Original source · versioned page text
OPW22-0104.02 Approved Plans
Original PDF page 10, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnION
S
20SP316902
1
C
OVE
HV UNDERGROUND 2
10 5 4 3
NAN
POLE TERMINATION
S
RM
T
#30
S
W
LV UNDERGROUND 2RP41493
POLE TERMINATION
1 - 95 ABCRM4C (LV)
3 - 7/4.75 (11kV)
S
W41
AERIAL STAY
S S
S
GROUND STAY
#19
4RP35077
SANDY STREET
C/DLL3
LL3
EARTH
C/D
1 - 95 ABC 4C(LV)
S
SP15411-
SP15411-
10 0 10 20 30 40 50 METRES M50 P7868 3 - 7/4.75(11kV)
13
EXISTING PILLAR ) 46
SP15411 SP15411 P7869 1 - 19/2.00(STAY
S
200kVA SCALE 1:500 (BEFORE REDUCTION) 200kVA
S
1 - 95 ABC 4C(LV)
3 - 7/4.75(11kV)
PROPOSED PILLAR
4C(LV)
4C(LV)
P7874 P7874
45
1 - 95 ABC
1 - 95 ABC
S
LINK PILLAR KYLIE CO #28
URT KYLIE CO
C/DLL2
S
240LV
SP15411-
URT 30RP35076
SP15411-
SP15411-
D C/DLL2 C/DLL2
120mm² X
LPE (LV)
U5736 120mm² X U5736
CONDUIT / CABLE X24301 LPE (LV)
X24301 RECOVER DS2 SWITCH
PAVILION ST
7
CROSS-SECTION 7
(OPEN)
X
4C(LV)
4C(LV)
C/DLL2
WATER METER
SP1420034/TR1 P7873 1C SP1420034/TR1
1C
1 - 95 ABC
1 - 95 ABC
SP15411-
PROPOSED P7892 P7892
DRIVEWAY ENTRY 1 1
P7872
P7872 (OPEN)
4 - 7/3.75
4 - 7/3.75
PROPOSED ZERO 4 - 7/3.75(L TREE STR TREE STR
LOT IDENTIFIER V) EET 4 - 7/3.75(L
V) EET
(LV)
SP282-D/D
(LV)
SP282-D/D
L1 1 - 95 ABC 4C(LV) 6 L1
U12533471 HANSEN 1 - 95 ABC 4C(LV)
LIGHTING PLACE
STREET
P76827 P76827
LEGEND P190822 U12533467 P190822
4C (LV)
4C (LV)
L1
U12533469
L1
NOTE: NOT ALL
SP282-D/D
SP282-D/D
1 - 95 ABC
SUMMI
1 - 95 ABC
SUMMI
SYMBOLS MAY BE
4 U12533464
PAVILION
USED 5
2
SP282-D
SP282-D
4 - 7/3.7
4 - 7/3.7
STREET
T ROAD
T ROAD
/D
/DL1
5(LV)
LED STREET
5(LV)
L1
LIGHT SWITCHING & COMMISSIONING PLAN - LV
SP282 SP282
200kVA 200kVA (subject to site conditions, amendments by switching co-ordinator and approval by
P7868 SANDY S P7868 SANDY S
PAVILION
S100 HPS STREET
4 - 7/4.75
(LV)
P7881 TREET 4 - 7/4.75
(LV)
P7881 T REET LV outage co-ordinator)
LIGHT 1 - 95 ABC
4C(LV) 1 - 95 ABC 4C
(LV)
SWITCHING
4C(LV)
4C(LV)
4 - 7/4.75 4 - 7/4.75 1. INSTALL NEW LV NETWORK AS PER PLAN
L1
(LV)
L1
(LV)
SP282-D/D
SP282-D/D
SP282-D/D
L1 SP282-D/D
1 - 95 ABC
L1
1 - 95 ABC
2. BREAK BRIDGES AT X24301 STN 7 - PAVILION STREET
AD
S150 HPS STREET
P7886 P7886 AD
REET
REET
LIGHT
) R O R O 3. RECOVER EXISTING DS2 SWITCH AT X24301 STN 7 - PAVILION STREE
IT
)
LV T
MI
C( LV
C(
4
M 4 4. INSTALL NEW OPEN DS2 SWITCH AT P7872 STN 1 - PAVILION STREET
CANE ST
CANE ST
C
UM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.