Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-11-18 GC Agenda - Item 7 - Attachment 1 - Draft Noosa Biosecurity Plan 2020

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       Ecological impact (scored between 1 and 5, where 5 was the highest impact)
       Economic impact (scored between 1 and 5, where 5 was the highest impact)
       Community impact (scored between 1 and 5, where 5 was the highest impact)
       Feasibility of management actions (scored between 1 and 10, where 10 was the highest
        likelihood of success)


 Criteria                              Score range                      Score
 Likelihood of establishment           1-5
 Ecological impact                     1-5
 Economic impact                       1-5
 Community impact                      1-5
 Feasibility of management             1-10
 actions
 Total prioritisation score


Table 2 Prioritisation methodology (Methodology source: Gold Coast City Council Biosecurity Plan).
The invasive species, with their prioritisation score, are is further categorised into priority
management responses of prevention, eradication or containment. This is depicted in the
generalised invasion curve below. Note that actual on-ground actions for landowners will depend
on the extent of infestation.




Figure 2. Generalised invasion curve


‘Prevention’ is the highest priority followed by ‘eradication’ and ‘containment’. Investment priorities
will mirror the results of the risk assessment. In most circumstances, Priority 1 species will require
little investment, but should they be recorded in Noosa immediate resources will be required,
proportional to the risk.


Noosa Biosecurity Plan 2020                                                                          Page 15
Log in to download the original file

2019-11-18 GC Agenda - Item 7 - Attachment 1 - Draft Noosa Biosecurity Plan 2020(PDF, 3MB).pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.