Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

4 - Haul Route Response - B14101TL001

of 5

Page text shows just the words. Original shows the document exactly as it was published.

25 May, 2015
Our File Ref: B14101TL001
Contact: Steve Williams




Gantt Legal
by email: [email protected]

Attention: Cliff Wirz


RE:        MILLIGAN FARMS
           RESPONSE TO COUNCIL - TRAFFIC & TRANSPORT ELEMENTS

Further to our recent discussion we have undertaken further investigations in relation to
the proposed ultimate form for Top Forestry Road. We note that this work has been
undertaken on the basis of providing an upgrade proposal that will address the issues
raised by the Council at our meeting to discuss the project and their subsequent
confirmation of the items that required consideration. The intent of this is to provide
Council with sufficient detail to allow an Infrastructure Agreement to be established to
cover the external road works required by the Council. Any such upgrade would be
subject further detailed design and further approval processes through Council.


1.     Top Forestry Road

Road Upgrade Proposal

It is important to note that we maintain our current position with respect to the traffic and
transport elements of this road as outlined in our report dated 31 July, 2014. This report
was based on our detailed assessment of the proposal in terms of potential traffic
engineering impacts. This included detailed traffic count data collection to establish the
current level of vehicle activity and a detailed assessment of the possible operational
scenario associated with the proposed use.

Subsequently, conceptual design plans were submitted, aimed at addressing concerns
raised by the Council. However following our subsequent meeting with Council officers,
where specifics of Councils preferred design requirements were outlined, our client has
instructed us to consider those specific issues identified and prepare a design concept
that dealt with them. Despite our position in this regard, it is our understanding that our
client is prepared to accept that these design concepts, developed to accommodate
Councils preferred arrangement, would form part of an Infrastructure Agreement that
would form part of a development approval.
Log in to download the original file

4 - HAUL ROUTE RESPONSE - B14101TL001.pdf · 107 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.