Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

4 - Haul Route Response - B14101TL001

of 5

Page text shows just the words. Original shows the document exactly as it was published.

25 May, 2015                                      -5-
Our File Ref: B14101TL001
Contact: Steve Williams




We believe that the proposed vehicle travel route associated with the proposal utilising
short section of roads through Cooroy, namely Maple Street and Crystal Street, is
acceptable from a traffic engineering perspective and is considered to be the most
appropriate route for the subject development.


Yours faithfully
For and on behalf of
LAMBERT & REHBEIN (SEQ) PTY LTD




S.A. WILLIAMS BE(Civil), MIEAust RPEQ
DIRECTOR
TRANSPORT & INFRASTRUCTURE


Enc:   Top Forestry Road Concept Design Plans
       Geotechnical Investigation Report - Red Earth Engineering (dated April 2015)
       Ecological Advice - L&R Letter (dated 14/05/2015)
       Pavement Design Profile - Circly Outputs
Log in to download the original file

4 - HAUL ROUTE RESPONSE - B14101TL001.pdf · 107 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.