Council archive · source document
09/1058 - MCU - Detached House [As Published] · 132009.1058
_ 29 July 2009 Sunshine Coast Regional Council Tewantin Office PO Box 141 Tewantin QLD 4567 Dear Sir / Madam: RE: Owner's Statement in support of Development Application for 8 Piper Street, Peregian Beach | write as owner of the above property in support of the development application to demolish the existing property on the site of 8 Piper Street, Peregian Beach and to replace it with a new architect designed house. The existing house is very much a beach house and serves that purpose well. However, it is not designed for comfortable or convenient long-term accommodation by a multi-generational family. This is my goal, as my wife and | want to live on the site with room to accommodate visiting children and their families. To this end we have engaged Dan Sparks as architect to design the house we desire. We engaged Dan because we felt he was environmentally aware and wholly sympathetic to our needs of creating a living eee environment that blends with the natural beauty of the area. What specifically appeals to us is his concept of “inverting” a traditional Queenslander design. That is, the pavilion concept he has arrived at places the usual exterior, surrounding verandahs and outdoor areas interior to the house, thus giving us an outside room in the middle of the house with generous enclosed decking. The building’s exterior form blends with the environment in both material and colour. The pavilion design actually enhances our appreciation of the external natural environment by directing one’s attention, from anywhere in the house, to the natural bush landscape between the house and the beach, We have gone to great lengths to ensure the house in environmentally efficient with water tanks, solar energy, the use of natural materials, and the use of natural ventilation for both heating and cooling. The footprint of the new house is significantly smaller than the existing house, allowing for greater penetration than before of natural vegetation onto the small block. Where parts of the new building marginally extend into the setback area at the rear of the house, these intrusions are cantilevered, or above ground, allowing for greater plantation than currently exists. Consequently, the setback area for the Open Space Corridor is maintained and accessible for 365 days of the year. This is not the case for adjoining and other houses in our area, which uniformly encroach the setback area with in-ground pools, fences and other structures.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1058 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.