OPW22-0104.02 Approved Plans

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                  LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            GENERAL NOTES
                                                   EXISTING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            1. NO OTHER SERVICES TO ENCROACH INTO THE STANDARD
                                                OVERHEAD CABLE                                                                                                                                                                                                                                                                                                                                                                                                                                                                 UNDERGROUND ELECTRICITY CORRIDOR OF 0mm - 900mm FROM RPA.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            2. ALL CABLES TO BE INSTALLED IN CONDUIT WITHIN THE STANDARD
                                                  PROPOSED                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ELECTRICITY ALIGNMENT ALLOCATED BY THE LOCAL COUNCIL. WHERE
                                                OVERHEAD CABLE                                                                                                                                                                                                                                                                                                                                                                                                                                                                 CONDUITS VARY FROM THIS AND AT FOOTPATH CROSSING PROTECTIVE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               STRIP IS TO BE INSTALLED. WHERE PRACTICAL ELECTRICITY CABLES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SHALL NOT BE CLOSER THAN 250mm TO THE REAL PROPERTY
                                                   EXISTING
                                                 UNDERGROUND                                                                                                                                                                                                                                                                                                                                                                                                                                                                   BOUNDARY.
                                                    CABLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            3. A, B OR C WHEN SHOWN BESIDE LV PILLARS DENOTES SERVICE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               PHASING.


                                                                                                                                                                                              25 PAVILION STREET, POMONA
                                                   PROPOSED
                                                 UNDERGROUND
                                                     CABLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            4. THE CONTRACTOR SHALL MEASURE ACTUAL CABLE LENGTHS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               REQUIRED ON SITE AFTER INSTALLATION OF CONDUITS THEN NOTIFY
                                                       E                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ENERGEX/SUPPLIER WHEN CONFIRMING CABLE ORDER.
                                                   PROPOSED
                                                  ELECTRICAL                                                                                                                                                                                                                                                                                                                                                                                                                                                                5. ALL BENDS INSTALLED ON 80mm,100mm AND 125mm RETICULATION
                                                SERVICE CONDUIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CONDUITS MUST BE 1830mm RADIUS UNLESS OTHERWISE SPECIFIED.
                                                         ET
                                                   PROPOSED
                                                  ELECTRICAL &
                                                                                NOOSA COUNCIL                                                                                                                                                                                                                                                                                                                                                                                                                               6. CONTRACTOR TO SUPPLY ALL LABELS AND SITE ID NUMBERS TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ENERGEX SPECIFICATION.
                                                 COMMUNICATION
                                                SERVICE CONDUITS                APPROVED PLAN                                                                                                                                                                                                                                                                                                                                                                                                                               7. WHEN CROSS ROAD CONDUIT FINISHES OPPOSITE A TRUNCATION PEG,
                                                                              OPW22/0104 3 JUN 2022                                                                                                                                                                                                                                                                                                                TREE STREET                                                                                                 PROPERTY SIDE OF TRENCH TO BE 300mm ALIGNMENT FROM PEG.

                                                     POLE                                                                                                                                                                                                                                                                                                                                                                                                                                                                   8. WHERE CROSS-ROAD ELECTRICITY CONDUITS RUN PARALLEL TO
                                                 TRANSFORMER                                                                                                                                                                                                                                                                                                                                                                                                                                                                   OTHER SERVICES OR CONDUITS, A MINIMUM SEPARATION OF 1.0m MUST
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BE MAINTAINED.

                                                   PADMOUNT                                                                                                                                                                                                                                                                                                                                                                                                                                                                 9. CIVIL CONTRACTOR TO INSTALL ALL CROSS ROAD CONDUITS.
                                                 TRANSFORMER
                                                                                                                                                                                                                                                                                                                                                        9                                                                                                                                                                   10. CO-ORDINATE CONDUIT INSTALLATION WITH COMMUNICATIONS
                                                                                                                                                                                                                                                                                                   7                        8                                                                                                                                                                                                   CARRIER CONTRACTORS.




                                                                                                                                                                                                                                                                                                                                                                                                 PAVILION STREET
                                                                                                                                                                                                                                                                6
                                                                                                                                                                                                                                                600
                                                      HV POLE                                                                                                                                                                                                                                                                                                                                                                                                                                                               11. ELECTRICITY PILLARS TO HAVE 600mm EXCLUSION ZONE. NO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                NON-ENERGEX ASSETS TO BE INSTALLED WITHIN THIS EXCLUSION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ZONE.
                                                   HV / LV POLE
                                                                                                                                                                                                                                                                                        HANSEN PLACE                                                                                                                                                                                                                        12. ENERGEX REQUIRE 1.0m CLEARANCE BETWEEN SERVICE PILLARS AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                DRIVEWAYS. IF LESS THAN 1.0m SEPARATION THEN PROTECTIVE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                BOLLARDS MUST BE INSTALLED.
                                                      LV POLE

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            CONSTRUCTION CONTRACTOR
                                                                                                                                                                                                                                                                                                                                                 1
                                                HV UNDERGROUND                                                                                                                                                                   10                                 5                  4                 3                   2                                                                                                                                                                                              THE CONTRACTOR SHALL BE RATED BY ENERGEX FOR THE FOLLOWING
                                                POLE TERMINATION                                                                                                                                                                                                                                                                                                                                                                                                                                                            PROCESS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             WCS 2 - UNDERGROUND CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             WCS 31 - COMMISSIONING AND OPERATION OF THE NETWORK
                                                LV UNDERGROUND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             WCS 34 - EARTHING SYSTEMS
                                                POLE TERMINATION                                                                                                                                                                                                                                                                                                                                                                                                                                                             WCS 61 - UNDERGROUND CIVIL CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                                                                                                   SANDY STREET                                                                                             STANDARDS AND SPECIFICATIONS
                                                   AERIAL STAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            THIS WORKS PLAN IS TO BE READ IN CONJUNCTION AND COMPLY WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            FOLLOWING ENERGEX MANUALS AND SPECIFICATIONS
                                                  GROUND STAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            · UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            · WCS 61.1 - UNDERGROUND TRENCHLESS TECHNOLOGY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            · NETWORK LABELLING AND SIGNAGE MANUAL
                                                       EARTH
                                                                                                                                                                                                                                                   LOCALITY PLAN
                                                                                                                                                                                                                                                            NOT TO SCALE                                                                                                                                                                                                                                                    CONSUMER'S INSTALLATION SHALL COMPLY WITH AS/NZS 3000:2018 - SAA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            WIRING RULES.

                                                 EXISTING PILLAR                                                                                                                                                                                                                                                                                                                                                                                                                                                            FOR DETAILS OF TRENCH CROSS-SECTIONS, REFER TO ENERGEX
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            UNDERGROUND DISTRIBUTION CONSTRUCTION MANUAL.
                                                                                                                                                                         STREETLIGHTING CERTIFICATION                                                                               CERTIFICATE OF COMPLIANCE
                                                PROPOSED PILLAR
                                                                                                                                                                This lighting design is certified to comply generally with the nominated categories
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ON SITE SERVICES CHECKS
                                                                                                                                                                                                                                                                        DESIGN DOCUMENTATION IN ACCORDANCE WITH THE REQUIREMENTS OF:
                                                                                                                                                                of AS/NZS 1158.3.1:2020 (P Category) for luminaires supplied on the following                                                                                                                                                                                                                                                                               UNDERGROUND SERVICES SHOWN ON THIS WORKS PLAN IN THE VICINITY
                                                                                                                                                                                                                                                                        APPLICABLE STANDARD :                AS/NZS 1158.3.1:2020                                                                                                                                                                                           OF PROPOSED EXCAVATION WORKS HAVE BEEN TAKEN FROM ASSET
                                                     LINK PILLAR                                                                                                roads within this design :                                                                                                                                                                                                                                                                                                                                  OWNER'S PAPER RECORDS AND ARE INDICATIVE ONLY.
                                                                                                                                                                                                                                                                        CALCULATION SOFTWARE :               PERFECT LITE v5.06
                                                              240LV
                                                 D
                                                                                                                                                                HANSEN PLACE                                                                            PR6                                             Lighting Category                                                                                                                                                                                                   THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF DAMAGE TO ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            EXISTING UNDERGROUND ASSETS CAUSED BY HIS WORKS AND THE
                                                 CONDUIT / CABLE                                                                                                                                                                                                                                             HANSEN PLACE
                                                 CROSS-SECTION                                                                                                                                                                                                          Road Name(s)                                                                                                                                                                                                                                        RE-ESTABLISHMENT OF ANY SURVEY MARKS DISLODGED.
                                                          X                                                                                                                                                                                                                                                                                                                                                                                                                                                                 THE CONTRACTOR SHALL REQUEST ON-SITE IDENTIFICATION AND
                                                                                                                                                                                                                                                                        Nominated Category                                            PR6                                                                                                                                                                                   LOCATION OF EXISTING BURIED SERVICES FROM THE QUEENSLAND DIAL
                                                  WATER METER                                                                                                   With the following exceptions:
                                                                                                                                                                UWLR exceeds 1% for modular LEDs (2.8%)
                                                                                                                                                                                                                                                                        Road Surface Reflection                                        N/A                                                                            PILLARS / PITS ON ZERO LOT BOUNDARIES                                                                 BEFORE YOU DIG SERVICE - PHONE: 1100 WEB: www.1100.com.au (A MINIMUM
                                                                                                                                                                                                                                                                        Road Reserve Width                                            15m                                                                                                                                                                                   OF TWO DAYS NOTICE IS REQUIRED)
                                                   PROPOSED                                                                                                                                                                                                                                                                                                                                                                           1.0m
                                                DRIVEWAY ENTRY                                                                                                                                                                                                          Mounting Height                                               5.1m                                                                                                                                                                                  SEWERAGE, STORMWATER, GAS AND WATER PLANS FOR THE SITE MAY BE
                                                                                                                                                                Maintenance Factor:                                                                                     Overhang/Offset Distance                                     3.90m                                                                                                                                                                                  OBTAINED ON REQUEST FROM THE PROJECT SERVICE SUPERVISOR.
                                                 PROPOSED ZERO                                                                                                  This lighting design uses the following maintenance factor(s):                                          Lighting Arrangement                                      Single Sided
                                                  LOT IDENTIFIER
                                                                                                                                                                Maintenance Factor Calculated : 0.75                                                                    Pole Setback                                               0.7m NFK                                                                                                                                                                                 REINSTATEMENT NOTES




                                                                                                                                                                                                                                                                                                                                                                                                                                                               driveway
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Back of K
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      erb




                                                                                                                                                                                                                                                                                                                                                                                                                                                               Future
                                                                                                                                                                                                                                                                        Upcast Angle                                                   0°                                                                                       0.6m                     1m                      Pillar 1.0m
                                                 LIGHTING                                                                                                       These maintenance factor(s) are based on the following nominal maintenance                                                                                                                                                                                                                                       clear of driveway                          · BACKFILL & REINSTATEMENT OF FOOTPATH AND ROADWAY TO COUNCIL
                                                                                                                                                                                                                                                                                                        Luminaire Details
                                                                                                                                                                                                                                                                                                                                                                                                                                     PIT-ID

                                                  LEGEND                                                                                                                                                                                                                                                                                                                                                                              5                                                                                        REQUIREMENTS. REFER STANDARD DRAWINGS:
                                                                                                                                                                regime:                                                                                                 Lamp Type / Wattage                                            L17
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Electricity
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              supply co
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          rridor              ··    RS-065 - PATHWAYS CONCRETE PATHWAY CONSTRUCTION
                                                 NOTE: NOT ALL                                                                                                                                                                                                                                                                                                                                                                                                                            RP BOU
                                                                                                                                                                · Lamp replacement (for non-LED luminaires) at 36 month intervals.                                                                                                                                                                                  Exclusion                                                                        NDARY                          DETAILS




                                                                                                                                                                                                                                                                                                                                                                                                                                                  DARY
                                                SYMBOLS MAY BE                                                                                                                                                                                                          Luminaire Identification                         Modular LED 15W 4K 170326PHM                                                               Zone
                                                    USED                                                                                                                                                                                                                                                                                                                                                                                                                   0.75 / 0.9
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        0m                                    ··    8 - 00398 - PATHWAY DETAILS AND SECTIONS
                                                                                                                                                                · Cleaning, inspection and maintenance of all luminaires at 36 month intervals




                                                                                                                                                                                                                                                                                                                                                                                                                                                T BOUN
                                                                                                                                                                                                                                                                        Lamp Flux (lumens)                                          1899 lms                                                                        Side of the                                                                                               ··    8 - 00399 - CONCRETE FOOTPATH FULL WIDTH
                                                                                                                                                                                                                                                                                                                                                                                                                    pillar aligned
                                                                                                                                                                · Service availability maintained at not less than 95%.                                                 I-table Identifier                                       170326PHM.CIE




                                                                                                                                                                                                                                                                                                                                                                                                                                              ZERO LO
                                                                                                                                                                                                                                                                                                                                                                                                                    with the
                                                                                                                                                                                                                                                                        Lighting Tariff                                              RATE 2                                                                         boundary
                                                     LED STREET                                                                                                 · Vegetation kept clear of luminaires.
                                                        LIGHT

                                                                                                                                                                If the asset owner elects not to adopt this maintenance regime, they shall develop
                                                                                                                                                                                                                                                                        Power Factor
                                                                                                                                                                                                                                                                        Start/run Currents
                                                                                                                                                                                                                                                                                                                                   HPF (≥ 0.9)
                                                                                                                                                                                                                                                                                                                                   0.08 / 0.08A
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          House on the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          boundary                                                            DEVELOPERS NOTES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         1.    DO NOT CONSTRUCT DRIVEWAYS /
                                                 S100 HPS STREET                                                                                                an inspection and maintenance regime such that the overall lighting installation                        Ip Rating                                                     IP66
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CROSSOVERS UNTIL ELECTRICAL
                                                      LIGHT
                                                                                                                                                                operates in accordance with this design.                                                                                               Spacing Calculations                                                                                                                                                                                                                    WORKS HAVE BEEN COMPLETED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         Proposed House
                                                                                                                                                                                                                                                                        Average Horizontal Illuminance         (E h)                    ≥ 0.7 lx
                                                 S150 HPS STREET                                                                                                                                                                                                        Min Point Horizontal Illuminance       (E Ph )                  ≥ 0.07 lx
                                                      LIGHT                                                                                                                                                                                                             Illuminance Uniformity                 (U E2)                     ≤ 10                                                                                                                   N.T.S
                                                                                                                                                                                                                                                                        Upward Wasted Light Ratio (UWLR) %                                2.8%                                                                            REQUIREMENTS FOR ELECTRICAL, GAS &
                                                 S250 HPS STREET
                                                                                                                                                                                                                                                                        Road Reserve Lighting Design Width (m)                    Maximum Spacing (m)                                                                             COMMUNICATIONS                                                                                      COUNCIL REQUIRE 1.0m CLEARANCE BETWEEN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ELECTRICAL PILLARS AND WATER METERS. INSTALL
                                                      LIGHT                                                                                                                                                                                                                                     15                                        73.0
                                                                                                                                                                                                                                                                                                                                                                                     Fire Ant                           The proposed pillar shall be offset at the zero lot                                                        WATER METERS MINIMUM 1.5m FROM BOUNDARY PEG




                                                                                                                                                                                                                                                                                                                                                                                                Biosecurity
                                                                                                                                                                                                                                                                                                                                                                                                                        boundary with the side of the pillar being aligned
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   WHERE WATER METERS SHARE A COMMON BOUNDARY




                                                                                                                                                                                                                                                                                                                                                                           Caution
                                                EXISTING UNKNOWN                                                                                                                                                                                                                                                                                                                                                        with the lot boundary in order to provide a 1.0m
                                                   STREET LIGHT                                                                                                                                                                                                                                                                                                                                                         minimum clearance from the future driveway.                                                                           WITH ELECTRICAL PILLARS.

                                                                                                                                                                                                                                                                                                                                                                                                                        A proposed streetlight shall be offset 1.0m from
          FILE: P:\221308\01 WORKING\A221308A




                                                                                                                                                                                                                                                                                                                                                                                                                        the boundary peg to centre of pole.

                                                                                                                                                                                                                                                                                                                                                                                 Zone                                  COMMUNICATIONS PITS                                 GAS SERVICE TEE-OFFS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              FOR APPROVALS
                                                                                                                                                                                                                                                                                                                                                                                                                       are to remain outside 600mm                         are to remain outside 600mm                                          (NOT FOR CONSTRUCTION)
                                                                                                                                                                                                                                                                               TO BE BUILT IN CONJUNCTION WITH                                                                 For Info                                pillar exclusion zone
                                                                                                                                                                                                                                                                                                                                                                                                                       shall not clash with future
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           pillar exclusion zone where a
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           pillar is offset to align on one

                                                                                                                                                                                                                                                                           TELECOMMUNICATIONS CABLE PROVISIONING                                                             Call 13 25 23                             driveways                                           side with the boundary peg                                              26/05/2022 1:50 PM


                                                                                                                                                                                                                                                                                                                             S2602185
                                                   This document is                                                                             CLIENT                                               SITE CONTACT DETAILS                                 ALIGNMENTS                 PROJECT /                                                                                                                                                                CERTIFICATION:                                                PROJECT

                                                    the property of                                                                                                                             NAME                                              ENERGEX OH            3.0 RP       SUB PROJECT NO.                                                                                                                                                          APPROVED:                                                               10 LOT RESIDENTIAL SUBDIVISION
                                                                                                                                                                                                                                                                                                                                                                                                                                                              RPEQ No:
                                                    Ampflo Pty Ltd                                                                                                                               NOEL SHIPP                                       ENERGEX UG            0-0.90       PARENT PROJECT NO.            -                                                                                                                                          DATE:                                                                     25 PAVILION STREET, POMONA
                                                   and may only be                                                                                                                              COMPANY                                           TELSTRA               2.1-3.0      WORK REQUEST NO.              -                                                                                                                                                                                                                     LOCALITY PLAN, NOTES, LEGEND &
          PLOT: 26/05/2022 1:50:08 PM




                                                      used for the                                                                                                                                                                                                                                                                                                                       ABN 28 111 423 842
                                                      purpose for                                                                                        JNE DEVELOPMENTS                        JNE DEVELOPMENTS PTY. LTD.                       GAS                    N/A         PLANNER & PHONE               SUBDIVISIONS
                                                                                                                                                                                                                                                                                                                                                                          Electrical and Telecommunications
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           STREETLIGHTING COMPLIANCE
                                                      which it was                                                                                                                              PHONE                                             HP GAS                 N/A         LOTS                          1 - 10 + 600                                                          Consultants                                                          CHECKED:
                                                    commissioned.                                                                                                                               MOBILE      0421572866                            WATER                 0.9-2.1      CANCELLING LOTS               21 ON SP316902                           ISO 9 0 0 1
                                                                                                                                                                                                                                                                                                                                                                                   Phone : (07) 3372 9280                                                                                                                                                                                   ISSUE
                                                                                                                                                                                                                                                                                                                                                            CERTIFIED                                                                                         DESIGNER:            S.LYNSKEY                                DRAWING: 221308

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            A
                                                     Unauthorised        A    10/05/2022 PRELIMINARY ISSUE              SL                                                                      EMAIL       [email protected]     STORMWATER             N/A         LOCAL AUTHORITY               NOOSA SHIRE COUNCIL                                          Email : [email protected]
                                                                                                                                                                                                                                                                                                                                                            Q U A L I T Y
                                                   use is prohibited.   REV    DATE                          DETAILS   DRAWN   CHECKED APPRVD                                                                                                     SEWERAGE              0.9-2.1      PEGGED?                       ON REQUEST                               MANAGEMENT
                                                                                                                                                                                                                                                                                                                                                                                   Website : ampflo.com.au                                                    ISSUE DATE: 10/05/2022                                        PROJECT: A221308              SHEET    1 OF 3


Document Set ID: 21956275
Version: 1, Version Date: 08/06/2022
Log in to download the original file

OPW22-0104.02 Approved Plans.pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.