Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
treatment devices and parameters Bio-retention C1 Wetland C2' Low flow by-pass (m '/sec) 0 0 High flow by-pass (m3/sec) 100 1 00 Volume below overflow pipe (kL) Depth above overflow (m) Surface area (m2) 3; :101 Overflow pipe diameter (mm) nunal demand 9kUyr) scaled by daily PET Daily demand (kUday) Monthly distribution of annual demand (kUyr) Extended detention depth (m) 0 Seepage loss (mm/hr) 15 Filter area (m 2) 27 Fitter depth (m) 0.6 Filter median particle diameter (mm) 0.45 Saturated hydraulic conductivity (mm/hr) 150° Depth below underdrain pipe (% of filter depth) 0 Overflow weir width (m) Length (m) Bed slope (%) Base width (m) Top width (m) Depth (m) Vegetation height (m) Inlet pond volume (m 3) p Permanent pool volume (m 60.2 Evaporative loss as % of PET 125 Equivalent pipe diameter (mm) 700
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.