Table 3.3 Flow comparison between Pre- and Post- development
Storm Event Peak Flow Pre- Peak Flow Post- Difference Difference
development development (m3/s) (L/s)
3 3
(m /s) (m /s)
63% AEP, 25min 0.017 0.031 0.014 14
39% AEP, 25min 0.022 0.036 0.014 14
20% AEP, 25min 0.035 0.051 0.016 16
10% AEP, 25min 0.046 0.061 0.015 15
5% AEP, 25min 0.054 0.070 0.016 16
2% AEP, 25min 0.059 0.074 0.015 15
1% AEP, 25min 0.069 0.082 0.013 13
It can be observed that the proposed development shall produce a maximum of 16L/s
increase in flow discharge from storm events up to 1% AEP, which may cause actionable
nuisances to the vicinity of the development site. Hence, on-site stormwater detention
devices are necessary for the proposed development, so that the peak flow from the Post-
development scenario can be no greater than the Pre-development scenario.
To validate the modelling results above, Rational Method is also applied to estimate the
discharge, detailed calculation is presented in Appendix E. Table 3.4 summarises the peak
flows of various storm events.
File Name: WCD-22936 – 65-67 Elanda_SWMP.docx
Revision: C 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.