Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
MUSIC Model Inputs for the Essence of Peregian: Post                            Commercial Podium (rest.,
development                                                Commercial (hotel)           shops)              North balance   Mid balance   South balance
Size (ha)                                                         0.254                  0.0915                05345          0.7057          0.296
% Impervious                                                        40                     40                    11              11             11
Rainfall threshold (mm/day)                                          1                      1                     1               1              1
Soil storage capacity (mm)                                         120                     120                  400            400             400
Initial storage (% of capacity)                                    25                      25                     10             10             10
field capacity (mm)                                                80                      80                    200            200            200
infiltration capacity coefficient - a                              200                     200                    50              50             50
infiltration capacity exponent - b                                  1                        1                     1               1              1
initial depth (mm)                                                 50                       50                    50              50             50
daily recharge rate (%)                                            25                       25                    25             25              25
daily baseflow rate (%)                                             5                        5                     5              5               5
daily deep seepage rate (%)                                         0                        0                     0              0               0
TSS Base flow conc. Params (Mean, Std Dev) (Log mUL)           0.78, 0.39               0.78, 0.39             1, 0.34         1, 0.34        1, 0.34
TSS Storm flow conc. Params (Mean, Std Dev) (Log mL/L)         2.16, 0.38               2.16, 0.38           2.18, 0.39     2.18, 0.39      2.18, 0.39
TP Base flow conc. Params (Mean, Std Dev) (Log mUL)             -0.6, 0.5               -0.6, 0.5            -0.97, 0.31    -0.97, 0.31    -0.97, 0.31
TP Storm flow one. Params (Mean, Std Dev) (Log mL/L)           -0.39, 0.34             -0.39, 0.34           -0.47, 0.31    -0.47, 0.31    -0.47, 0.31
TN Base flow conc. Params (Mean, Std Dev) (Log mUL)             0.32, 0.3               0.32, 0.3              0.2, 0.2       0.2, 0.2       0.2, 0.2
TN Storm flow conc. Params (Mean, Std Dev) (Log mUL)            0.37, 0.4               0.37, 0.4            0.26, 0.23     0.26, 0.23      0.26, 0.23


MUSIC Model Inputs for the Essence of Peregian: Post
development                                              FRoof Restaurant
Size (ha)                                                        0.111
% Impervious                                                      100
Rainfall threshold (mm/day)                                        1
Soil storage capacity (mm)                                        400
Initial storage (% of capacity)                                    10
field capacity (mm)                                               200
infiltration capacity coefficient -a                               50
infiltration capacity exponent - b                                   1
initial depth (mm)                                                  50
daily recharge rate (%)                                            25
daily baseflow rate (%)                                              5
daily deep seepage rate (%)                                         0
TSS Base flow conc. Params (Mean, Std Dev) (Log mUL)             1, 0.34
TSS Storm flow conc. Params (Mean, Std Dev) (Log mUL)          2.18, 0.39
TP Base flow conc. Params (Mean, Std Dev) (Log mUL)            -0.97, 0.31
TP Storm flow conc. Params (Mean, Std Dev) (Log mUL)           -0.47, 0.31
  N Base flow conc. Params (Mean, Std Dev) (Log mUL)             0.2, 0.2
TN Storm flow conc. Params (Mean, Std Dev) (Log mUL)           0.26, 0.23

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.