4 - Haul Route Response - B14101TL001
25 May, 2015
Our File Ref: B14101TL001
Contact: Steve Williams
Gantt Legal
by email: [email protected]
Attention: Cliff Wirz
RE: MILLIGAN FARMS
RESPONSE TO COUNCIL - TRAFFIC & TRANSPORT ELEMENTS
Further to our recent discussion we have undertaken further investigations in relation to
the proposed ultimate form for Top Forestry Road. We note that this work has been
undertaken on the basis of providing an upgrade proposal that will address the issues
raised by the Council at our meeting to discuss the project and their subsequent
confirmation of the items that required consideration. The intent of this is to provide
Council with sufficient detail to allow an Infrastructure Agreement to be established to
cover the external road works required by the Council. Any such upgrade would be
subject further detailed design and further approval processes through Council.
1. Top Forestry Road
Road Upgrade Proposal
It is important to note that we maintain our current position with respect to the traffic and
transport elements of this road as outlined in our report dated 31 July, 2014. This report
was based on our detailed assessment of the proposal in terms of potential traffic
engineering impacts. This included detailed traffic count data collection to establish the
current level of vehicle activity and a detailed assessment of the possible operational
scenario associated with the proposed use.
Subsequently, conceptual design plans were submitted, aimed at addressing concerns
raised by the Council. However following our subsequent meeting with Council officers,
where specifics of Councils preferred design requirements were outlined, our client has
instructed us to consider those specific issues identified and prepare a design concept
that dealt with them. Despite our position in this regard, it is our understanding that our
client is prepared to accept that these design concepts, developed to accommodate
Councils preferred arrangement, would form part of an Infrastructure Agreement that
would form part of a development approval.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 4 pages
Page 2
25 May, 2015 -2-
Our File Ref: B14101TL001
Contact: Steve Williams
We have prepared an updated set of Concept Drawings and attach these are for
inclusion in the approval package and Infrastructure Agreement. The relevant plans are
as noted below.
• B14101-SK-004 (Rev B)
• B14101-SK-005 (Rev C)
• B14101-SK-006 (Rev A)
• B14101-SK-007 (Rev A)
In preparing these final drawings we have, on behalf of our client, undertaken significant
additional work and the including the following items. Note that the concepts have been
undertaken to a level of detail more than would typically be provided at DA Stage,
however remain subject to further detailed design:
• We have altered the general concept design to provide a 6.0m wide sealed
pavement as discussed and agreed during our meeting with Council;
• This is increased to a minimum of 7.0m at the major bend in the road at around
chainage 1100m through 1200m (Ch0 starting at Old Ceylon Road) as discussed
and agreed with Council;
• Table drains have been provided in accordance with the Council required
maximum grades of 1m in 4m;
• Additional survey has been collected in the vicinity of the bend mentioned above
to allow the concept to tie in with the existing ground levels;
• We have commissioned a detailed Geotechnical Investigation which has
assessed both the existing pavement composition (including underlying
pavement strength) and also undertaken a slope stability assessment for the
aforementioned curve widening;
• The concept design has taken into consideration the findings of the geotechnical
investigations in relation to the slope design concept; and
• We have had our Senior Ecologist undertake an initial assessment of the corridor
with a particular focus on the aforementioned curve widening area.
We believe that the Concept Design as represented in these plans adequately and
comprehensively addresses the issues raised by Council and should provide Council
with the comfort that their preferred road upgrade is able to be built. The plans provided
show property boundaries and overhead power lines in the critical location.
We note that it is accepted that the road upgrade would require provision of appropriate
road signage and guide posts generally as outlined in the Hayes Traffic Engineering
report submitted as part of the initial application and could be conditioned accordingly.
This will include additional hazard markers adjacent to existing cross drainage
structures. The provision of signage and line-marking would be in accordance with
relevant Council standards and the MUTCD where relevant.
Page 3
25 May, 2015 -3- Our File Ref: B14101TL001 Contact: Steve Williams Pavement Design Concept We note that the Concept Design as now represented in the plans has been based on Councils requirement to provide a pavement design in accordance with the Councils Planning Scheme Policy 5 Section 3.19 with the minimum overall pavement depth of 200mm. We note that initial plans included a pavement design that had been based on detailed analysis undertaken from first principles. As part of the pavement design process we had initially adopted the following key parameters: • Design Life - 20 year • Design Vehicle Loadings (ESA’s) - 7.69 x 104 • Design Subgrade CBR - 15% The result of our detailed CIRCLY analysis and design resulted in an overall pavement depth of 160mm. We attach the previous detailed CIRCLY analysis for reference. The design vehicle loading were calculated based on the existing vehicle movements along Top Forestry Road (based on count data collected as part of our assessment) with the “worst case” design traffic added to this existing background traffic. Furthermore, we note that at the time of completing the pavement design we did not have access to the results of the detailed geotechnical assessment. Subsequently the Geotechnical investigation has been undertaken and found a subgrade CBR of 11 for the underlying subgrade material below the existing pavement. We note that the intent of the design concept is to effectively “build up” the road and make use of the existing pavement. The geotechnical report has identified that taking this approach and based on limited excavation of the existing road formation the design CBR could be as high as CBR20. As previously noted however, in the interests of working with Council to achieve their preferred outcome, we note that that our client has accepted the requirement to provide a minimum pavement depth for rural roads as outlined in PSP5 of 200mm. We note that we have also assumed a bitumen seal along the length of Top Forestry Road. We have done a further detailed analysis of the pavement based on the Council pavement depth requirements with subgrade CBR values of 10 and 12 to demonstrate the adequacy of the pavement design and attach these for reference. Ecology Impacts This is addressed under a separate letter appended to this correspondence. The primary finding is that while the upgrade will necessitate the removal of some large trees this is not expected to result in any substantial loss of habitat. It is noted that following direct discussions with Council Manager Planning & Environment it was clear that a full and comprehensive “tree identification” survey was not required at this point and Council was after a more general assessment to identify any potentially significant issues that may arise that would be a major barrier to any upgrade of the corridor.
Page 4
25 May, 2015 -4-
Our File Ref: B14101TL001
Contact: Steve Williams
We believe that the correspondence attached is adequate and appropriate at this stage.
As part of the detailed design process we could provide a more detailed tree
identification survey if this were considered appropriate and work with Council with
respect to any replacement planting.
2. Alternate Access Route
The current access route for the vehicles associated with the proposal would result in
vehicles travelling to/from the Bruce Highway via Top Forestry Road, Old Ceylon Road,
Cooroy-Belli Creek Road, Maple Street, Crystal Street and Myal Street as represented
by Figure 3-1 of our initial traffic assessment report (see attached Figure 3-1).
As requested by Council we have considered the potential for an alternate access route
to/from the site. The two options contemplated include:
• travelling to/from the Bruce Highway via Top Forestry Road, Old Ceylon Road,
Cooroy-Belli Creek Road (through Ridgewood), Skyring Creek Road and
Eumundi-Kenilworth Road; and
• travelling to/from the Bruce Highway via Top Forestry Road, Old Ceylon Road,
and Eumundi-Kenilworth Road; and
The initial alternate route noted above would result in additional 19km of travel which
over the life of the project would be completely unviable. From a strictly traffic
engineering perspective this would result in significant additional travel costs and
distance travelled on the local road network by heavy vehicles associated with the
proposal prior to gaining access to the higher order road network. This alternative would
require the vehicles to travel via Cooroy-Belli Creek Road through Ridgewood which
includes a section of sealed one-lane road which, based on Councils position with
respect to Top Forestry Road, is likely to result in additional upgrades being required by
Council. This route has a number of relatively winding sections of road and some
grades that are not encountered on the preferred route via Cooroy. This route is not
considered to represent a viable and importantly reasonable alternative.
The second route would be similar in distance to the preferred route. However this
alternate route, involving initially travelling south on Old Ceylon Road from Top Forestry
Road rather than initially heading north through to Cooroy-Belli Creek Road, would result
in vehicles associated with the use needing to traverse a number of narrow section of
road including one lane/two way sealed sections of road and additional unsealed road
sections of a lesser standard than the existing form of Top Forestry Road. As noted
above, based on Councils position with respect to Top Forestry Road, it is then likely that
this alternate route would result in additional upgrades being required by Council. This
route is not considered to represent a viable and importantly reasonable alternative.
Importantly the travel route previously identified and as preferred by our client is on our
view the most appropriate route from a traffic engineering perspective. Further we are of
the understanding that issues associated with noise have been addressed as part of the
noise reports prepared by others.
Page 5
25 May, 2015 -5-
Our File Ref: B14101TL001
Contact: Steve Williams
We believe that the proposed vehicle travel route associated with the proposal utilising
short section of roads through Cooroy, namely Maple Street and Crystal Street, is
acceptable from a traffic engineering perspective and is considered to be the most
appropriate route for the subject development.
Yours faithfully
For and on behalf of
LAMBERT & REHBEIN (SEQ) PTY LTD
S.A. WILLIAMS BE(Civil), MIEAust RPEQ
DIRECTOR
TRANSPORT & INFRASTRUCTURE
Enc: Top Forestry Road Concept Design Plans
Geotechnical Investigation Report - Red Earth Engineering (dated April 2015)
Ecological Advice - L&R Letter (dated 14/05/2015)
Pavement Design Profile - Circly Outputs