Original source · versioned page text
Stormwater Management Plan
Original PDF page 35, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn PROPERTY BOUNDARY
E For Approval JP 7/08/22
D For Approval JP 3/08/22
PROPOSED FOOTPATH
EDGE OF EXISTING ASPHALT C For Approval JP 14/01/22
B For Approval JP 13/01/22
GENERAL NOTES A Original Issue (For App.) JP 10/01/22
1:40 1:8 1. ALL WORK TO CONFORM TO AS 3500 Part 1, 2 Rev Description Drawn Date
1:33 1:8 1:6
& 3. Associated Consultant
1:4 DWELLING 2. ALL WORK TO CONFORM WITH ALL RELEVANT
AUSTRALIAN STANDARDS.
PROPOSED KERB AND CHANNEL 3. CONTRACTOR TO VERIFY ALL LEVELS
BEFORE COMMENCING WORK TO ENSURE
CONNECTION TO SERVICE WITH ADEQUATE
0.5 0 0.5 1 1.5 2 2.5m COVER AND FALL.
ROAD SECTION
Scale 1:50 SCALE 1 : 50 4. THE EXISTING UNDERGROUND SERVICES
(BEFORE REDUCTION) SHOWN HAVE BEEN OBTAINED FROM OLD
ROAD CROWN
E
E
TOP See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.