Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
COLLECITON MANIFOLD
200mm UNSLOTTED PIPE
IN COARSE GRAVEL LAYER
BIORETENTION BASIN
OVERFLOW POINT UNDERFLOW COLLECTION PIPEWORK
150mm SLOTTED PVC PIPEWORK
OVERFLOW PIPE IN COARSE GRAVEL LAYER
200mm UNSLOTTED PIPE
SCOUR POINT LOCATED AT END OF
EACH HEADER
XALL
Vi I,Sm
I.pn Pe
)OB NAME .^ , DRAWING TITLE
CLIENT DETALS
ESSENCE OF PERIGIAN
L (7 lddt.ek, tw'kR 1 r<k
Simmonds & Bristow Pty. Ltd. BIORETENTION BASIN
PACIFIC PLUMBING ^wdd tr. 11e "I,- tk /Wel I I S 11
.(rnka Ml dlSl0.
IONOT S Au WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS AND WETLAND LAYOUT AS SHOWN
STORMWATER TREATMENT kkkke,Ink,AtkkrolrN.Ok/rI.
Ik ieren.id rf.i WETLAND AND BIORETENTION A1B/PROPOSAL No.
DESIGN Ay dYeeai+slokrefrlt
rmdniWf. .,Tm.W IM
S1lfor
ke M
MID AS EXAMPLE J-1005-310
S AldkkknY. Wadmlk 0$d DRAWING STATUS OWL No. REV
NITIAL VERSION T. CONCEPT ONLY
CCMMLNIS NBTL. PLOTNUL8ER: DATE 02/12/10 J-1005-310--04 O
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.