Original source · versioned page text
Update Engineering Plans_190521
LEGEND
VISITOR
UPSTREAM OVERLAND FLOW
PATH CALCULATIONS
SITEWORKS LAYOUT PLAN
Project North:
N
Scales:
0 1 2 3 4 5m 1:100 at A1
A
1:200 at A3
SECTION SECTION
Status:
NOTES Client: COLE PROJECTS Designed: SFD Drawn: AJP Title: Date: MAY 2021 Scale: AS NOTED
Issue Amendment Date Dft 1. This is the property of the engineer, and may not be Sunshine Coast Office Bundaberg Office
A
B
FOR APPROVAL
FOR APPROVAL
14.05.21
17.05.21
AJP
AJP
used, copied, or reproduced wholly, or in part without the
express permission of the engineer. Infringement in any
L2, 13 Norval Court Maroochydore Q 4558
PO Box 102 Mooloolaba Q 4557
66A Barolin Street Bundaberg Q 4670
PO Box 2052 Bundaberg Q 4670
Project: PROPOSED APARTMENT DEVELOPMENT Approved: STORMWATER MANAGEMENT PLAN Job Ref No: Drawing No: Issue:
C FOR APPROVAL 18.05.21 AJP way may result in legal action.
Engineering P: 07 5477 6437 P: 07 4154 4894 31 BOTTLEBRUSH AVENUE,
2. Figured dimensions take precedence over scaled.
3. Verify all dimensions on site. ACN 112761510 ABN 21112761510
E: [email protected] E: [email protected]
NOOSA HEADS TROY PAULSEN / RPEQ: 6990
SC-8839 C003 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Update Engineering Plans_190521.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.