Council archive · source document
08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published] · 142008.252
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 43, Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for the application can be given? No C1 Yes 13(a). Indicate the reason PLSL is not applicable oOo The application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or [XJ All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or (1 The work is being cartied out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be sighted by the assessment manager before a development permit can be given OFFICE USE ONLY Date Received | . Reference Numbers 06) 342- 2} ls a QLeave Notification and Payment Form required for this application? (No LD Yes - Complete Table M To Council BSA Cerification runiber, Building:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.