EP-SECP-02: Site entry and exit points
1. Objectives/Targets To avoid sediment being transported off the site by vehicles
2. Management Strategy 1) Dislodge loosely bound sediment attached to vehicles by vibration;
2) Trap dislodged sediment in the interstices of a metal grid or gravel bed; and
3) High cressure water hose to remove mud stuck to truck tyres during wet weather.
3. Tasks/Actions 1) Install an access path of crushed rock leading into the site, and directly to the
stockpile area. Rock pads should be at least 15 m long and 200 mm thick, with an
underlying layer of geo-fabric. Use cattle ramps as part of the structure to allow 2
complete rotations of the largest tyre leaving the site.
2) Install a high pressure water hose that can reach the rock pad, to remove
cohesive mud.
4. Performance Indicators Spillage of sediment from the site through the exit, and onto the public road.
5. Monitoring Inspection of the road surface beside the exit for sediment movement off the site.
6. Frequency/Deadlines Inspect the exit. daily.
7. Responsibilities Building contractor.
8. Reporting and Review Exception reporting to the site manager and senior management.
9. Contingency When sediment transport from the site access point is occurring:
1) Place sandbags at stormwater drain entry to prevent spilt sediment from being
washed into stormwater drains,
2) Report situation to site manager immediately, and request support;
3) Halt traffic until situation is under control;
4) Initiate corrective actions;
5) Remove sandbags when the spill has been cleared.
10. Corrective actions 1) Remove sediment from road surface using a spade an broom. Do not use a hose;
2) Building contractor to advise staff about responsibilities inherent with hosing off
mud;
3) Install extra length of pock pad or grid if necessary,
4) Improve delivery of high pressure water hose if possible;
5) Avoid work under muddy conditions.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.