Skip to the record
The gold standard in government transparency.

Council archive · source document

08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published] · 142008.252

of 29

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

7. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.

8. Any ship moored or dry berthed at this structure must not exceed the following sizes:

Wet Berth Dry Berth
Length Overall - 15.0 metres . N/A
Beam - 5.0 metres

9. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.

Yours sincerely

)
Captain Peter i

Acting Regional

mu

aybour Master (Brisbane)

   

Maritime Safety Queensland . Page 2 of 2

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.