DRAINAGE CONTROL
on your buildinigsite
Soil erosion in unlined diversion drains can be controlled with the use of check dams constructed from
sand or gravel filled bags. Space the check dams so the crest of the down-slope dam is level with the base
of the up-slope dam (refer Figure 5.3).
V
Cieck ;sm
r t -'smite ry!a`h pad (sptwml)
1 1 ^
Figure 5.3
Check dams
The early connection of roof water to the stormwater
system will reduce site wetness and the generation of
on-site mud. Temporary or permanent downpipes
should be installed prior to frame inspection and as
soon as practicable after the roof is laid.
This practice has been shown to reduce downtime
following storm events and decrease the average
building construction time.
For further information about the Healthy Waterways Campaign and The Partnershrr, telephone (07) 3403 4206 or visit the Healthy Waterways web;ao o• www.healthywaterways.org
SUPPORIL1) BY
WIN aiiiii"
t'^¢-r^ rte: ^;T I1
QSC Res' ►rwara Dear.?ui O
r BR • w^
Pad!and
IInIMWrlNalrrrrr 71...4... ''^•^"^. ^. •. s n.x.,.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.