jackson Design
        7088_AO17-   03   Parkside Buildings 18-21 prepared by Blackburne              09-10-2018
        03_03             Jackson Design
        7088_AO17-   03   Parkside Buildings 15 & 16 prepared by Blackburne            09-10-2018
        04_03             Jackson Design
        7088_AO17-   03   Parkside Buildings 17 & 22 prepared by Blackburne            09-10-2018
        05_03             Jackson Design
        7088_AO17-   03   Parkside Buildings 5 & 6 prepared by Blackburne              09-10-2018
        06_03             Jackson Design
        7038_DA30    03   CTS 100, 700 & 800 Site Plan prepared by Blackburne          08-10-2018
                          Jackson Design
        7038_DA31    02   CTS 300 & 500 Site Plan prepared by Blackburne               08-10-2018
                          Jackson Design
        7038_DA32    02   CTS 900 Site Plan prepared by Blackburne Jackson             08-10-2018
                          Design
        7038_DA33    03   Block 4 – Elevations prepared by Blackburne Jackson          01-11-2018
                          Design
        7038_DA34    03   Block 4 – Elevations prepared by Blackburne Jackson          01-11-2018
                          Design
        7038_DA35    03   Block 5 – Elevations prepared by Blackburne Jackson          01-11-2018
                          Design
        7038_DA36    03   Block 5 – Elevations prepared by Blackburne Jackson          01-11-2018
                          Design
        7038_DA37    02   Block 6 – Elevations prepared by Blackburne Jackson          08-10-2018
                          Design
        7038_DA38    02   Block 6 – Elevations prepared by Blackburne Jackson          08-10-2018
                          Design
        7038_DA39    04   Block 14 – Elevations prepared by Blackburne Jackson         05.02.2019
                          Design
        7038_DA40    04   Block 14 – Elevations prepared by Blackburne Jackson         05.02.2019
                          Design
        7038_DA41    02   Block 17 – Elevations prepared by Blackburne Jackson         09-08-2018
                          Design
        7038_DA42    02   Block 17 – Elevations prepared by Blackburne Jackson         09-08-2018
                          Design


                                                                                 Page 7 of 58

Section 8

GENERAL COMMITTEE MEETING AGENDA                                       15 NOVEMBER 2021


        Plan No.    Rev. Plan/Document Name                                            Date
        7038_DA43   02   Block 21 – Elevations prepared by Blackburne Jackson          09-10-2018
                         Design
        7038_DA44   02   Block 21 – Elevations prepared by Blackburne Jackson          09-10-2018
                         Design
        7038_DA45   04   Block 22 – Elevations prepared by Blackburne Jackson          01-11-2018
                         Design
        7038_DA46   04   Block 22 – Elevations prepared by Blackburne Jackson          01-11-2018
                         Design
        7038_DA47   03   Block 22 – Roof prepared by Blackburne Jackson                09-10-2018
                         Design
        7038_DA61   02   Block 2 – Basement prepared by Blackburne Jackson             09-10-2018
                         Design
        7038_DA62   02   Block 2 – Level 1 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA63   02   Block 2 – Level 2 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA64   02   Block 2 – Level 3 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA65   02   Block 4 – Basement – Floor Plan prepared by                   09-10-2018
                         Blackburne Jackson Design
        7038_DA66   02   Block 4 – Level 1 – Floor Plan prepared by Blackburne         09-10-2018
                         Jackson Design
        7038_DA67   02   Block 4 – Level 2 – Floor Plan prepared by Blackburne         09-10-2018
                         Jackson Design
        7038_DA68   02   Block 4 – Level 3 – Floor Plan prepared by Blackburne         09-10-2018
                         Jackson Design
        7038_DA69   02   Block 5 – Basement prepared by Blackburne Jackson             09-10-2018
                         Design
        7038_DA70   02   Block 5 – Level 1 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA71   02   Block 5 – Level 2 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA72   02   Block 5 – Level 3 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA73   02   Block 6 – Basement prepared by Blackburne Jackson             09-10-2018
                         Design
        7038_DA74   02   Block 6 – Level 1 prepared by Blackburne Jackson              09-10-2018
                         Design
        7038_DA75   02   Block 6 – Level 2 – Floor Plan prepared by Blackburne         09-10-2018
                         Jackson Design
        7038_DA76   02   Block 6 – Level 3 prepared by Blackburne Jackson              09-10-2018
                         Design
        7105_A02-   L    Block 14 – Basement prepared by Blackburne Jackson            03-02-2020
        01_L             Design
        7038_DA78   03   Block 14 – Level 1 prepared by Blackburne Jackson             05.02.2019
                         Design



                                                                                 Page 8 of 58

Section 9

GENERAL COMMITTEE MEETING AGENDA                                       15 NOVEMBER 2021


        Plan No.     Rev. Plan/Document Name                                           Date
        7038_DA79    02   Block 14 – Level 2 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA80    02   Block 17 – Basement prepared by Blackburne Jackson           09-08-2018
                          Design
        7038_DA81    02   Block 17 – Level 1 prepared by Blackburne Jackson            09-08-2018
                          Design
        7038_DA82    02   Block 17 – Level 2 prepared by Blackburne Jackson            09-08-2018
                          Design
        7038_DA83    02   Block 17 – Level 3 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA84    02   Block 18 – Undercroft prepared by Blackburne Jackson         09-10-2018
                          Design
        7038_DA85    02   Block 18 – Level 1 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA86    02   Block 18 – Level 2 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA87    02   Block 19 – Undercroft prepared by Blackburne Jackson         09-10-2018
                          Design
        7038_DA88    02   Block 19 – Level 1 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA89    02   Block 19 – Level 2 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA90    02   Block 20 – Undercroft prepared by Blackburne Jackson         09-10-2018
                          Design
        7038_DA91    02   Block 20 – Level 1 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA92    02   Block 20 – Level 2 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA93    02   Block 21 – Undercroft prepared by Blackburne Jackson         09-10-2018
                          Design
        7038_DA94    02   Block 21 – Level 1 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA95    02   Block 21 – Level 2 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA96    02   Block 22 – Basement prepared by Blackburne Jackson           09-10-2018
                          Design
        7038_DA97    02   Block 22 – Level 1 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA98    02   Block 22 – Level 2 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA99    02   Block 22 – Level 3 prepared by Blackburne Jackson            09-10-2018
                          Design
        7038_DA100   04   Block 2 – Sections prepared by Blackburne Jackson            01-11-2018
                          Design
        7038_DA101   04   Block 2 – Sections prepared by Blackburne Jackson            01-11-2018
                          Design


                                                                                 Page 9 of 58

Section 10

GENERAL COMMITTEE MEETING AGENDA                                        15 NOVEMBER 2021


        Plan No.      Rev. Plan/Document Name                                          Date
        7038_DA102    03   Block 3 – Sections prepared by Blackburne Jackson           01-11-2018
                           Design
        7038_DA103    03   Block 3 – Sections prepared by Blackburne Jackson           01-11-2018
                           Design
        7038_DA104    03   Block 4 – Sections prepared by Blackburne Jackson           01-11-2018
                           Design
        7038_DA105    03   Block 4 – Sections prepared by Blackburne Jackson           01-11-2018
                           Design
        7038_DA106    03   Block 5 – Sections prepared by Blackburne Jackson           01-11-2018
                           Design
        7038_DA107    03   Block 5 – Sections prepared by Blackburne Jackson           01-11-2018
                           Design
        7038_DA108    02   Block 6 – Sections prepared by Blackburne Jackson           09-10-2018
                           Design
        7038_DA109    02   Block 6 – Sections prepared by Blackburne Jackson           09-10-2018
                           Design
        7038_DA110    04   Block 14 – Sections prepared by Blackburne Jackson          05.02.2019
                           Design
        7038_DA111    04   Block 14 – Sections prepared by Blackburne Jackson          05.02.2019
                           Design
        7038_DA112    02   Block 16 – Sections prepared by Blackburne Jackson          09-08-2018
                           Design
        7038_DA113    01   Block 16 – Sections prepared by Blackburne Jackson          09-08-2018
                           Design
        7038_DA114    03   Block 17 – Sections prepared by Blackburne Jackson          09-08-2018
                           Design
        7038_DA115    03   Block 17 – Sections prepared by Blackburne Jackson          09-08-2018
                           Design
        7038_DA116    02   Block 19 – Sections prepared by Blackburne Jackson          09-10-2018
                           Design
        7038_DA117    02   Block 19 – Sections prepared by Blackburne Jackson          09-10-2018
                           Design
        7038_DA118    02   Block 20 – Sections prepared by Blackburne Jackson          09-10-2018
                           Design
        7038_DA119    02   Block 20 – Sections prepared by Blackburne Jackson          09-10-2018
                           Design
        7038_DA120    02   Block 21 – Sections prepared by Blackburne Jackson          09-10-2018
                           Design
        7038_DA121    02   Block 21 – Sections prepared by Blackburne Jackson          09-10-2018
                           Design
        7038_DA122    03   Block 22 – Sections prepared by Blackburne Jackson          01-11-2018
                           Design
        7038_DA123    03   Block 22 – Sections prepared by Blackburne Jackson          01-11-2018
                           Design
        7088_A04-55   A    Block 18 – Elevations prepared by Blackburne Jackson        29.06.2018
                           Design


                                                                                Page 10 of 58

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                15 NOVEMBER 2021


        Plan No.          Rev. Plan/Document Name                                           Date
        7088_A04-56       A      Block 18 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        7088_A04-60       A      Block 19 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        7088_A04-61       A      Block 19 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        7088_A04-65       A      Block 20 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        7088_A04-66       A      Block 20 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        7088_A04-70       A      Block 21 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        7088_A04-71       A      Block 21 – Elevations prepared by Blackburne Jackson       29.06.2018
                                 Design
        WD1.3             I      Site Plan prepared by Sparks Architects                    16-05-2018
        WD1.8             I      Ground Floor Plan Block 7 prepared by Sparks               16-05-2018
                                 Architects
        WD1.11            H      Ground Floor Plan Block 8 prepared by Sparks               16-05-2018
                                 Architects
        WD1.14            H      Ground Floor Plan Block 9 prepared by Sparks               16-05-2018
                                 Architects
        5737_DA‐02‐       06     Level 1 Floor Plan prepared by Blackburne Jackson          05‐08‐21
        01                       Design
        5737_DA‐02‐       04     Upper Level 1 Floor Plan prepared by Blackburne            22-07-21
        02                       Jackson Design
        5737_DA‐02‐       01     Roof Floor Plan prepared by Blackburne Jackson Desig       22-07-21
        03                       n
        5737_DA‐04‐       04     Elevations prepared by Blackburne Jackson Design           22-07-21
        01
        5737_DA‐05‐       01     Sections prepared by Blackburne Jackson Design             22-07-21
        01
        5737_DA‐17‐       05     Perspective Views prepared by Blackburne Jackson           05‐08‐21
        01                       Design

       83.   The development shall comply with the Noise Management Plan (Report No:
             R21055/D3295/Rev.0/25.08.21) prepared by David Moore & Associates and dated
             25 August 2021 to the reasonable satisfaction of Council, including:
             a.    The necessary and appropriate noise control measures incorporated into the
                   façade of the apartments and within the restaurant/café in the Resort
                   Facilities Building. These measures shall include:
                   i.         Upgraded glazing and air-conditioning to the potentially affected
                              apartments;
                   ii.        Strategically placed wing walls on balconies to screen the apartment
                              and balconies from outdoor dining areas;
                   iii.       Deleted
                   iv.        The restaurant/café use is to operate between the hours of 6am and
                              12pm only;

                                                                                     Page 11 of 58

Section 12

GENERAL COMMITTEE MEETING AGENDA                                           15 NOVEMBER 2021


                   v.      After 10pm all doors/windows must be fully closed;
                   vi.     The underside of all roof elements over outdoor dining areas
                           associated with the café use are to be lined with acoustic absorptive
                           lining minimum NRC 0.7;
                   vii.    No dining is permitted outside the building.
                   viii.   All amplified noise at the premises must be conducted through a sound
                           limiting device at all times to ensure that noise does not exceed the
                           following: during the daytime and evening (0600 to 2200) must not
                           exceed 92 dB(A) LWA, 90dB(A) LAeq, adj, T at 3 metres from the
                           speakers.
                   ix.     Any live performer must be required to play through the in-house
                           system. No speakers (in addition to the in-house system) are permitted
                           on site.
              b.   Within 20 business days of the commencement of trading of the
                   restaurant/café use, Council must be provided with a Noise Management
                   Plan which is specific to the use and prepared on the basis of physical and
                   technical assessment of noise from the restaurant/café use, including both
                   internal and external use areas. The noise management plan must suitably
                   detail physical and management noise control measures.
              c.   The applicant must advise prospective purchasers that a Noise
                   Management Plan has been prepared to manage noise emissions related
                   to the development.
              d.   The Noise Management Plan referred to in Condition 83(b) shall be
                   incorporated in perpetuity in the By-Laws of the Body Corp for the whole
                   development.
              e.   The Noise Management Plan shall include a process for dealing with
                   complaints and specify that the Restaurant/Café Management and Body
                   Corp Manager be responsible for dealing with any noise complaints.
   B.   Add additional Condition 98 to read as follows:
        98.   On completion of the works associated with enclosing the restaurant outdoor dining
              area certification from an appropriately qualified acoustic consultant must be
              provided. The certification must confirm that the as-constructed built form achieves
              the minimum 25 dB(A) noise reduction identified in the noise management plan
              (Report No: R21055/D3295/Rev.0/25.08.21 prepared by David Moore & Associates
              and dated 25 August 2021) and that all plant and equipment including the new air-
              conditioning plant achieves compliance with the development approval noise limits.
   C.   Add additional Advisory Note 12
        Additional ADVISORY NOTE – 21 October 2021
        12.   This Development Permit for a “Minor Change to an Existing Approval” reference
              132005.1133.15 will trigger an “Infrastructure Charge Notice” to be issued in
              accordance with Council’s “Charges Resolution” made pursuant to the Sustainable
              Planning Act 2009 and in conjunction with the State Planning Regulatory Provision
              (adopted charges).
              The infrastructure charge relates to the Minor Change to Stage CTS 400 (Resort
              Facilities) as follows:




                                                                                 Page 12 of 58

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                     15 NOVEMBER 2021


                                                                                                Approved
           Stage No.     Use                                        Existing Quantity
                                                                                                Quantity
                         Commercial Business – Type 1 – Office      103 m2                      103 m2
                         Entertainment & Dining Business – Type 1
                                                                    289 m2                      312 m2
           Stage         – Food & Beverage
           CTS 400                                                                              246 m2
                         Entertainment & Dinning Business – Type
           (Resort                                                  246 m2                      (Non-court area = 38
                         2
                                                                    (Non-court area = 38 m2     m2
           Facilities)    – Recreation, amusement and fitness
                                                                    & Court area = 208m2)       & Court area =
                         (Resort facility)
                                                                                                208m2)

                         Retail Business – Type 2 – Shop            21 m2                       16 m2

   D.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


   REPORT
   A report on this application was considered by the Planning and Environment Committee
   Meeting on 9 November 2021 and was subsequently referred to the General Committee
   Meeting on 15 November 2021 with a further report requested to address condition 99 and the
   applicant’s comments received around this recommended condition.
   99.   The ‘Cooking Classes’ room must not be used as part of the approved Entertainment
         and Dining Business use.
   During the assessment of the current application, it was noted that the proposed ‘Cooking
   Classes’ area was replacing an area previously identified on the plans as a shared multi use
   space. To protect the shared space, the condition was included in the report to the Planning
   and Environment Committee on 9 November 2021.
   At the time the development was originally approved in 2007 several associated facilities were
   also approved providing shared common facilities for occupiers of the development. A
   condition of the approval required the facilities building to be provided prior to the
   commencement of use of the 64th dwelling unit. In essence, the approval sought to ensure the
   delivery of these shared facilities for the future occupiers of the development.
   Overtime, through numerous change applications, the internal layout of the building has
   changed however shared common facilities were always provided.
   The applicant has subsequently advised Council officers that whilst it was not articulated in the
   application material it is intended the ‘Cooking Classes’ area be used in conjunction with the
   restaurant. The cooking class area is to be utilised by the restaurant’s signature chef who will
   provide a cooking class experience for a small number of guests.
   The acoustic report submitted with the application addresses the potential impacts of the
   cooking classes on surrounding residents and identifies that no adverse impacts will result.
   Furthermore, no additional car parking is required associated with the cooking class use.
   On this basis and given the approval still provides the option for this space to be used as a
   shared space in the future, it is no longer necessary to include condition 99 and the
   recommendation has been revised accordingly.
   Consultation
   External Consultation - Community & Stakeholder
   Not applicable
   Internal Consultation
   Coordinator Development Engineering


                                                                                              Page 13 of 58

Section 14

GENERAL COMMITTEE MEETING AGENDA                                             15 NOVEMBER 2021


   Departments/Sections Consulted:

       Chief Executive Officer       Community Services                        Corporate Services
       Executive Officer             Director                                  Director
       Executive Support             Community Development                     Financial Services
                                     Community Facilities                      ICT
                                     Libraries & Galleries                     Procurement & Fleet
                                     Local Laws                                Property
                                     Waste & Environmental Health              Revenue Services

       Executive Services        x   Environment & Sustainable Development     Infrastructure Services
       Director                      Director                                  Director
       Community Engagement          Building & Plumbing Services              Asset Management
       Customer Service              Development Assessment                    Buildings and Facilities
       Governance                    Economic Development                      Civil Operations
       People and Culture            Environmental Services                    Disaster Management
                                     Strategic Land Use Planning               Infrastructure Planning,
                                                                               Design and Delivery




                                                                                  Page 14 of 58

Section 15

GENERAL COMMITTEE MEETING AGENDA                                           15 NOVEMBER 2021


   5    FURTHER REPORT - TOURISM FUNDING AGREEMENT REVIEW PROCESS

   Author           Acting Chief Executive Officer, Larry Sengstock
                    CEO’s Office

   Index            ECM/ Subject/ 71.01/ Tourism Noosa

   Attachments      Nil

   EXECUTIVE SUMMARY
   Further to the report provided to Council as part of the agenda for the Services and
   Organisation Committee Meeting dated 9 November 2021, this report provides Council with
   additional information as requested at the meeting.
   The existing report tabled on 9 November outlined the position of Council to extend the current
   funding agreement by 12 months to allow for a number of changes that are in progress with
   both Council and Tourism Noosa.
   The additional information requested relates to the Destination Management project that
   Council is about to undertake which will provide the direction and support for the Tourism
   Noosa marketing and attraction strategy and implementation.

   RECOMMENDATION
   That Council note the report by the Chief Executive Officer to the Services and Organisation
   Committee Meeting dated 9 November 2021 and the Further Report by the Acting Chief
   Executive Officer to the General Committee dated 15 November 2021 regarding the Tourism
   Noosa Funding Agreement Review Process and
   A.   Agree to extend the existing funding agreement between Council and Tourism Noosa for
        a further term of 12 months on and from 1 July 2022 on the same terms and conditions
        as contained in the existing funding agreement;
   B.   Request the Chief Executive Officer to undertake negotiations for a new funding
        agreement with Tourism Noosa in the second half of 2022; and
   C.   Note that any new long term funding agreement will not commence until 1 July 2023.


   REPORT
   Further to the report provided to Council as part of the agenda for the Services and
   Organisation Committee Meeting dated 9 November 2021, this report provides Council with
   additional information as requested at the meeting.
   The November 9 report refers to – “Council commencing a Destination Management project
   looking at its role as the Destination Management agency and how it can better define its
   expectations in terms of destination management from a resident/visitor perspective”.
   By way of providing additional clarification of this statement the following information is
   provided.
   The Economic Development group within Council is currently seeking to engage a resource to
   begin developing the Destination Management project and is expected to be in place in
   January 2022.
   The overall objective of the destination management plan is to create a strategic framework
   that includes the activities of Tourism Noosa as one of its key stakeholders and delivery
   mechanisms.


                                                                                 Page 15 of 58

Section 16

GENERAL COMMITTEE MEETING AGENDA                                              15 NOVEMBER 2021


   The destination management plan will be “owned” by Council and be responsible for a broader
   vision rather than just attraction and marketing by defining the role of other service providers
   such as transport options, traffic management, customer experience, optimum visitor numbers
   and other service levels that enhance the overall experience of Noosa as a destination.
   The term “agency” is yet to be defined and will be part of the overall strategy development that
   provides options for the level of management that may be required going forward and the
   appetite of Council to control the outcomes.

   Previous Council Consideration
   Refer to original report.

   Finance
   Refer to original report.

   Risks & Opportunities
   Refer to original report.

   Consultation
   External Consultation - Community & Stakeholder
   Refer to original report.
   Internal Consultation
   Departments/Sections Consulted:

    x   Chief Executive Officer       Community Services                          Corporate Services
        Executive Support             Director                                    Director
                                      Community Development                       Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

        Executive Services        x   Environment & Sustainable Development   x   Infrastructure Services
        Director                      Director                                    Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                     Page 16 of 58

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                 15 NOVEMBER 2021


   6     RAL20/0019 – PLANNING & ENVIRONMENT COURT APPEAL NO. D116 OF 2021 –
         REFUSAL OF AN APPLICATION FOR RECONFIGURING A LOT – 1 LOT INTO 2
         LOTS AT 23 JIRRIMA CRESCENT, COOROIBAH

   Author              Manager Development Assessment, Kerri Coyle
                       Environment & Sustainable Development Department

   Index               ECM/ Application/ RAL20/0019/ Case/ Carlyle

   Attachments         1.      Amended Proposal Plans


   EXECUTIVE SUMMARY
   This report reviews and recommends settlement of an appeal against Council’s decision to
   refuse an application to subdivide 23 Jirrima Crescent, Cooroibah from 1 lot into 2 rural
   residential lots. The application was refused by Council primarily due to the proposed lot
   boundary traversing an identified riparian buffer.
   During the course of the appeal advice was sought from an aquatic ecological consultant who
   considered that the Noosa Plan 2020 riparian buffer width was not reflective of the area’s
   environmental values, also as the lot boundary followed an existing cleared pathway, the
   proposed subdivision could facilitate overall an improvement to the riparian buffer. Accordingly,
   following mediation, the applicant prepared a revegetation concept plan for the site, including
   weed removal and rehabilitation. A revised plan of subdivision was also provided identifying a
   proposed building envelope clear of the riparian buffer area.
   The proposed revegetation concept plan and revised plan of subdivision is acceptable and
   accordingly it is recommended that the appeal be settled.

   RECOMMENDATION
   That Council note the report by the Manager Development Assessment to the General
   Committee Meeting dated 15 November 2021 regarding Planning & Environment Court Appeal
   No. D116 of 2021 and agree to settle the appeal generally in accordance with the following
   conditions:
   PLANNING
         When Conditions Must Be Complied With
   1.    Unless otherwise stated, all works required by the conditions of this Decision must be
         completed prior to submission of the subdivision plan to Council.
         Approved Plans
   2.    Development undertaken in accordance with this approval must generally comply with
         the approved plans of development, with each lot to maintain a minimum area of 1.5ha.
         The approved plans are listed in the following table unless otherwise amended by these
         conditions.
           Plan No.         Rev.   Plan/Document Name                                        Date
           20-5200AE        -      Plan of proposed reconfiguration of Lot 47 on RP136461,   29-10-2021
                                   prepared by Max Waterson and Associates
   3.    All lot numbering on the subdivision plan to be submitted to Council for compliance
         assessment must remain as shown on the Approved Plans.
         Currency Period
   4.    This development approval lapses if the requirements of the conditions have not been

                                                                                       Page 17 of 58

Section 18

GENERAL COMMITTEE MEETING AGENDA                                            15 NOVEMBER 2021


         completed and an application for plan seal is not lodged with Council by 18 November
         2025 unless an application to extend the currency period is approved by Council.
         Plan of Development
   5.    Any future dwelling, associated buildings and effluent disposal area on Lot 11 must be
         contained wholly within the approved building envelope shown on the approved Plans of
         Development. A copy of the approved Plan of Development and Revegetation Concept
         Plan must be included in the contract of sale for either lot, together with clauses which
         a)    requires any future dwelling, associated buildings and effluent disposal area on Lot
               11 must be constructed within the building envelope.
         b)    Access permission to the proposed covenant area for the purposes of fulfilling the
               requirements of the Revegetation Concept Plan and development approval
               conditions.
         Effluent Disposal
   6.    Lot 11 must be provided with an on-site waste water treatment and effluent disposal
         system having a capacity sufficient for the use and contained within the building
         envelope.
   7.    All effluent disposal areas in Lots 10 and 11 are to be wholly located within the lot in
         which they serve and comply with the boundary setback requirements of the Plumbing
         and Drainage Act 2002 and associated codes and requirements.
   ENGINEERING
         Property Access and Driveways
   8.    A residential driveway must be constructed to proposed Lot 11. The works must be
         undertaken as part of any subsequent building approval on the Lot and be generally in
         accordance with Council’s standard drawings at the time of construction.
         To advise prospective purchasers and private certifiers the following property notation or
         similar will be added to Council’s rates records for proposed Lot 11:
         Private Certifiers, owners and prospective purchasers are notified that special access
         requirements apply to this parcel of land. Contact Council's Planning Department for
         Details.
         Internal Fencing
   9.    The boundary between lots 10 & 11 must be located clear of the existing driveway and
         the fencing relocated where appropriate.
   10.   No fencing is to be constructed in the covenant area, including on the boundary.
         Stormwater Drainage
   11.   Stormwater runoff from the development must be disposed of on-site within the relevant
         lot without causing scour or damage to the subject site or any adjoining property.
         Services
   12.   Reticulated electricity and telecommunication services must be provided to each lot in
         accordance with the standards and requirements of the relevant service provider.
   13.   Unless otherwise stipulated by telecommunications legislation at the time of
         construction, the development must be provided with all necessary conduits, pits and
         pipes to accommodate the future connection of optic fibre technology
         telecommunications.


                                                                                  Page 18 of 58

Section 19

GENERAL COMMITTEE MEETING AGENDA                                           15 NOVEMBER 2021


   14.   Certification must be submitted to Council from all relevant service providers (Energex
         and NBN) which certifies that the development has met the requirements of this Decision
         Notice and all applicable legislation at the time of construction.
         Easements
   15.   An easement for access purposes must be registered against the title of proposed Lot
         11 in favour of proposed Lot 10. The easement must be:
         a.   located generally in accordance with the approved plan
         b.   a minimum width of 4.5m and/or of sufficient width to fully encompass the path of
              a maintenance vehicle across the existing culvert and including the approaches on
              either side of the culvert.
         The terms of the easement must ensure that suitable access for proposed Lot 10 is
         provided in the long term and place all maintenance responsibilities of the culvert
         crossing, vehicle approaches and dam wall on the owner of Lot 11
   16.   Unless otherwise agreed in writing by the relevant service provider, any public or third
         party infrastructure located on the subject site must be placed within an easement
         registered against the title of the property.
   17.   All easements must be designed in accordance with the planning scheme and granted
         at no cost to the Grantee. Where the Grantee is Council or a service authority, the
         easement documentation must be in accordance with the Grantee’s standard easement
         terms. Draft easement documentation must be submitted to Council for endorsement.
   18.   All works must be kept clear of any existing or proposed easements on the subject land,
         unless agreed otherwise in writing by the Grantee.
         Damage to Services and Assets
   19.   Any damage caused to existing services and assets as a result of the development works
         must be repaired at no cost to the asset owner at the following times:
              where the damage would cause a hazard to pedestrian or vehicle safety,
              immediately; or
              where otherwise, upon completion of the works associated with the development.
         Any repair work which proposes to alter the alignment or level of existing services and
         assets must first be referred to the relevant service authority for approval.
     ENVIRONMENTAL MANAGEMENT
         Land Rehabilitation
   20.   A vegetation protection covenant must be registered against the titles of both properties
         over the proposed covenant area identified on the approved plans of development
         pursuant to Section 97A of the Land Title Act 1994. The covenant document and a
         survey plan must be submitted to Council for endorsement prior to lodgement with the
         relevant titles authority for registration of title. The covenant document must:
         a.   Incorporate the requirements of this Decision Notice;
         b.   Include Noosa Council as Covenantee; and
         c.   Reference Queensland Land Title Registry Standard Terms Document No.
              715597513.
         Works within Protected Land
   21.   The following works must be undertaken within the covenant area in accordance with

                                                                                 Page 19 of 58

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                  15 NOVEMBER 2021


         the Revegetation Concept Plan, prepared by 28 South Environment and dated 2
         November 2021 prior to the submission of the sealing of the survey plan:
         a.    Control of pest plants as listed in Planning Scheme Policy 2 Landscaping and
               Council’s Biosecurity Plan 2020 pest plants listed in Schedule 1 part 3, Schedule
               2 and Non-scheduled invasive species; and
         b.    Removal of any structures, debris or materials foreign to a natural environment.
               Rehabilitation and restoration, to achieve the equivalent floristic composition of a
               similar undisturbed regional ecosystem.
               The planting of canopy species with local provenance in Regional Ecosystem
               12.3.14a, including threatened Eucalyptus conglomerate. The trees must be
               planted at a ratio of 1 tree per every 10m2.
         Fencing to Protected Land
   22.   A permanent fence must be constructed along the entire length of the eastern alignment
         of the covenant area to restrict access by stock in to the covenant area.
   23.   The fence must include A5 sized signage with the wording “Vegetation Protection Area
         – No domestic animals” every 15m, durable, weather resistant and be visually
         complementary to the natural environment.


   REPORT
   On 17 June 2021, an application to subdivide 1 lot into 2 lots at 23 Jirrima Crescent, Cooroibah
   was refused by Council for the following reasons:
   1.    The proposal is not consistent with the 8.2.2.2 (1), (2)(a), (b), (c), (d), (e), (f), (g) and (i),
         Acceptable Outcomes AO6.1, AO6.2 and PO6 of the Biodiversity, Waterways and
         Wetlands Overlay as:
         a.    The proposal results in development within the Riparian Buffer Area, with the
               proposed lot boundaries traversing the buffer area.
         b.    The proposal seeks to enhance, rehabilitate and protect only part of the identified
               Riparian Buffer Area.
         c.    The proposed development increases the scale and intensity of development
               within and adjacent to an ecologically important area which has the potential to
               adversely impact on the site’s ecological values.
         d.    The proposal has the potential to result in additional clearing of vegetation in the
               Riparian Buffer Area due to the vegetation clearing exemptions permitted by the
               Planning Regulation 2017 and the planning scheme for lot boundaries and fencing.
   2.    The proposal is not consistent with 9.5.1.2 (1) (d) and (e) and Overall Outcomes 2(b),(c),
         Acceptable Outcome AO7.5, AO7.7 and AO7.9 and Performance Outcome PO7 of the
         Reconfiguring a Lot Code as:
         a.    The development does not provide for a lot layout that is responsive to the natural
               environmental values present on the site.
         b.    The proposed lot boundaries traverse ecologically important areas and ecological
               linkages.
         c.    The proposed environmental covenant area is only proposed over part of the
               Riparian Buffer area and will not provide suitable protection to this ecologically
               important area.


                                                                                        Page 20 of 58

Section 21

GENERAL COMMITTEE MEETING AGENDA                                          15 NOVEMBER 2021




   Figure 1 – Locality Plan

   The application was refused primarily due to the proposed lot boundary traversing through an
   area identified as riparian buffer by the Noosa Plan 2020.
   As a result of Council’s decision to refuse the application, the applicant lodged an appeal to
   the Planning & Environment Court seeking that the application be approved subject to
   reasonable and relevant conditions.
   During the course of the appeal, an aquatic ecological consultant was engaged by Council to
   provide specialist technical input into the proposed development and mediation was attended
   with the Court registrar. Prior to mediation Council’s consultant advised that this is a minor
   waterway that would have ordinarily been subject to a 10m wide buffer being a stream order 1

                                                                                Page 21 of 58

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                15 NOVEMBER 2021


   waterway, but noted that a wider buffer was applied to the stream due to the connectivity
   function/opportunity with the adjoining reserve to the west. It was also noted that the proposed
   lot boundary followed an existing cleared pathway and the proposed subdivision could retain
   existing vegetation, facilitate improvements to the riparian buffer and establish a building
   envelope to ensure no new works or structures were constructed in the riparian buffer.
   Accordingly, at mediation it was agreed the applicant would:
       prepare a revegetation concept plan for the site focusing on weed removal and
        rehabilitation around the waterway but also undertake plantings to improve the
        connectivity function along this waterway focusing on the western side of the waterway
        where it links with the adjacent reserve.
       be agreeable to a covenant area over the most significant areas of the riparian buffer,
        including a requirement that no fencing would be constructed in the covenant area.
   Following mediation the applicant provided the revegetation concept plan and a revised survey
   plan detailing the proposed covenant area and identifying a building envelope, which is
   included as Attachment 1. These have been reviewed by Council’s consultant who advises the
   plan reflects the on-ground conditions with the proposed species mix appropriately matching
   the adjoining remnant regional ecosystem.
   Based on this further specialist environmental advice it is recommended that the appeal be
   settled with reasonable and relevant conditions.
   Previous Council Consideration
   Ordinary Meeting Minutes, 17 June 2021, Item 1, Page 20
   That Council note the report by the Coordinator Planning to the Planning & Environment
   Committee Meeting dated 8 June 2021 regarding Application No. RAL20/0019 for a
   Development Permit for Reconfiguring a Lot (1 into 2 lots), situated at 23 Jirrima Crescent,
   Cooroibah and:
   A.   Refuse the application for the following reasons:
        1.     The proposal is not consistent with the 8.2.2.2 (1), (2)(a), (b), (c), (d), (e), (f), (g)
               and (i), Acceptable Outcomes AO6.1, AO6.2 and PO6 of the Biodiversity,
               Waterways and Wetlands Overlay as:
               a.    The proposal results in development within the Riparian Buffer Area, with the
                     proposed lot boundaries traversing the buffer area.
               b.    The proposal seeks to enhance, rehabilitate and protect only part of the
                     identified Riparian Buffer Area.
               c.    The proposed development increases the scale and intensity of development
                     within and adjacent to an ecologically important area which has the potential
                     to adversely impact on the site’s ecological values.
               d.    The proposal has the potential to result in additional clearing of vegetation in
                     the Riparian Buffer Area due to the vegetation clearing exemptions permitted
                     by the Planning Regulation 2017 and the planning scheme for lot boundaries
                     and fencing.
        2.     The proposal is not consistent with 9.5.1.2 (1) (d) and (e) and Overall Outcomes
               2(b),(c), Acceptable Outcome AO7.5, AO7.7 and AO7.9 and Performance
               Outcome PO7 of the Reconfiguring a Lot Code as:
               a.    The development does not provide for a lot layout that is responsive to the
                     natural environmental values present on the site.
               b.    The proposed lot boundaries traverse ecologically important areas and
                     ecological linkages.

                                                                                      Page 22 of 58

Section 23

GENERAL COMMITTEE MEETING AGENDA                                               15 NOVEMBER 2021


                 c.     The proposed environmental covenant area is only proposed over part of the
                        Riparian Buffer area and will not provide suitable protection to this
                        ecologically important area.
   B.         Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

   Finance & Risk
   Should Council not wish to settle the appeal, there will be further costs in defending the appeal
   and while advice on prospects has not been received from Council’s barrister, based on
   Council’s aquatic ecological consultant’s advice, a favourable outcome by trial may be unlikely.
   Consultation
   External Consultation - Community & Stakeholder
   Thynne Macartney – Tim Quirk
   Internal Consultation
   Nil
   Departments/Sections Consulted:
         Chief Executive Officer       Community Services                        Corporate Services
         Executive Support             Director                                  Director
                                       Community Development                     Financial Services
                                       Community Facilities                      Fleet
                                       Libraries & Galleries                     ICT
                                       Local Laws                                Procurement
                                       Waste & Environmental Health              Property
                                                                                 Revenue Services

         Executive Services        x   Environment & Sustainable Development     Infrastructure Services
         Director                      Director                                  Director
         Community Engagement          Building & Plumbing Services              Asset Management
         Customer Service          x   Development Assessment                    Buildings and Facilities
         Governance                    Economic Development                      Civil Operations
         People and Culture            Environmental Services                    Disaster Management
                                       Strategic Land Use Planning               Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                    Page 23 of 58

Section 24

GENERAL COMMITTEE MEETING AGENDA   15 NOVEMBER 2021


 Attachment 1




                                       Page 24 of 58

GENERAL COMMITTEE MEETING AGENDA                                                                                15 NOVEMBER 2021

   Attachment 1

                                                            r |                              oo                                                   F751 cenores ruramian
                    |                                          /                                                   |                                 ane                       MAX WATTERSON
                                                )                                                                                      —          LoL AReawerian rT
                                                                 |                                                  |        —_                   [TT OeNoTes REHABILITATION
                                                             }                                                                                        DENOTES BUILDING
                    N                                          |                                                                                       ee                         +ASSOCIATES
                                                                                                                                           1      -o~ use               @
                                                            |  |                                                  |                   RP212300                          |        CONSULTING SURVEYORS
                                                            |                                                     }                                                   |               & PLANNERS
                                                            !                                                                                                         |         12 Maple Steet
                                                                                                                                                                                PO Box 639
                                                           |   N\A                        2                                                                       —     |  | ress
                                                                                                                        7a                  :                                   Cooroy Gid 4563
                                                           |                         RP212300                                                                           |      Email. ofce@mvamurveyscomou
                                                                                                                                                                               cmt N & J CARLYLE

                            ie,                     Peres NEA eCN                                                                                                        G     [rae
                            Reserve              EEE Biss honab is ‘I                                         1 0                                                       8 | PLAN OF PROPOSED
                                                QF Rn 7 Rane             eaten, 2)                                             ie                                 3         |  RECONFIGURATION
                                             EO IE EE RN                         ON    eM                   2.57 tha                                              3 = G | OFLOT470N
                                          OE eee oar CAN ON ee                                                                ans                .                             RP136461.
                                        LO aN Bg                               yg De                       136.1                      [Loony
                                       Peri Uae Raf          [AOE          a   Le eee oe                                                     a              :     '
                                   js Rha                   SNe ee                                              11            angers               TR
                            LEO      i802                     ee                                               rohax             ey
                                      woe Dee                   Sion Ns klar pe Gana en a                            ‘                                        {
                                  e  fo           es :           yo: Pe@posed Covenant’ NL                           \                                        |x        ;
                   .   7                                          Ss ~ =   ~—— = a                   -                   310.94 CR FH                                  zt     LOCAL GOVT: NOOSA S.C.
                      .                                                                               Proposed Emit fo ‘Access (Emt A on DP315440) {-~~-     —       =        LOCALITY: COOROIBAH
                                                                                                                                                                     £         Seae: 1:15008(A3) Pian 1of1
                                                                                                                                                                              Datum: AHD     Date: 23-10-21
                                                                                                                  46                                                                      |    Ref
                                                                                                              RP136461                                         |                     .      20-5200AE
                                                                                                                                                               I              NOTE:
                          —__              co                                                                                                                                  ‘This plan has been prepared for agplication
                                                            ———              _                                                                                                PURPOSES only and may be subject t change.
                                                  2                                                                                              oo          +| j
                                                                                 -              ro |                                                                          Dimensions and areas shown nereon are
                                                                                                                   >            a                             | >              ‘approximate only and subject to tral survey.
                                                                                              9                               |
                                                                                                                              o
                                            Seale 1:1500 - Lengths are in Metres                                                                    oe
                         luutuul   [| |     [|  |     [| | | | | | 4
                         5    0    1s  wx   a    60  7s   9   105  120  135 190  165                                                                        }

                                                                                                                        Page 24 of 58

Section 25

GENERAL COMMITTEE MEETING AGENDA                                             15 NOVEMBER 2021


   7     COASTAL HAZARDS ADAPTATION PLAN & SECOND ROUND COMMUNITY
         CONSULTATION SUBMISSIONS

   Author            Principal Strategic Planner, Rebecca Britton
                     Environment and Sustainable Development Department

   Index             ECM/Subject/Climate Change 41.23

   Attachments       1.    Coastal Hazards Adaptation Plan (116 page attachment provided
                           separately to this agenda)
                     2.    Coastal Hazards Adaptation Plan – with tracked changes (122
                           page attachment provided separately to this agenda)


   EXECUTIVE SUMMARY
   A further round of community consultation on the Coastal Hazards Adaptation Plan (CHAP)
   was held for 3 weeks until 1 November 2021 seeking feedback on a second version of the
   CHAP. This followed earlier community consultation in January this year for 6 weeks and the
   establishment of a Community Roundtable process to explore and discuss issues raised by
   community groups in more detail.
   This report provides a summary of submissions received during the second round of
   consultation; proposed responses to issues raised; an updated CHAP identifying changes
   made as a result of the consultation, and a revised CHAP proposed for Council approval and
   submission to Queensland State Government. The report also includes a summary of the key
   outcomes from the first round of consultation that was previously reported to Council in
   October.

   RECOMMENDATION
   That Council note the report by the Principal Strategic Planner to the General Committee
   Meeting dated 15 November 2021 and
   A.    Note the submissions received during the second round of community consultation on
         the draft Coastal Hazards Adaptation Plan; and
   B.    Approve the revised Coastal Hazards Adaptation Plan and forward to the State
         Government for final endorsement.


   REPORT
   First round of community consultation
   During the first consultation period early this year, Council received a total of 233 submissions.
   Six meetings of the CHAP Committee Roundtable were then held from July to September
   2021. This consultative process helped with discussing concerns, sharing information and
   clarifying details set out in the CHAP. Guest speakers also attended the roundtable to present
   on technical and coastal related matters.
   The process highlighted areas for improvement for the CHAP relating to:
        mapping and modelling
        monitoring of coastal hazards
        best practice approaches for managing coastal hazard risk
        establishing a clearer ‘pathway’ approach to future changes in coastal hazard risk
        protection and management of public foreshore land
        policy linkages to future amendments to the planning scheme.

                                                                                   Page 25 of 58

Section 26

GENERAL COMMITTEE MEETING AGENDA                                            15 NOVEMBER 2021


   This process resulted in improvements to the CHAP as follows:
       Pathway approach – more emphasis has been placed on showing how the adaptation
        response may be staged over time as risk profiles change or as more information is
        made available. Pathway diagrams and descriptions were added to the CHAP,
        consistent with other Councils’ approaches.
       Protecting Council assets – more emphasis has been placed on outlining what action
        the Council will take in relation to dune management and revegetation in high-risk areas.
        This has been identified as a critical priority for Council and the community in helping to
        build coastal resilience and manage erosion risks.
       More monitoring – more emphasis has been added in relation to the need to monitor
        changes over time. This includes enhancing our program of monitoring and data
        collection to inform future adaptation responses in partnership with the State
        Government, research agencies, CSIRO, Universities, and the Bureau of Meteorology
        (BOM) where possible.
       Clarity on Planning Scheme – One of the concerns raised with the draft CHAP, is that
        it impacts on private property rights and use rights. The CHAP is not a statutory planning
        document itself and therefore does not do this. It is the planning scheme (Noosa Plan
        2020) that sets the development requirements and land use outcomes. The CHAP will
        inform land use planning requirements and the revisions make clearer that the Council
        will take a ‘stepped’ monitor-manage-review approach to help inform appropriate land
        use planning responses. It recognises that the Council will need to amend the Noosa
        Plan 2020 to ensure it aligns with State Planning Policy requirements to address local
        coastal erosion risks, and that Council will also continue to actively monitor local erosion
        trends to inform management approaches. As part of the Ministerial Conditions imposed
        at the time of approving the Noosa Plan 2020, the State Government mandated a
        requirement for Council to finalise the CHAP and undertake any necessary planning
        scheme amendments to integrate the State Planning Policy.
   Second round consultation and proposed responses
   The second round of community consultation for the revised CHAP ran for a period of 3 weeks
   from 8 October to 1 November 2021 with a total of 53 submissions received. The following
   consultation activities were completed:
       Media statements from Council
       Information available through Your Say Noosa
       Email to community groups, business associations, utility providers and previous
        submitters inviting them to view the revised CHAP
       Social media posts
       Face to face and telephone discussions and email enquiries with the community relating
        to the CHAP.
   The submission comments were overwhelmingly focused on the Eastern Beaches erosion
   issues and ongoing concerns relating to the modelling and mapping, and in particular future
   land use policy changes that this may bring about through amendments to the planning
   scheme. There was also a number of comments relating to other localities including for Noosa
   North Shore.
   This has resulted in the follow key improvements:
       More mapping for other potential future erosion scenarios – Council will continue to
        investigate and undertake further work to determine best modelling approaches to
        provide a clear picture of the range of low to medium (best to worst case) scenarios for
        coastal erosion hazard along the open coast beaches.



                                                                                  Page 26 of 58

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                          15 NOVEMBER 2021


           Clearer map disclaimers – More detailed information will be added to mapping to
            describe the maps and its various data inputs. This will be included on the interactive
            mapping system as clear and informative ‘pop up’ notices for readers.
           Ongoing community involvement - Noosa Council is committed to working with
            interested community groups to manage the potential coastal hazard risks faced by
            existing coastal communities. This includes regular consultation and updates with local
            property owners and foreshore reserve neighbours to help input into beach management
            and monitoring.
   Summary of issues raised in Submissions and proposed responses:

       Community comments                                     Proposed response

       General

       Changes in terminology in the CHAP provide for         The revised CHAP has improved terminology
       increased accuracy and clarity such as ‘already’,      when describing coastal erosion risks, in response
       ‘likely’ and ‘will’, now changed to ‘potential’,       to community concerns raised. It is important that
       ‘projected’ and ‘possible’ in reference to risk and    the CHAP clearly describes potential risks in a
       impacts.                                               way that is understandable and useful for decision
       ____                                                   makers and the broader community, and does not
                                                              create unnecessary concern or misunderstanding
       There is no reason to change the wording
                                                              for property owners.
       throughout the CHAP in order to tone it down or
       undermine the utilized models. Wording is              The CHAP has an important role in identifying
       important and should be based on evidence and          areas that need further action or investigation to
       not ideological or political agendas. The likely       help prioritise resources and effort. The risk
       impacts of coastal hazards, including erosion          assessment process that the CHAP is built upon
       and tidal inundation, are not a question of “if” but   provides for this prioritisation and will continue to
       “when”. The CHAP should reflect this and               be reviewed over time.
       explicitly embrace the precautionary principle.
                                                              The CHAP seeks to be proactive in commencing
       Stakes are very high for all the Noosa
                                                              early planning for coastal hazard risks including
       community.
                                                              further investigations, monitoring of dune and
       ____
                                                              foreshore changes, and on-ground dune
       The CHAP should not take a precautionary               management and rehabilitation. At the same time,
       approach but should apply an adaptive                  the process is adaptive through regular reviews,
       management process that responds to localised          data collection, and model and mapping updates.
       modelling, data and new information.

       Implementation, monitoring and review – amend          Reviewed and changes made to reflect suggested
       wording to say “…Council, and other key                wording to “potentially”.
       agencies to work together to respond and
       overcome the challenges we’re likely to face in
       the future as a result of rising sea levels”.
       Suggest change to potentially face.

       Mapping, modelling, local monitoring – for coastal erosion

       Ongoing concern over the modelled erosion              Council acknowledges concerns that the
       mapping, the assumptions for which are based           modelling inputs are uncertain and present only
       on the theoretical accumulation of several worst-      one possible future scenario, as outlined by State
       case risks occurring in 50 to 80 years-time. The       Government requirements. Council will continue
       potential erosion areas along the Eastern              to work with the State Government and other
       Beaches are overstated.                                coastal experts to determine modelling
                                                              approaches that provide for a clear picture of the
       The application of the ‘long-term rate of erosion
                                                              range of low to medium (best to worst case)
       variable’ is excessively conservative and
                                                              scenarios. This will be supported by ongoing
       conflicts with the recommended approach in the
                                                              localised monitoring and assessment of foreshore
       State’s Technical Guide. Given that the beaches
       are accreting, the appropriate allowance is in the

                                                                                                 Page 27 of 58

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                   15 NOVEMBER 2021



    Community comments                                  Proposed response
    range of 2.1 and 2.7, not the 10m that has been     changes, and further localised studies of sand
    applied to the modelling.                           dynamics and sand volumes.
    The short term erosion component is wrong,          The methodology for mapping the erosion prone
    using the 1 in 100-year estimates for both surge    area is set by the State Government and will still
    tide and wave height, despite the recognition       need to be adhered to in any updates to the State
    that the combination was "rare" - resulting in a    erosion prone area mapping.
    significant overstatement of the area actually at
                                                        The CHAP and the coastal hazard mapping will
    risk of erosion.
                                                        continue to be updated over time as new local
    Clear disclaimers needed for coastal hazard         information, technology and modelling methods
    mapping on Council’s interactive mapping            are made available. This includes the State’s
    system, noting the range of inputs and              erosion prone area mapping and the inundation
    uncertainty inherent in the modelling.              mapping layers.
    Given that enhancing dune vegetation is             Additional disclaimers were added to the CHAP
    accepted as the best option for managing            as a result of community feedback to clarify the
    erosion risk, the existence of significant          purpose of the maps. These disclaimers will be
    vegetation all along the Eastern Beaches should     expanded upon for the online mapping to more
    properly be taken into account when determining     clearly explain the various data inputs into the
    the area actually at risk.                          modelling. These disclaimers will be included on
                                                        the interactive mapping as clear ‘pop up’ notices
    Council has made no allowance for the sand
                                                        for readers.
    trapping role of the Sunshine Beach headland.
    Council should commit to further localised
    studies that accurately measure and monitor the
    nature and extent of erosion prone areas.
    Need further modelling to better understand the
    potential outcomes from best case to worst case
    scenarios (low, medium, high) so we can
    understand the risk envelope we are looking at
    for 2040, 2070 and 2100.
    Object to use of RCP8.5 global emissions
    scenario for climate change as it presents a
    ‘worse-case scenario’. Should use more
    updated IPCC or preferably CSIRO data and
    where possible Queensland data e.g.
    Mooloolaba, Noosa, Rosslyn Bay and Cape
    Ferguson. There is such a wide range of
    forecast sea level rises around the world that it
    almost becomes meaningless in some respects
    if we do not start using local data sets.
    Any attempt to derive justification for planning
    changes from erroneous modelling would be
    unreasonable, irrational and unwise.

    Support the enhanced emphasis in the revised        Agree that local monitoring is a critical adaptation
    CHAP on a flexible adaptation pathway               response to better understand localised changes
    approach that includes local monitoring of the      including sand transport processes, sand
    dunes and beaches and the gathering of factual,     volumes, beach profiles, vegetation changes and
    empirical data over time to inform future           tide levels. Local monitoring is a key priority for
    modelling and assessments and subsequent            the CHAP implementation.
    updating of the CHAP.
                                                        Council will work with Federal and State agencies,
    This modelling data also needs to be made           research institutions and other coastal experts to
    available to the community.                         ensure the data is publicly accessible where
                                                        possible so that the community can also make
                                                        use of the information if they wish.



                                                                                          Page 28 of 58

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                    15 NOVEMBER 2021



    Community comments                                   Proposed response

    Planning scheme linkages

    The removal of some of the references to future      Noosa Council is committed to working with
    planning scheme changes is seen as positive.         community groups and property owners to
    The revised CHAP now more clearly represents         manage potential coastal hazard risks faced by
    that Council’s preferred long term adaptation        our existing communities, This includes inputting
    pathway is to monitor potential risks in the urban   into the planning amendment process as a
    footprint areas. There are however ongoing           separate consultation process, following
    concerns over any future amendments to the           completion of the CHAP.
    Noosa Plan 2020 and what this will mean for
    private properties along the beaches.
    There is need for transparency around the
    details of any proposed planning change.

    Planning changes foreshadowed in the Phase 6         The Phase 6 options assessment identified
    Options Assessment report were elevated to           planning scheme changes as being a ‘go slow’
    priority actions in the Phase 7 cost benefit         option meaning ‘the option may be suitable
    analysis.                                            subject to further detailed assessment at specific
                                                         locations’. Hence the option was carried forward
    The cost benefit analysis is flawed and should
                                                         into the Phase 7 cost benefit analysis. The
    not be relied upon for the CHAP.
                                                         overriding driver of planning changes however is
                                                         the Ministerial Condition from the adoption of the
                                                         Noosa Plan 2020 which necessitates planning
                                                         scheme amendments to integrate the State
                                                         Planning Policy and address local coastal hazard
                                                         risks.
                                                         Changes to the planning scheme in relation to
                                                         coastal hazards have been in process since well
                                                         before the start of the CHAP being developed (i.e.
                                                         2016) because planning for coastal hazards is a
                                                         statutory requirement of the State Planning Policy.
                                                         The CHAP is not the primary driver for the
                                                         amendments, though it does provide important
                                                         supporting information to help identify appropriate
                                                         local land use planning and development
                                                         responses for coastal hazard risks for Noosa.

    Commend the Council for adding to the Guiding        The question of existing use rights and property
    Principles in CHAPv2 the requirement that            rights has been an ongoing concern for some
    adaptation must also consider the rights and         submitters.
    interests of individuals.
                                                         A property owner has the right to continue using
    Request that the revised plan be amended to          their property for a lawfully established use –
    expressly state that existing use rights will be     regardless of changes to planning schemes. A
    protected and that it will not:                      planning scheme cannot make an existing lawful
                                                         use unlawful (e.g. an existing house). This is set
       stop existing use rights from continuing,        out in the Planning Act 2016 (part 1).
       require existing uses to be changed,
       stop or further regulate a lawful approval.      Councils are obliged to properly consider coastal
                                                         hazards such as erosion, stormtide inundation
    Any imposition of ‘adverse’ planning changes         and flooding in their land use planning, and when
    imposed as a result of amendments to the             making management decisions. This includes
    Noosa Plan 2020 in response to the CHAP              when preparing planning schemes and assessing
    would not be found to be reasonable or               development applications.
    justifiable under the Human Rights Act,
    particularly in the absence of extended              The State Planning Policy makes it clear that
    monitoring and where there has been a reliance       planning and development outcomes must reflect
    by Council on flawed modelling.                      the State interest with respect to natural hazards,
                                                         including identifying the areas at risk and including

                                                                                          Page 29 of 58

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                   15 NOVEMBER 2021



    Community comments                                   Proposed response
    Council needs to formally withdraw its letter to     appropriate provisions so that the risks posed by
    the State that foreshadows adverse planning          the hazards are avoided or mitigated to protect
    changes, as it is clearly inconsistent with the      people and property.
    stated intent of Council not to negatively impact
                                                         Noosa Council therefore must meet the Minister’
    existing homes and property rights.
                                                         requirements that were set when the Noosa Plan
                                                         2020 was approved by the State Government to
                                                         appropriately integrate the State Planning Policy
                                                         into the Noosa Plan 2020. The letter notifying the
                                                         State that Council wishes to commence a process
                                                         of amending the planning scheme to meet these
                                                         requirements is a standard planning process. The
                                                         details of the amendment have not yet been
                                                         drafted in full and will be the subject of further
                                                         separate community consultation once they are
                                                         more progressed and once the CHAP is complete.

    Risk assessment

    Table 11 - Change in Teewah Beach and Noosa          Risk table has now been changed to show that
    North Shore asset erosion risk profiles - Asset      the business asset type is not applicable for
    Type ‘Business’ does not exist. Either remove        Teewah and Noosa North Shore beach. This is
    from table or change Risk to none. There are         because short term accommodation is captured
    different risk profiles between Residential and      under ‘Residential’ and the campground is
    Tourism. Tourism in Teewah is based upon             captured under ‘Tourism’.
    rental homes. The risk profile should be the
    same for both in the township.

    Inundation Risk to Noosa North Shore – amend         Reviewed and changes made to reflect suggested
    wording: 'This area is prone to flooding and         wording.
    inundation events today, and these hazards are
    projected to increase in severity and frequency
    over the life of this plan’. This statement is
    incorrect. Similar to sections of the foreshore of
    Noosaville as an example, at times of king tides
    or minor flooding, the lower reaches also have
    some minor known areas of which can become
    inundated. The area is not ‘prone’ today as
    suggested. The wording should be changed to –
    “some areas do experience inundation as a
    result of king tides and minor flooding, however
    most residences are not affected”.

    Management of public land

    Welcome Council’s approach to managing               The CHAP acknowledges the need for a pro-
    dunes and beaches and the critical role this         active approach to dune and beach management
    plays in help to provide protection against          that recognises the importance of managing
    coastal erosion.                                     erosion risk through on-ground management
                                                         action and systematic monitoring and data
                                                         gathering over time.

    Council must properly manage land adjacent to        Council is preparing a Coastal Foreshores
    the beach for which it is responsible.
                                                         Management Plan for Eastern Beaches with
    More detail about the investment and oversight
                                                         reference to the intent and required actions of the
    of dune, beach and waterway management
                                                         CHAP and the Bushland Reserve Strategic
    needs to be developed and published ahead of
    the other longer term pathway options.


                                                                                          Page 30 of 58

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                      15 NOVEMBER 2021



    Community comments                                      Proposed response
                                                            Management Plan. It aims to guide the
                                                            management of Council-managed foreshore land
                                                            on the Eastern Beaches with a clear and
                                                            consistent set of principles and management
                                                            actions. The plan will help contribute to the
                                                            rehabilitation of dune vegetation and help
                                                            increase community resilience to climate change.
                                                            The scope will include:
                                                             management of creeks and stormwater that
                                                               flow into the ocean
                                                             managing encroachments, accesses and
                                                               works in dunes on public land
                                                             guiding design and placement of public beach
                                                               access tracks, infrastructure and boardwalks
                                                             managing bushland for ecological integrity
                                                             and bushfire protection
                                                             dune management and vegetation
                                                               rehabilitation.
                                                            Development of this foreshore plan will include
                                                            regular consultation and updates with community
                                                            stakeholders, including foreshore reserve
                                                            neighbours and other local property owners, as
                                                            well as advertised consultation opportunities for
                                                            the broader community. Early consultation with
                                                            community groups has commenced.

    Beach nourishment, dune augmentation and                The wording in the latest version of the CHAP has
    management is also acknowledged in the CHAP             been changed to simply state:
    as being a feasible adaptation option which
                                                            “As part of the CHAP implementation, Council will
    requires more detailed planning by Council.
                                                            further investigate sand supply, costs and
    However, we strongly reject the
                                                            potential funding options.
    veracity of the following statement and its
    inherent assumptions:
    “In addition, the direct beneficiaries of this option
    comprise a relatively small number of private
    landholders (relative to the whole local
    government area). Therefore, as part of the
    CHAP implementation, Council will further
    investigate sand supply, costs and potential
    funding options including consideration of who
    should pay to ensure equitability for the Noosa
    community.”

    Council should establish a community steering           Council will continue to engage directly with the
    committee to provide feedback and oversight of          local community groups to assist with feedback
    the dune management and monitoring program,             and planning on dune and beach management
    so that affected communities are engaged and            and monitoring and to manage potential coastal
    have a role in the implementation.                      hazard risks faced by existing communities. This
                                                            will be completed as part of the Coastal
                                                            Foreshores Management Plan.

    The CHAP does not acknowledge and address               The CHAP looks specifically at existing built
    the coastal erosion hazards caused by the               stormwater infrastructure that are vulnerable to
                                                            coastal hazards of erosion, stormtide inundation
        collection, channelling and discharge of           and sea level rise.
         stormwater, from a wide catchment in and
         around the suburbs of the eastern

                                                                                            Page 31 of 58

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                15 NOVEMBER 2021



    Community comments                                Proposed response
         beaches, and into coastal dunes and          Stormwater management for coastal creeks and
         creeks that flow on to the beaches (eg       dunes will be addressed in Council’s Coastal
         carpark at Seaview and Burgess Creek).       Foreshores Management Plan, as noted above.
                                                      Council has already commenced work on
        collection and discharge of treated sewage   developing this plan.
         into Burgess Creek by UnityWater under
         arrangements with the Council.               Council staff have been working with Unitywater
                                                      for some time, as part of the development of a
    It is essential that the CHAP identifies          ‘Water Matters Plan’ by Unitywater. This has
    stormwater and sewage discharge onto the          included discussing long-term options for Burgess
    dunes and beaches as a relevant erosion           Creek. Whilst all discharge is within legal limits
    hazard and risk; and includes propose             (set under State government licencing), Council
    adaptation outcomes and associated actions to     would like to see long term improvement in
    address the risks.                                environmental indicators.
                                                      Council will continue to engage with Unity Water
                                                      to get the best outcomes for Burgess Creek and
                                                      the surrounding environment.

   Previous Council Consideration
   Special Meeting Minutes, 8 October 2021, Item 1, Page 4
   That Council note the report by the Principal Strategic Planner and Program Coordinator
   Climate Change Adaptation to the Special Meeting dated 8 October 2021 and
   A.   Note the report on submissions received during the community consultation on the draft
        Coastal Hazards Adaptation Plan;
   B.   Approve the draft Coastal Hazards Adaptation Plan for the purpose of undertaking further
        community consultation, as provided in Attachment 1;
   C.   Approve the Community Engagement and Communications Plan as the basis for
        undertaking further community consultation, as provided in Attachment 3.
   Ordinary Meeting Minutes, 19 August 2021, Item 11, Page 15
   That Council note the report by the Chief Executive Officer to the General Committee Meeting
   dated 16 August 2021 and note progress on the Coastal Hazards Adaptation Plan (CHAP)
   community engagement process.
   Ordinary Meeting Minutes, 21 January 2021, Item 3, Page 7
   That Council note the report by the Principal Strategic Planner and Program Coordinator
   Climate Change Adaptation to the General Committee Meeting dated 18 January 2021 and
   A.    Approve the draft Coastal Hazards Adaptation Plan and supporting information for the
         purpose of community consultation, as provided in Attachments 1 - 4;
   B.    Approve the Community Engagement and Communications Plan, as provided in
         Attachment 5; and
   C.    Note that updates have been made to the coastal hazard mapping of erosion for
         beachfront areas between Peregian Beach and Sunshine Beach and that this updated
         mapping has been made available to the public through Council’s online mapping via
         Council’s website.
   Ordinary Meeting Minutes, 18 July 2019, Item 2, Page 17
   That Council note the report by the Program Coordinator Climate Change Adaptation to the
   Planning & Environment Committee Meeting dated 9 July 2019 and:
   A.    Endorse the Coastal Hazards Mapping Refinement report provided in Attachment 1,
         including the methodologies contained therein, for the purposes of completing the
         coastal hazards adaptation plan, informing land use planning, and capital works

                                                                                      Page 32 of 58

Section 33

GENERAL COMMITTEE MEETING AGENDA                                              15 NOVEMBER 2021


         planning, design and delivery; and
   B.    Note that any associated mapping outputs developed using these methodologies will be
         reviewed and updated periodically as required in response to new relevant information,
         legislative requirements or climate change projections in accordance with Council’s
         Climate Change Response Policy 2017.
   Finance
   The CHAP project is funded by the State government and administered through the LGAQ,
   with all coastal councils working through a similar process. Under the funding agreement,
   Council has been given until 30 November 2021 to finalise the CHAP development. The project
   is currently on track to meet this timeframe. The next step in the process following Council
   approval of the final CHAP is to submit the CHAP and supporting documents to LGAQ and the
   State Government for endorsement.
   A more detailed implementation plan based on the preferred outcomes and actions in the
   CHAP will then be developed to identify priority steps and budget requirements for
   implementation.
   Risks & Opportunities
   The CHAP is an important risk management document helping inform Noosa Shire how to
   mitigate coastal hazard risk and prepare for potential impacts. The plan sets clear priorities
   and preferred outcomes for managing these risks across areas of infrastructure planning and
   delivery, land use planning, environmental management and emergency management. The
   plan provides an adaptive management approach that incorporates ongoing monitoring and
   review to ensure a ‘stepped’ approach to preparing for coastal hazard risks over time. This
   includes opportunities for local data gathering and implementing on-ground actions as a priority
   to manage the health and resilience of dunes and foreshores over the short to longer term.
   Consultation
   External Consultation - Community & Stakeholder
   There has been a high level of community interest in the CHAP process, and this has led to
   the extension of the community consultation early this year; the establishment of the
   Community Roundtable; and a second round of community consultation seeking feedback on
   proposed changes. This extra consultation has been beneficial in increasing Council’s
   understanding of community concerns and in helping to clarify the purpose, intent and
   preferred outcomes of the CHAP.
   Internal Consultation
   Departments/Sections Consulted:
    X   Chief Executive Officer       Community Services                          Corporate Services
        Executive Support             Director                                    Director
                                      Community Development                       Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

        Executive Services            Environment & Sustainable Development       Infrastructure Services
        Director                  X   Director                                x   Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                  X   Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                     Page 33 of 58

Section 34

GENERAL COMMITTEE MEETING AGENDA                                               15 NOVEMBER 2021


   8    CONTRACT NO T000048 TRAFFIC CONTROL SERVICES - TENDER AWARD

   Author             Acting Civil Operations Manager, Bryan O’Connor
                      Infrastructure Services Department

   Index              ECM / Subject / Contracting / Road Construction
                      ECM / Project & Contract / T000048 Traffic Control Services / Reports
                      to Council

   Attachments        1.    Evaluation Spreadsheet

   EXECUTIVE SUMMARY
       This report provides a tender evaluation summary and recommendation for the tender
        award for the external supply of traffic control services utilising a schedule of rates.
       The current contract for traffic control services is due to expire on 21 November 2021.
       In accordance with Council procurement policy and procedure, an Invitation to Tender
        (ITT) was initiated and attracted 11 responses with 10 considered compliant for further
        assessment.
       The tender evaluation panel completed the evaluation process and considered the
        tender submitted by Traffic Management People Pty Ltd ATF the Abrahamson Family
        Trust t/as Traffic Management People to be the most advantageous to Council.
       However, prior to consideration for award at Council’s Ordinary Meeting of 21 October
        2021, Traffic Management People Pty Ltd advised Council that it had sold its traffic
        management business to a new entity, Traffic Management People No.2 Pty Ltd, and
        that it had transferred all of its personnel, operations and offices to the new entity.
       As such, at Council’s Ordinary Meeting of 21 October 2021, Council resolved to defer
        the tender award to enable the CEO to provide advice at a future Council meeting
        regarding finalising this tender.
       Council’s Procurement Team reviewed the tender as a result of the circumstances above
        and subsequently formed the view that the tender from Traffic Management People Pty
        Ltd ATF the Abrahamson Family Trust t/as Traffic Management People could not be
        accepted (as that entity could no longer provide the services as tendered) and that the
        new entity Traffic Management People No.2 Pty Ltd could not be considered under this
        tender process as it had not submitted a tender.
       Subsequently the tender evaluation panel reconvened to consider its initial
        recommendation in light of the above, and as a result the panel concluded that, of the
        submitted tenders capable of acceptance, the tender from Verifact Traffic Pty Ltd was
        the most advantageous to Council, presenting the best value for money.

   RECOMMENDATION
   That Council note the report by the Acting Civil Operations Manager to the General Committee
   Meeting dated 15 November 2021, and
   A.       Award Contract No. T000048 for the provision of Traffic Control Services to Verifact
            Traffic Pty Ltd for a period of two (2) years commencing on 22 November 2021; and
   B.       Subject to satisfactory performance by Verifact Traffic Pty Ltd, authorise the CEO to
            approve the options to extend the contract at the expiry of the first two (2) year term for
            a further three (3) terms of up to 12 months each ending 21 November 2026.



                                                                                     Page 34 of 58

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                15 NOVEMBER 2021


   REPORT
   1.      Background
   Council’s annual expenditure for traffic control services in 2020 was $738,999, while in the six
   months to 30 June 2021 it was $402,666. The current contract for these services is scheduled
   to expire on 21 November 2021.
   In accordance with Part 3 of the Local Government Regulations and Council Procurement
   Policy, Council invited written tenders for the provision of traffic control services. The invitation
   to tender was issued as a schedule of rates contract for an initial contract term of two (2) years,
   plus three (3) extra terms of up to twelve (12) months at Council’s sole discretion.
   Council invited written tenders via the Council VendorPanel e-portal on 2 June 2021 and
   advertised the tender within the Noosa Today publication on 4 June 2021, with responses
   closing on 24 June 2021.
   Eleven (11) responses were received within the VendorPanel e-portal from the following
   suppliers in alphabetical order:
          Aaction Traffic Control Pty Ltd
          Altus Traffic Pty Ltd
          East Coast Traffic Controllers Pty Ltd
          Guardrite Security and Traffic Management (Qld) Pty Ltd
          Schramm Group Pty Ltd
          The Traffic Design Company Pty Ltd
          Traffex Australia Pty Ltd
          Traffic Management People
          Traffic Qld Pty Ltd
          Verifact Traffic Pty Ltd
          Warp Qld Pty Ltd
   An initial compliance review was performed by the Procurement Unit of each of the responses
   to ensure responses met the minimum tender requirements. Warp Qld Pty Ltd did not provide
   a response via Council’s response documentation and therefore was deemed non-conforming,
   leaving ten (10) conforming submissions for evaluation.

   2.      Tender Evaluation
   The conforming tenderers were evaluated using the Council’s Weighted Attribute Evaluation
   spreadsheet against the following evaluation criteria and weightings:

        Criteria                                         Weighting
        Price                                            35%
        Capability & Resourcing                          10%
        Contract Experience & Capacity                   10%
        Quality                                          5%
        Methodology                                      10%
        Health & Safety                                  15%
        Environment & Sustainability                     5%
        Contribution to Local Economy                    10%

   The evaluation was conducted by the Evaluation Panel that consisted of the following
   members of staff:
      Works Maintenance Coordinator (Contract Administrator)
      Civil Operations: Maintenance Planning Coordinator
      Technical Officer - Parks and Gardens
      Workplace Health and Safety Advisor (Safety Only)
      Technical Officer Civil Operations

                                                                                      Page 35 of 58

Section 36

GENERAL COMMITTEE MEETING AGENDA                                             15 NOVEMBER 2021


   Each member of the Evaluation Panel read and declared that they understood and accepted
   the probity requirements, which includes a declaration of conflicts of interest and
   confidentiality.
   The tender submission from The Traffic Design Company Pty Ltd proposed design services
   for traffic management plans and traffic guidance schemes and did not provide a response
   specifically for traffic control services. Therefore, the tender from The Traffic Design Company
   Pty Ltd was not evaluated as it did not provide the complete traffic control service sought by
   Council.
   A pricing scenario was developed to evaluate the pricing (schedule of rates) based on current
   traffic control activities. The lowest priced submission was tendered by Traffic Management
   People Pty Ltd ATF the Abrahamson Family Trust. The pricing by Traffic Management People
   Pty Ltd ATF the Abrahamson Family Trust was consistent with the current contract rates with
   very little deviation.
   The tender evaluation panel completed the evaluation process and considered Traffic
   Management People Pty Ltd ATF the Abrahamson Family Trust t/as Traffic Management
   People to be the most advantageous to Council.
   Council was advised on 18 October 2021 that Traffic Management People Pty Ltd ATF the
   Abrahamson Family Trust t/as Traffic Management People was sold to Traffic Management
   People No.2 Pty Ltd effective 1 October 2021.
   At Council’s Ordinary Meeting of 21 October 2021, Council resolved to defer the tender award
   to enable the CEO to provide advice at a future Council meeting regarding finalising this tender.
   Council’s Procurement Team reviewed the tender, including seeking advice regarding the sale
   of the preferred tenderer in the context of the tender evaluation and proposed award.
   Council’s Procurement Team subsequently formed the view that the tender from Traffic
   Management People Pty Ltd ATF the Abrahamson Family Trust t/as Traffic Management
   People could not be accepted (as that entity could no longer provide the services as tendered)
   and that the new entity Traffic Management People No.2 Pty Ltd could not be considered under
   this tender process as it had not submitted a tender.
   Subsequently, the tender evaluation panel reconvened to consider its initial recommendation
   in light of the above, and as a result the panel concluded that, of the submitted tenders capable
   of acceptance, the tender from Verifact Traffic Pty Ltd was the most advantageous to Council,
   presenting the best value for money, including demonstrating the following:
        High level of experience and capability;
        Adequately resourced;
        A detailed methodology demonstrating their understanding of the scope;
        Contributing to the local economy with locally based staff; and
        Third party accredited and certified management systems for Quality Assurance and
         Occupational Health and Safety.
   Attachment 1 – Evaluation Spreadsheet presents the evaluation outcome of the conforming
   submissions against the above criteria.

   3.    Next Steps
   Subject to award, Verifact Traffic Pty Ltd will commence providing traffic control services to
   Council on 22 November 2021 after the existing contract for traffic control services expires on
   21 November 2021.
   Previous Council Consideration
   Ordinary Meeting Minutes, 21 October 2021, Item 3 Page 11
   That Council note the report by the Acting Civil Operations Manager to the Services &
   Organisation Committee Meeting dated 12 October 2021 regarding Contract No. T000048 for

                                                                                   Page 36 of 58

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                    15 NOVEMBER 2021


   Traffic Control Service and defer a decision on the awarding of this tender on the basis that
   Council has been advised that the preferred tenderer has sold their business to a different
   entity and request the CEO to provide advice to a future Council meeting on how to finalise
   this tender process given that circumstance.
   Finance
   The traffic control services contractor is engaged under a schedule of rates contract utilising
   existing budget from capital and operational expenditure. Expenditure against this contract is
   estimated to be approximately $750,000 per year.
   Risks & Opportunities
    Safety Risks                                Mitigation
    Verifact Traffic Pty Ltd fails to ensure    Prior to commencement of services, Verifact Traffic Pty Ltd
    the work is conducted safely and in         management plans, Safe Work Method Statements, Job
    accordance with minimum standards.          Hazard Analysis (or similar) and other documentation will be
                                                submitted, reviewed, and accepted by Council.
                                                Council will undertake surveillance, regular safety audits and
                                                inspections throughout the service period.

    Resource Risks                              Mitigation
    Quality, safety, and service are affected   Verifact Traffic Pty Ltd have nominated a highly capable
    due to resource shortages.                  team for this project and can add additional and appropriately
                                                skilled resources as required.
                                                Council can engage the services of other traffic control
                                                service contractors in the event of Verifact Traffic Pty Ltd
                                                being unable to supply services. Council will regularly
                                                monitor any patterns where Verifact Traffic Pty Ltd are
                                                unable to supply traffic control services as required so as to
                                                ensure ongoing services into the future.
   Consultation
   External Consultation - Community & Stakeholder
   Nil.

   Internal Consultation
   Corporate Services (Procurement), Infrastructure Services (Infrastructure Planning, Design
   and Delivery), and Executive Services (People and Culture – Workplace Health & Safety).

   Departments/Sections Consulted:

          Chief Executive Officer      Community Services                           X   Corporate Services
          Executive Support            Director                                         Director
                                       Community Development                            Financial Services
                                       Community Facilities                             Fleet
                                       Libraries & Galleries                            ICT
                                       Local Laws                                   X   Procurement
                                       Waste & Environmental Health                     Property
                                                                                        Revenue Services

    X     Executive Services           Environment & Sustainable Development        X   Infrastructure Services
          Director                     Director                                     X   Director
          Community Engagement         Building & Plumbing Services                     Asset Management
          Customer Service             Development Assessment                           Buildings and Facilities
          Governance                   Economic Development                         X   Civil Operations
    X     People and Culture           Environmental Services                           Disaster Management
          (Safety)                     Strategic Land Use Planning                  X   Infrastructure Planning,
                                                                                        Design and Delivery




                                                                                           Page 37 of 58

Section 38

GENERAL COMMITTEE MEETING AGENDA   15 NOVEMBER 2021


 Attachment 1




                                       Page 38 of 58

GENERAL COMMITTEE MEETING AGENDA                                                               15 NOVEMBER 2021

   Attachment 1

                                                                                        Attachment No.1 - Evaluaton Spreadsheet
                        NOOSA SHIRE COUNCIL _ Weighted Attribute Evaluation Spreadsheet - Final Evaluation

                       (Contorming Tenders Only)        {excl of GST)
                      T [aacion Trafficcontralriyd
                      2 [Attus Trafic Pty Lid
                      3 [East Coast Traffic Contrat —_— —
                      4 [Guardrite Security and Traffic Management Old Pty Lic
                      5 [Schramm Group Pty Lid
                      6 [The Traffic Design Company Pty ttd_  Se 3
                      7 [Traffex Australia Pty Ute
                      8 [Traffic Management People    =a
                      9 [Traffic le & NSW
                     10 [Veritact Wratfic Pry Ua . ee
                      NON-CONFORMING TENDERS
                     Se          ee       aa   — =       eS —
                                                          Ee  a                sil aiaiiilaiiiiaal               aeeecee            oan           bee

                       eemeemmmememey                  © | or | me | ow |        | ce | ot | co | oe | om |      | om |     fe | oe || | oe |               |  ee

                       fence              | ms            fom fs | oe |          | om |     [om |      [om] ||             [we] = [os | ms | wo] me | no |

                         monje] se |                                  em    |   see    [sme       |e |           om     || |
                      fp      rermatteateomsescomtis  || re                 |    saws] sss        Pes                     we            ee
                         Fees (Pc)          ee           $2,223,620 $2,540,550            $2,300,651 $2,387,007                                 $2,724,130 $2,256,422
                                            ee                                                    ee
                         escort                       ee)
                             Price Score Pa           Pee es                                         es
                            Pre eare            pe |                 soem                              ee                   ee
                                                                                ea             re                     4]           a
                                   TOTAL RANK                       :                                         =a                  = eI
                       SS                                                                            SS ee
                                                       a                                           cond weightings ofthis    Be.
                       [Assesment PanelMember3    | Workplace Health and Safety Advisor (PR) | [ “Contract Administrator's signature: | Works Maintenance Coordinator(8F)

                Evaluation Workbook - Amended to Verifact                                 Page 1                                                                   3/11/2021

                                                                                                      Page 38 of 58

Section 39

GENERAL COMMITTEE MEETING AGENDA                                             15 NOVEMBER 2021


   9     FREE WEEKEND BUS TRIAL

   Author            Special Projects Coordinator, Adam Britton
                     Infrastructure Services Department

   Index             ECM/ Project & Contract / Public Transport / Free Holiday Bus (PT-
                     FHB)
                     ECM/ Subject / Transport / Holiday Buses – Free Buses – Go Noosa

   Attachments       Nil


   EXECUTIVE SUMMARY
   This report outlines the proposal for the trialling of Free Weekend Buses whereby Council pays
   TransLink an agreed fee to allow passengers to travel for free every weekend and long
   weekend on existing TransLink buses that travel within Noosa.
   The trial is aimed at encouraging more residents, staff and visitors to use public transport to
   travel around the shire, in particular to assist those wishing to access busy locations such as
   Hastings Street where parking is constrained.
   The proposed Free Weekend Buses trial is an extension of the existing Go Noosa Free Bus
   program that operates during the Christmas and Easter school holiday periods. The cost for
   this initial trial is proposed to be covered by the existing levy.
   The trial period would commence on 24 January 2022 straight after the Christmas Go Noosa
   Free Holiday Bus program concludes and continue to 30 June 2023. The approximate 18-
   month period is to allow for the initial start-up period and then a clear financial year period as
   the embedded trial period.
   Pending the uptake and patronage of the trial, it is envisaged that the Free Weekend Buses
   be an ongoing transport initiative.

   RECOMMENDATION
   That Council note the report by the Special Projects Coordinator to the General Committee
   Meeting dated 15 November 2021, and
   A.    Subject to TransLink agreement, approve the use of Free Weekend Bus travel on
         TransLink services 626,627,628,629 and 632 between 24 January 2022 and 30 June
         2023;
   B.    Delegate CEO to negotiate with TransLink on the trial specifics;
   C.    Note that an evaluation report will be presented to Council prior to conclusion of the 18-
         month trial period for consideration of continuing the trial;
   D.    Fund the cost of the free weekend bus trial for the period January 2021 to June 2022
         from the Sustainable Transport Levy reserves and include the funding at Budget Review
         2 (BR2); and
   E.    Undertake a review of the Transport Levy pricing structure to accommodate the service
         as part of the 2022/2023 budget development process.

   REPORT
   1.    Background
   Council currently receives funding through the Transport Levy which is used to fund a number
   of transport initiatives. The most well-known initiative funded by the Transport Levy is the Free

                                                                                   Page 39 of 58

Section 40

GENERAL COMMITTEE MEETING AGENDA                                             15 NOVEMBER 2021


   Holiday Buses under Go Noosa branding.
   The Free Holiday Buses currently operate during the Christmas and Easter school holidays
   under the approval of TransLink where Council pays TransLink for loss of revenue on the
   existing buses that operate solely within Noosa Shire, and Council pays a TransLink approved
   operator the full cost for the additional services of the 064 Peregian to Noosa Heads route and
   the 064 Loop Bus.
   Prior to 2018 the Free Holiday Bus program operated for 10 days each year around the
   Christmas to New Years’ Day period. This initiative grew to 16 weeks each year in 2018
   following introduction of the Transport Strategy which has a number of desired outcomes
   including encouraging modal shift to sustainable transport and reducing the number of people
   choosing to drive and park in congested coastal areas. It also saw the introduction of the 065
   Loop Bus in 2020 following community and business requests for a dedicated Loop Bus in the
   visitor centred area of Noosa and Noosaville.
   After three years of operating the extended Free Holiday Bus program it has been evidenced
   through high patronage that providing free public transport does provide a significant incentive
   for residents and visitors to use public transport and has prompted the consideration of
   extending the offering to every weekend of the year.
   2.    Free Weekend Buses
   As described above, providing free buses has been shown to increase the use of public
   transport which has prompted consideration of free buses during other busy periods of the
   year. Typically Noosa is busy and parking supply is more constrained during the holidays and
   weekends.
   The extension of free buses into the weekends including long weekends is seen as the next
   step of incentivisation and would be a major change of traveling around Noosa allowing
   visitors, residents and staff to:
         create a more consistent travel behaviour and experience of using public transport; and
         offset many of the previous negative experiences when traveling into the Noosa coastal
          areas by private car during the weekends.
   Staff have been in consultation with the Hastings Street Association who are supported by the
   Noosa Chamber of Commerce and Industry Inc, Cooroy Chamber of Commerce Inc, Noosa
   Junction Association and Noosaville Business Association in requesting Council implement
   the trial. The Hastings Street Association cites local tourism and the business sector have been
   under unrelenting financial pressures from the pandemic impacts.
   At a Hastings Street Association meeting attended by over 40 business members on
   Wednesday 18 August 2021, the issue of a lack of parking was voiced as the number one
   barrier to broader local engagement with the Hastings Street precinct and a barrier to attracting
   and retaining key workers.
   This transport and business stimulus initiative has both immediate and long-term benefits for
   our local community (including both residents, visitors, employees and local business)
   including but not limited to:
   1.    A permanent free weekend service would expedite habitual change for the local
         community to reduce car usage.
   2.    A permanent free weekend service would ensure those staff working in the precinct every
         weekend will avoid the need to drive, and would be able to utilise a safe and reliable
         means of transport.
   3.    A permanent free weekend service would assist Council’s on-going issues with parking
         in local residential streets (particularly during peak season when Hastings Street
         employs 2,800 people).
   4.    An initiative which resonates with our region and Council’s vision – ‘different by nature’,
         and can be used as an attractor to promote visitation and spend in the precinct; and


                                                                                   Page 40 of 58

Section 41

GENERAL COMMITTEE MEETING AGENDA                                                   15 NOVEMBER 2021


   5.          It provides valuable connectivity for the community, benefits the whole community and
               will start to break the local mindset that Noosa Heads is ‘out of bounds’ due to parking
               challenges on weekends.
   Noosa Council is also planning the commencement of the Noosa Parade upgrade in early
   2022 which is expected to require over six months of construction resulting in disruption to
   traffic and car parking along Noosa Parade. The introduction of Free Weekend Buses may
   assist in alleviating impacts from the construction period.
   The existing TransLink services that operate in Noosa which is proposed Council fund during
   holidays include:
              626 – Tewantin to Sunrise Beach via Noosa Heads
              627 – Tewantin to Sunshine Beach via Noosa Heads
              628 – Parklands to Noosa Junction via Noosa Civic
              629 – Tewantin to Noosa Junction via Noosa Civic
              632 – Noosa to Cooran via Cooroy and Pomona.
   Services that operate outside of the shire are not able to be offered as a free service.
   The introduction of Free Weekend Buses in addition to the existing Christmas and Easter Free
   Holiday Buses will result in approximately 150 days of a calendar year being free to the public.
   This initiative will be viewed not only by Noosa but by other towns and countries as a test case
   for free public transport.
   The evaluation of the new initiative will be in line with the existing evaluation carried out for the
   Free Holiday Buses and reported to Council. The timing of the evaluation will be ahead of the
   completion of the trial period to allow adequate time to continue with the initiative.
   Previous Council Consideration
   Nil.
   Finance
   The below table identifies estimated costs for operating the trial in the respective financial
   years.

       Item                                         2021-2022            2022-2023
       Free Weekend Bus – TransLink cost            $66,000              $180,000
       Marketing                                    $20,000              $20,000
       Total                                        $86,000              $200,000

   Currently there is $978,000 held in reserve for the Sustainable Transport Levy. It is proposed
   that the 2021/2022 current year cost of $86,000 be funded from reserve. For the 2022/2023
   financial year, it is proposed that the pricing structure and program priorities for the levy be
   reviewed as a part of the 2022/2023 budget process to ensure levy pricing meets the
   requirements of all endorsed initiatives and trials, including this proposed free weekend bus
   trial.
   Risks & Opportunities
   TransLink have provided estimated costs for the trial however are to yet formally approve the
   proposal which is an outstanding risk being mitigated through consultation.
   The risk of not implementing the Free Weekend Bus trial is the loss of an opportunity to assist
   business and extend what is already a successful initiative during the peak holidays.
   The year round incentivisation of public transport will accelerate transport strategy objectives.



                                                                                       Page 41 of 58

Section 42

GENERAL COMMITTEE MEETING AGENDA                                             15 NOVEMBER 2021


   Consultation
   External Consultation - Community & Stakeholder
   Hastings Street Association
   TransLink
   Internal Consultation
   Strategic Planning
   Economic Development

   Departments/Sections Consulted:

       Chief Executive Officer       Community Services                      X   Corporate Services
       Executive Support             Director                                X   Director
                                     Community Development                       Financial Services
                                     Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

       Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                X   Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                X   Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                 X   Strategic Land Use Planning             X   Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                    Page 42 of 58

Section 43

GENERAL COMMITTEE MEETING AGENDA                                                          15 NOVEMBER 2021


   10        FINANCIAL PERFORMANCE REPORT – OCTOBER 2021

   Author                Acting Manager Financial Services, Pauline Coles
                         Corporate Services Department

   Index                 ECM/ Subject/ 22.09 – Monthly Financial Performance Report

   Attachments           1.     Statement of Income and Expenditure (Profit & Loss and Capital)
                         2.     Statement of Financial Position
                         3.     Statement of Cash Flows
                         4.     Summary of Materials and Services Expenditure


   EXECUTIVE SUMMARY
   Year-to-date (YTD) performance against current budget as at 31 October 2021 is positive with
   both operating revenues outperforming forecast and operating expenditure slightly under
   forecast YTD. Capital revenues and expenditures are in line with forecast.

    YTD Financial Performance Summary
                                           Budget            Actual        Variance      Variance        Status
                                              $m                $m              $m             %
    Operating Revenue                        $47.8            $50.2               $2.4           5.1%   On Track
    Operating Expense                        $35.2            $34.9               $0.3           0.9%   On Track
    Operating Position                       $12.6            $15.3               $2.7      21.6%
    Capital Revenue                            $8.4             $8.4              $0.0           0.0%   On Track
    Capital Expenditure*                       $8.6             $8.6             -$0.1       -0.6%      On Track
   * Reflects constructed assets and intangibles only (excludes contributed)


   Financial statements including Statement of Income & Expenditure, Statement of Financial
   Position (balance sheet), and Statement of Cash Flows are included as attachments for
   information for Council.

   Figure 1: Actual Performance Compared to Budget

     $60
                                                         YTD Budget ($m)
                              $47.8       $50.2          YTD Actual ($m)
     $50

     $40
                                                                               $35.2     $34.9

     $30

     $20

     $10

        $-
                          Operating Revenue                                Operating Expenditure




                                                                                                   Page 43 of 58

Section 44

GENERAL COMMITTEE MEETING AGENDA                                                     15 NOVEMBER 2021


   Council’s performance against key measures of financial sustainability have been calculated
   as at October 2021. These indicators enable the reader to assess Council’s success in
   managing its budget, cash and debt as well as undertaking sustainable asset management.
   The table below contains a snapshot of a number of key measures, with full detail included in
   the report.

    YTD Measures of Financial Sustainability
                                        Target          Current      Actual YTD
                                                        Budget
    Operating Surplus Ratio            0-10%           -0.6%           30.5%          On Track
    Net Financial Liabilities Ratio    <60%            -4.9%           -87.1%      Above Target
    Cash Cover Ratio                  3 months    6.8 months        11.9 months    Above Target
    Asset Sustainability Ratio         > 90%           121.9%          17.2%          On Track

   RECOMMENDATION
   That Council note the report by the Acting Manager Financial Services to the General
   Committee Meeting dated 15 November 2021 outlining October 2021 year to date financial
   performance against budget, including changes to the financial performance report with the
   inclusion of key financial sustainability indicators.


   REPORT
   Operating Revenue (YTD Benchmark 33%)
   Council has received 47% ($50.2 million) of its operating revenue budget ($107.2 million).
   Commentary on each revenue category is provided below.

    Category              Summary                          Comments
    Rates and Levies      $37.4 million (50%) of the             Waste utility charges $318k above YTD
                          annual budget of $74.6                  budget (52% or $6.7 million of $12.9 million
                          million has been earned                 budget earned)
                                                                 General rate (net of discount) $133k below
                                                                  YTD budget (50% or $28.5 million of $57.2
                                                                  million budget earned)
    Fees and              $3.8 million (53%) of the $7.2         Development assessment fees $541k above
    Charges               million annual budget has               YTD budget (59% or $1.1 million of $1.8
                          been earned                             million budget earned)
                                                                 Plumbing application fees $249k above YTD
                                                                  budget (57% or $590k of $1.0 million budget
                                                                  earned)
                                                                 Building application fees $70k above YTD
                                                                  budget (40% or $320k of $791k budget
                                                                  earned)
    Sale of Goods         $4.1 million (41%) of the              Waste management sale of recoverable
    and Services          $10.2 million budget has                materials $342k above YTD budget (72% or
                          been received                           $617k of $855k budget earned).
                                                                 Waste management disposal fees $160k
                                                                  above YTD budget (35% or $1.3 million of
                                                                  $3.7 million budget earned)
                                                                 Holiday Park sales $269k above YTD budget
                                                                  (42% or $1.2 million of $2.8 million budget
                                                                  earned) – offset by higher operating costs



                                                                                           Page 44 of 58

Section 45

GENERAL COMMITTEE MEETING AGENDA                                                                 15 NOVEMBER 2021


    Category               Summary                                 Comments
                                                                    Community Facilities (NAC, NLC and The J)
                                                                      $216k above YTD budget (34% or $889k of
                                                                      $2.6 million budget earned) – offset by higher
                                                                      operating costs
    Interest               $248k (37%) of the $670k                   Interest revenues on cash invested will
    Received               annual budget has been                      continue to be monitored given low interest
                           earned                                      rates and impacts on term deposit / cash
                                                                       fund rate returns
    Other Revenue          $890k (29%) of the $3.1                    Other revenue is in line with budget
                           million budget has been                     expectations at this stage
                           earned
    Operating              $2.1 million (37%) of the $5.8             Operating grants are in line with budget
    Grants,                million budget has been                     expectations at this stage.
    Subsidies              received                                   50% ($1.2 million) of the financial assistance
                                                                       grant was again prepaid in June 2021 and
                                                                       may impact on Council’s 2021/22 final
                                                                       operating position if the prepayment
                                                                       approach is discontinued by the Australian
                                                                       government.
    Unitywater             On track                                   Unitywater distributions are fixed each year
    Distributions                                                      so little budget variance risk

   Figure 2: Operating Revenue Position by Type (Excluding Rates)

     $4.5                                        $4.2                       YTD Budget ($m)
                    $3.8
     $4.0
                                                                            YTD Actual ($m)
     $3.5
                                          $3.1
            $2.7
     $3.0
     $2.5
                                                                                     $2.1 $2.2
     $2.0
                                                                                                    $1.6 $1.6
     $1.5
     $1.0
                                                        $0.5 $0.6
                            $0.3 $0.2                                  $0.3 $0.3
     $0.5
     $0.0
                                           Goods &




                                                         Income




                                                                           Other




                                                                                        Grants
                Charges




                                                                                                      Unitywater
                                           Services
                                           Sales of




                                                          Rental
                               Interest
                Fees &




                                                                                                       Share of




   Operating Expenditure (YTD Benchmark 33.33%)
   Actual operating expenditure is currently 32% ($34.8 million) of full year budget ($107.9
   million). Detailed commentary for each expenditure category is provided below.

    Category               Summary                                 Comments
    Employee Costs         $12.5 million (33%) of the                 Under expenditure for permanent staff
                           annual budget of $37.7                      salaries and wages ($1.1 million) partially
                           million has been expended                   offset by additional spend on casual staff and
                                                                       external labour hire ($656k)
    Materials and          $15.4 million (31%) of the                 Waste Management $324k below YTD
    Services               $49.3 million annual budget                 budget (29.6% or $3.3 million of $11.1 million
                           has been expended.                          budget spent)


                                                                                                     Page 45 of 58

Section 46

GENERAL COMMITTEE MEETING AGENDA                                                                               15 NOVEMBER 2021


    Category                   Summary                                            Comments
                                                                                   Mayor and Councillor Support costs $77k
                                                                                     above YTD budget ($79k of $8k budget
                                                                                     spent) – subscription for Council joining the
                                                                                     SEQ Council of Mayors
                                                                                   CEO’s Office $95k above YTD budget
                                                                                     (89.4% or $271k of $303k budget spent) –
                                                                                     Kin Kin Quarry legal appeal costs
                                                                                   Holiday Parks $230k above YTD budget
                                                                                     (47.3% or $678k of $1.4 million budget
                                                                                     spent) – offset by additional revenue
    Finance Costs              On track                                           Nil
    Depreciation               On track                                           Nil
    Other Expenses             On track                                           Nil

   Figure 3: Operating Expenditure Position by Type

    $18.0
                                     $15.6 $15.4                                    YTD Budget ($m)
    $16.0
                                                                                    YTD Actual ($m)
    $14.0      $12.6 $12.5
    $12.0
    $10.0
     $8.0
                                                                                            $6.5 $6.5
     $6.0
     $4.0
     $2.0
                                                               $0.4 $0.4                                         $0.1 $0.1
     $0.0
                                          Materials




                                                                  Finance Costs
                   Employees




                                                                                                Depreciation




                                                                                                                    Other




   Tourism and Economic Development Investment
   Council resolved to report on a monthly basis investment details for tourism and economic
   development. Expenditure as at 31 October 2021 is outlined below, which includes the first
   instalment payment to Tourism Noosa under the funding agreement.
    Expenditure                                       Annual                YTD                 YTD
                                                      Budget              Budget              Actual
                                                         $m                  $m                  $m
    Payment to Tourism Noosa                           $2.52                      $1.26        $1.26
    Economic Development                               $0.95                      $0.23        $0.18
    Total                                              $3.47                      $1.49        $1.44

   Capital Revenue
   YTD capital revenue of $8.4 million received comprises cash contributions from developers
   ($1.2 million) and capital grants ($7.1 million). Note that the timing of capital grant receipts are
   generally dependent on the timing of grant conditions and also capital delivery performance,
   and that the timing of the receipt of developer contributions (both cash and contributed) is
   unpredictable.



                                                                                                                   Page 46 of 58

Section 47

GENERAL COMMITTEE MEETING AGENDA                                                      15 NOVEMBER 2021


   Figure 4: Capital Revenue by Type

     $8.0
                                                $7.1               $7.1
     $7.0
                                                                          YTD Budget ($m)
     $6.0
                                                                          YTD Actual ($m)
     $5.0
     $4.0
     $3.0
     $2.0         $1.2                   $1.2
     $1.0
                                                                              $0.0                 $0.0
     $0.0
                         Contributions




                                                       Subsidies




                                                                                     Contributed
                                                        Grants /




                                                                                       Assets
                            Cash




   Capital Program
   Actual capital expenditure (excluding commitments) is $8.6 million (YTD budget $8.6 million).
   Detailed discussion of progress in the delivery of the capital works program is provided through
   a separate quarterly report by the Asset Planning Manager.

   Figure 5: Capital Program Delivery Performance

     $8.0         $7.5                   $7.6

     $7.0
                                                   YTD Budget ($m)
     $6.0
                                                   YTD Actual ($m)
     $5.0

     $4.0

     $3.0

     $2.0
                                                                              $0.6                 $0.6
     $1.0
                                                $0.4               $0.4
     $0.0
                  Capital works                 Other capital                Loan redemption



   Cash Management and Investment Performance
   Total cash on hand at the end of October was $87 million. Included in this balance are funds
   held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
   including the financial assistance grant and other capital works grants, July rates payments
   received, and unspent monies committed for funding capital projects which are underway and
   carrying over from 2020/21 into the 2021/22 financial year.

   The following pie charts present the mix of cash held at October 2021 by agency (graph on the
   left) and by credit risk rating (graph on the right). All funds have been invested in accordance
   with the Investment Policy and in consideration of the principles of ethical investment,
   preservation of capital, return on investment and counterparty thresholds



                                                                                                     Page 47 of 58

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                                      15 NOVEMBER 2021




                             CBA                                                          A1 +
                             4%                                                      (Commercial Banks)
                                                                                           4%




                                   QTC                                                         A1 +
                                   96%                                                        (QTC)
                                                                                               96%




   Figure 6: Closing Cash Held by Agency and Credit Rating
   The following chart monitors the 12 month trend on total cash and the agencies invested. Cash
   balances are at the peak of the cycle following the bi-annual issue of rates and levies in July
   and payments received to October.

   Figure 7: 12 Month Trend of Cash Invested by Agency
    120,000,000



    100,000,000



     80,000,000



     60,000,000



     40,000,000



     20,000,000



             -
                 Nov-20   Dec-20    Jan-21   Feb-21   Mar-21   Apr-21   May-21   Jun-21   Jul-21   Aug-21   Sep-21     Oct-21


                  Bendigo TD         Westpac TD          NAB TD         Suncorp TD        CBA TD       QTC           CBA Operating


   Measures of Financial Sustainability
   The following table incorporates a set of financial sustainability indicators to further assist in
   managing Council financial performance. There are no current emerging risks regarding
   performance noting the early stage of the financial year.




                                                                                                             Page 48 of 58

Section 49

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                             15 NOVEMBER 2021


    Category                                                                                                                                                                           Comments
    Operating Surplus Ratio                                                                                                                                                             Intent: Identifies the
                                         90% 82.6%                                                                                                                                       extent to which revenues
                                         80%
                                                                                                                                                                                         cover operational
                                         70%
                                                                                                                                                                                         expenses, to ensure
                                                           60.9%
                                         60%
                                                                                                                                                                                         community equity is not
                                                                      44.5%
                                                                                                                                                                                         degraded
                                         50%
                                         40%                                                                                                                                            Target: 0 – 10%
                                                                                30.5%
                                         30%                                                                                                                                            Result: 30.5%
                                         20%                                                                                                                                            Comment: The slowly
                                         10%                                                                                                                                             declining ratio reflects the
                                          0%                                                                                                                                             levying of 50% of rates in
                                         -10%                                                                                                                                            July and gradual
                                                    Jul        Aug        Sep       Oct        Nov        Dec        Jan        Feb        Mar        Apr        May        Jun          utilisation of these
                                                                                                                                                                                         monies as expenditure
                                                                     Actual                                 Budget                                      Target
                                                                                                                                                                                         occurs on operations
                                                                                                                                                                                         through the next rate run
                                                                                                                                                                                         in January 2022 and to
                                                                                                                                                                                         then end of the financial
                                                                                                                                                                                         year at 30 June 2022
    Cash Expense Cover                                                                                                                                                                  Intent: Indicates how
                                         14.0                                                                                                                                            long council can continue
                                                                                    12.5                                                              12.8       12.5
                                                                                               12.2                                                                         11.9         paying its day-to-day
     Months (Cash to Cover Operations)




                                                                                                          11.6
                                         12.0                                                                        10.9                                                                expenses from cash at
                                                    10.1                                                                        10.1       10.4
                                                                          9.7                                                                                                            bank without needing
                                         10.0                  9.1
                                                                                                                                                                                         additional cash flows
                                          8.0
                                                                                                                                                                                        Target: > 3 months
                                          6.0                                                                                                                                           Result: 11.9 months
                                          4.0                                                                                                                                           Comment: Council is
                                                                                                                                                                                         forecast to remain above
                                          2.0
                                                                                                                                                                                         target for the financial
                                           -               -          -         -          -          -          -          -          -          -          -          -          -     year. Business as usual
                                                    Nov        Dec        Jan       Feb        Mar        Apr        May        Jun        Jul        Aug        Sep        Oct          expenditure through to 30
                                                               Actual                                                                 Minimum (>0 months)                                June 2022 will continue
                                                               Target (3 months)                                                      Maximum (6 months)                                 to diminish Council’s cash
                                                                                                                                                                                         holdings, albeit not below
                                                                                                                                                                                         the target range of 3 – 6
                                                                                                                                                                                         months.
    Asset Sustainability Ratio                                                                                                                                                          Intent: Measures the
                                         140%                                                                                                                                            extent to which assets
                                                                                                                                                                        121.9%           are being replaced as
                                         120%
                                                                                                                                                                                         their condition degrades
                                         100%                                                                                                                                            to ensure service
                                                                                                                                                                             90%         potential is maintained
                                          80%
                                                                                                                                                                                        Target: 90% of
                                          60%                                                                                                                                            depreciation budget
                                                                                                                                                                                         spent on renewals
                                          40%
                                                                                                                                                                                         annually
                                                                                    17.2%
                                          20%
                                                               6.5% 10.1%                                                                                                               Result: In line with
                                                    0.9%                                                                                                                                 budget
                                               0%
                                                     Jul       Aug        Sep        Oct       Nov        Dec        Jan        Feb        Mar        Apr        May        Jun         Comment: It is expected
                                                                                                                                                                                         that the ratio will
                                                     Actual Renewal Spend (%)                                   Target (%)                    Renewals Budget (%)
                                                                                                                                                                                         progressively increase
                                                                                                                                                                                         each month as
                                                                                                                                                                                         expenditure on renewals
                                                                                                                                                                                         occurs as part of the
                                                                                                                                                                                         capital works program.


                                                                                                                                                                                                    Page 49 of 58

Section 50

GENERAL COMMITTEE MEETING AGENDA                                  15 NOVEMBER 2021


    Category                                                Comments
    Net Financial Liabilities Ratio                          Intent: Outlines the level
                                                              that net Council debt can
      80%
                   60%                                        be serviced by operating
      60%                                                     revenues. A ratio below
      40%
                                                              zero implies that liabilities
                                                              are less than cash (and
      20%                                                     other current assets) and
       0%                                                     there is adequate
                  Target              Budget   YTD Actual     borrowing capacity
      -20%                             -5%
                                                              available if needed.
      -40%                                                   Target: less than 60%
      -60%                                                   Result: -87%
      -80%                                                   Comment: Council has
                                                              low debt levels and
     -100%                                       -87%
                                                              strong cash holdings.
                                                              Cash received from the
                                                              July rates revenue also
                                                              inflates the YTD actual
                                                              position
    Investment Return                                        Intent: Ensure
                                                              appropriate return on
                                                              investment yield for cash
                                                              at bank.
                                                             Target: 0.25% above
                                                              current Bloomberg
                                                              commonwealth 10 year
                                                              bond rate yield (0.01%)
                                                             Result: 0.38%
                                                             Comment: Regardless of
                                                              the current levels of low
                                                              long term bond and
                                                              interest rates (due to
                                                              current economic
                                                              conditions), Council’s
                                                              investment return still
                                                              remains above target




                                                                         Page 50 of 58

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                                                                                   15 NOVEMBER 2021


    Category                                                                                                                                 Comments
    Rates in Arrears                                                                                                                          Intent: Ensuring that the
                                                                                                                                               amount of unpaid rates
                                                 12.0%
        Percentage of Annual Rates in Arrears


                                                                                                                              10.2%            remains sustainable and
                                                 10.0%                            9.5%                                                         does not negatively
                                                                                                                                               impact cash flows
                                                                                           7.4%                                       7.3%
                                                  8.0%
                                                                                                                                              Target: 5% industry
                                                         6.0% 5.8% 5.7%                           6.2%
                                                  6.0%
                                                                                                         5.7%
                                                                                                                5.2%
                                                                                                                                               benchmark
                                                                           5.0%
                                                                                                                       4.6%
                                                                                                                                              Result: 7.3%
                                                  4.0%
                                                                                                                                              Comment: Rates arrears
                                                  2.0%
                                                                                                                                               continue to decline from
                                                                                                                                               the high point in the cycle
                                                  0.0%                                                                                         with payments coming
                                                         Nov   Dec   Jan   Feb    Mar       Apr   May    Jun    Jul    Aug    Sep     Oct      due in September.
                                                                                  Actual           Target
                                                                                                                                               Reminder notices were
                                                                                                                                               issued in October, and
                                                                                                                                               arrears will continue to
                                                                                                                                               stabilise through to
                                                                                                                                               January as they are
                                                                                                                                               collected and payment
                                                                                                                                               arrangements
                                                                                                                                               implemented.

   Previous Council Consideration
   Nil.
   Finance
   As above.
   Risks & Opportunities
   Council’s risk register includes a number of risks that could impact on ongoing financial
   sustainability. Effective budget management and reporting is an important risk mitigation tool.
   Consultation
   External Consultation - Community & Stakeholder
   Nil.
   Internal Consultation
   All areas of Council are consulted as part of the regular monitoring of budget performance.
   Departments/Sections Consulted:
    X                                           Chief Executive Officer           X        Community Services                                     X   Corporate Services
                                                Executive Officer                          Director                                               X   Director
                                                Executive Support                          Community Development                                  X   Financial Services
                                                                                           Community Facilities                                       ICT
                                                                                           Libraries & Galleries                                      Procurement & Fleet
                                                                                           Local Laws                                                 Property
                                                                                           Waste & Environmental Health                               Revenue Services

    X                                           Executive Services                X        Environment & Sustainable Development                  X   Infrastructure Services
                                                Director                                   Director                                                   Director
                                                Community Engagement                       Building & Plumbing Services                               Asset Management
                                                Customer Service                           Development Assessment                                     Buildings and Facilities
                                                Governance                                 Economic Development                                       Civil Operations
                                                People and Culture                         Environmental Services                                     Disaster Management
                                                                                           Strategic Land Use Planning                                Infrastructure Planning,
                                                                                                                                                      Design and Delivery




                                                                                                                                                         Page 51 of 58

Section 52

GENERAL COMMITTEE MEETING AGENDA   15 NOVEMBER 2021


 Attachment 1




                                       Page 52 of 58

GENERAL COMMITTEE MEETING AGENDA                                                                 15 NOVEMBER 2021

   Attachment 1

    Profit and Loss Statement
    Revenue
        Recurrent Revenue
        Rates, levies and charges                       74.581        37,177        37,380          203        50%
       Fees and charges                                  7.185         2717          3,773          1,057      53%
       Interest received                                 670            258           248            (10)      7%
        Sale of Goods and major services               10.224         3,138          4,153          1,014      41%
       Sale of contract and recoverable works              2B              -             0             0        1%
        Rental & lease income                            1,885          540           626             85       33%
       Other income                                      1,224          204           264           (30)       2%
        Grants, subsidies, contributions and donations   5797         2,053          2,150            oT       37%
       Unitywater Distributions                          5,650         1,612          1,612             -      20%
                                                       107,248       47,790         30,206         2416        47%
    Expenses
        Recurrent Expenses
        Employee benefits                              37,701         12,608        12,519            oo       33%
       Materials and                                    40,203        15,504        15,379           215       31%
       Finance costs                                     1114           381           382             (1)      w%G
       Depreciation                                    19.589          6,530         6,531            (1)      33%
       Other expenses                                    233             72            68              3       2%
                                                       107,941       35,185         34,880           305       32%
    Operating Result                                                 ROSS                           Te
    Summary of Capital Expenditure and Funding
    Capital Funding
        Capital cash contributions and infrastructure charges 1,387    1,230          1,230             -      88%
       Contributed assets                                1,500           45            45               -       3%
        Capital grants and subsidies                   24,984         7,105          7,105              -      28%
        Cash / revenue                                 24,054           222             2            113        1%
       New loan borrowings                              2.360              -             -              -      o%
       Other capital revenue                                -              -             -              -      o%
   Total Capital Funding                               SSA            BO
    Capital Expenditure
        Contributed assets                               1,500           45            45               -       3%
        Capital works - constructed assets             47,579         7,515          7,569            sed      16%
        Capital works - other capital                    4818           401           402              1        8%
        Loan redemption                                  1.297          ass           oe                -      50%
        pales     aes                                       -              -           58            58        o%

                                                                                                        Page 52 of 58

Section 53

GENERAL COMMITTEE MEETING AGENDA   15 NOVEMBER 2021


 Attachment 2




                                       Page 53 of 58

GENERAL COMMITTEE MEETING AGENDA                                                                15 NOVEMBER 2021

   Attachment 2

     Current Assets
          Cash and cash equivalents                                     49,747                85,658                 68,895
          Trade and other receivables                                   10,137                 12,544                  7,467
          Inventories                                                      181                    147                   144
          Contract Assets                                                    -                  487                     487
          Other current assets                                           2,912                  4,351                  4,955
                                                                       62,978                 103,188                81,948
          Non Current Assets held for sale                                   =                      =                      =
     Total Current Assets                                              62,978                 103,188                81,948
     Non Current Assets
          Trade and other receivables                                   49.593                 49 468                49 468
          Other non current Assets                                           -                      -                      -
          Investments                                                  88,040                 92,434                 92,434
          Investment property                                           3,000                   2,900                  2,900
          Property, plant and equipment                              1,009,996               954,164                952,579
          Right of Use Assets                                              161                    89                     89
          Intangible assets                                              8,128                  2,862                  3,036
     Total Non Current Assets                                        1,158,917              1,101,917              1,100,506
     Total Assets                                                    1,221,895              1,205,104              1,182,454
     Current Liabilities
          Trade and other payables                                      7,151                   9.321                 10,468
          Contract Liabilities                                               -                  4377                   4377
         Borrowings                                                       848                   500                     955
          Lease Liablities                                                   -                    25                     25
          Provisions                                                     7,582                 5,021                   4,947
         Other                                                           4,780                  3,340                  2,898
     Total Current Liabilities                                         20,361                 22,584                 23,669
     Non Current Liabilities
         Borrowings                                                     21,989                20,258                 20,258
          Lease Liabilities                                                110                    66                     66
          Provisions                                                    15,307                 16,555                 16,555
     Total Non Current Liabilities                                      37,406                36,879                 36,879
     Total Liabilities                                                 57,767                 59,464                 60,549
     Net Community Assets                                            1,164,128             1,145,641              1,121,905
     Community Equity
          Asset Revaluation Surplus                                    121,483                108,561                108,473
          Retained Surplus / (Defeciency)                                    -                      -                      -
          Shire Capital                                              1,042,645              1,008,596              1,004,202
          Current Year Net Eamings                                           -                 28,484                  9,230
     Total Community Equity                                          1,164,128             1,145,641              1,121,905

                                                                                                       Page 53 of 58

Section 54

GENERAL COMMITTEE MEETING AGENDA   15 NOVEMBER 2021


 Attachment 3




                                       Page 54 of 58

GENERAL COMMITTEE MEETING AGENDA                                                                   15 NOVEMBER 2021

   Attachment 3

     ‘Cash flows from operating activities
          Cash Flows from Operating Activities
          Receipts from Customers                                                 92,622              43,397              93,975
          Payments to Suppliers and Employees                                     (87.376)           (31,181)            (84,528)
                                                                                    5,246             12.216               9447
          Receipts:
          Investment and Interest Revenue Received                                  3,270                752               3.401
          Rental Income                                                             1,874               626                1,365
          Non Capital Grants and Contributions                                      5,765              2.150               6,085
          Income Tax Equivalent Received                                            1,200                477               1,450
          Income from Equity Investments                                            1,850               630                1,600
          Payments:
          Borrowing Costs                                                               -                  -              (2.499)
          Interest Expense                                                           (516)               (55)               (131)

     ‘Cash Flows from Investing Activities
          Receipts:
          Proceeds of Sale of Property, Plant and Equipment                             -                103                217
          Grants, Subsidies, Contributions and Donations                          26,381               8.335              13,679
          Payments:
          Payments of Property, Plant and Equipment                               (51,568)            (7.832)            (22,721)
          Payments for Intangible Assets                                             (829)              (139)             (1,385)
         Net Movement in Loans and Advances                                             -                125                 125

     ‘Cash Flows from Financing Activities
          Receipts:
          Proceeds from Borrowings                                                 2,360                   -               2,500
          Payments:
          Repayment of Borrowings                                                   (736)               (626)             (1,263)

          Cash and Cash Equivalents at the beginning of the reporting period      55,451             68.894               57,023

                                                                                                          Page 54 of 58

Section 55

GENERAL COMMITTEE MEETING AGENDA   15 NOVEMBER 2021


 Attachment 4




                                       Page 55 of 58

GENERAL COMMITTEE MEETING AGENDA                                                                    15 NOVEMBER 2021

   Attachment 4

        Materials and services
        Advertising and Marketing                              227             68               63               6       28%
        Administration Supplies and Consumables                 751            241            227               14       30%
        Audit Expenditure                                       174             11              13             (2)        8%
        Communications and IT                                 684              297            298              (1)       44%
        Commission Paid                                       1,079            358            480            (122)       44%
        Consultancy Services                                  1,166           304             293               1        25%
        Contract Services                                   23,482            6,666          6,363            303        27%
        Contributions, Donations, Sponsorship and Prizes     3,471            1,598          1,628            (29)       47%
        Electricity                                           1,729           543              533              10       31%
        Intemal Fleet Costs and External Plant Hire           1,668            488            553             (64)       33%
        Grants Paid to Community Organisations                1,934            813             817             (4)       42%
        Insurance                                              690             645            635               10       92%
        Legal Expenses                                        1,272           386             509            (124)       40%
        Operating Leases and Rentals                           292             145             140               5       48%
        Software and Maintenance                              2,166            782             810            (27)       37%
        Subscriptions and Registrations                        291             183            269             (86)       92%
        Waste Levy Payments                                   1,460            487             496             (9)       34%
        Water and Sewerage Charges                            1,084           304             204              100       19%
        All Other Materials and Services                      5,684           1,274           1,048           225        18%
                                                            49,303           15,594         15,379             215       31%

                                                                                                           Page 55 of 58

Section 56

GENERAL COMMITTEE MEETING AGENDA                                            15 NOVEMBER 2021


   12     NOOSA SHIRE COUNCIL 2020-21 ANNUAL REPORT

   Author       Governance Advisor, Diana Stewart
                Executive Services Department

   Index        ECM/ Subject 27.02 Annual Report

   Attachments       1.     Noosa Shire Council 2020-21 Annual Report (131 page attachment
                            provided separately to this report)



   EXECUTIVE SUMMARY
       Pursuant to section 182 of the Queensland Local Government Regulation 2012, Council
        has prepared an annual report for FY 2020-21.
       The purpose of the Annual Report is to inform the community about Council’s activities and
        financial performance throughout the 2020/21 financial year.
       The Annual Report includes the 2020/21 Audited Financial Statements.

   RECOMMENDATION
   That Council note the report by the Governance Advisor to the General Committee Meeting
   dated 15 November 2021 and:
   A.     Adopt the Noosa Council 2020-21 Annual Report incorporating the 2020/21 Audited
          Financial Statements.
   B.     Authorise the Chief Executive Officer (CEO) to make any required minor amendments
          to the document prior to publication.


   REPORT
   3.     Annual Report and Financial Statements
   The development and publication of the Annual Report by Queensland local governments is a
   requirement under the Local Government Regulation 2012 (“the Regulation”).
   The purpose of the Annual Report is to inform the community about Council’s activities and
   financial performance throughout the 2020/21 financial year.
   The Regulation prescribes a range of disclosures which must be included within the report
   relating primarily to accountability matters, financial matters (which may be of interest to the
   community in terms of the amounts spent and justification of expenditure) and Council’s
   progress towards achieving its Corporate Plan objectives.
   The Annual Report has been compiled in accordance with the Annual Report Compliance
   Checklist (Checklist) provided by the State Department of Local Government, Racing and
   Multicultural Affairs to ensure that all of the prescribed disclosures under the Regulation are
   included in the document.
   Council’s Financial Statements, which were signed by a delegate of the Auditor General
   Queensland on 28 October 2021, and in accordance with the Auditor General Act 2009,
   confirm:
         The prescribed requirements in relation to the establishment and keeping of accounts
          have been complied with in all material respects;
         The Financial Report:
          (a)   Gives a true and fair view of the Council’s financial position as at 30 June 2021,

                                                                                  Page 56 of 58

Section 57

GENERAL COMMITTEE MEETING AGENDA                                            15 NOVEMBER 2021


                and of its financial performance and cash flows for the year then ended; and
          (b)   Complies with the Local Government Act 2009, the Local Government Regulation
                2012 and Australian Accounting Standards.
   The Community Financial Report (provided from page 62 of the Annual Report) has been
   prepared by Council’s Financial Services Branch and provides readers with an easy to follow
   summary and analysis of Council’s financial position for the 2020/21 financial year.
   4.     Publication Requirements
   Pursuant to section 182 of the Regulation, a local government must:
   a)     Adopt its annual report within one month after the day the Auditor-General gives the
          Auditor General’s audit report about the local government’s financial statements for the
          financial year to the local government; and,
   b)     Publish its annual report on its website within two weeks of adopting the annual report.

   Previous Council Consideration
   Nil.

   Finance
   Graphic design for the Annual Report was outsourced to a local supplier and cost Council
   $1,320 (including GST).

   Risks & Opportunities
   The Annual Report forms part of Council’s commitment to delivering transparency to the
   community and legislative compliance. Failing to ensure the accuracy of the prescribed
   disclosures exposes Council to a risk of legislative non-compliance and reputational damage.
   Human Rights Compatibility Statement
   In developing this Annual Report, the subject matter has been considered in accordance with
   the requirements of the Queensland Human Rights Act 2019. It is considered that the subject
   matter does not conflict with any human rights and supports a human rights approach to
   decision making by Council.
   Council representatives will endeavour to act and make decisions under this Report in a
   manner that is compatible with human rights. In particular, representatives will endeavour to:
         identify relevant human rights which may be affected by the action or decision;
         give proper consideration to the impact of its actions and decisions on human rights; and
         ensure that any conduct or decision by Council which limits an individual’s human rights
          is reasonable and justifiable.
   This Report should be read in conjunction with Council’s Human Rights Policy.

   Consultation
   External Consultation - Community & Stakeholder
   The draft Noosa Council 2020-21 Annual Report was presented to Council’s Audit and Risk
   Committee on 20 October 2021 and has been reviewed by the Queensland Audit Office.
   Internal Consultation
   The development of the Annual Report is the end product of extensive internal consultation in
   terms of collecting, verifying and preparing the information contained within it with various
   teams.


                                                                                  Page 57 of 58

Section 58

GENERAL COMMITTEE MEETING AGENDA                                                  15 NOVEMBER 2021


     Departments/Sections Consulted:

      X     Chief Executive Officer   X   Community Services                      X   Corporate Services
            Executive Support             Director                                    Director
                                          Community Development                       Financial Services
                                          Community Facilities                        Fleet
                                          Libraries & Galleries                       ICT
                                          Local Laws                                  Procurement
                                          Waste & Environmental Health                Property
                                                                                      Revenue Services

      X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
            Director                      Director                                    Director
            Community Engagement          Building & Plumbing Services                Asset Management
            Customer Service              Development Assessment                      Buildings and Facilities
            Governance                    Economic Development                        Civil Operations
            People and Culture            Environmental Services                      Disaster Management
                                          Strategic Land Use Planning                 Infrastructure Planning,
                                                                                      Design and Delivery




7.   CLOSED SESSION

     Nil.




                                                                                         Page 58 of 58

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.