Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
TAaLE2.1 TARGET R G
E VSv SILM DESCRIP IONS
IONAL EV
1 12.2.7 Not of Concern Mefaleuca quinquenervia or M. widiflora open-forest to woodland. Other species include
Eucalyp!us tereticomis, Corymbia intermeda, E bancrof ii, E. latisinensis, E. robusta,
Lophostemon suaveolens and Livistona decora. A shrub layer may occur with frequent
species including Melastoma malabathricum subsp. malaballvicum or Banksia robur.
12.2.12 Not of Concern Closed heath on seasonally waterlogged sand plains. Characteristic shrubs include Banksia
spp., Boronia lak:ilolia, Epacris spp., Baccke:a frutescens, Schoenus brevilolius,
Leptospeanum spp., Hakea actites, Melafeuca thymifelia, M. nodose, Xanthorrhea lufva.
12.2.15 Not of Concern Swamps with Baumea spp.. Juncus spp. and Lepironia articu/ata
In order to achieve the above objectives and target community, a strategy has been devised to guide and co-
ordinate rehabilitation efforts in a logical fashion. The strategy is divided into rehabilitation treatments and
zones. Rehabilitation treatments are a set or combination of actions such as revegetation, weed removal
etc. Rehabilitation zones dictate the extent and details of each treatment type. The on-ground
implementation of the strategy is described in Section 4.0.
2.3.1 Rehabilitation Zones
Various rehabilitation treatments are proposed as part of the rehabilitation strategy and as such, the site has
been divided into rehabilitation zones as shown in Figure 2.1. The strategic approach is modified to reflect
the current and future condition and requirements of each zone. Rehabilitation zone 1 encompasses the
entire caravan park area and will undergo extensive weed removal treatment and supplementary planting in
accordance with the approved Landscape Plan. Rehabilitation zone 2 occurs along the interface of the
parkland and caravan park (i.e. gabion wall) and Rehabilitation zone 3 encompasses the remaining portion
of the parkland. Both zones will undergo weed removal where necessary, and infill planting (i.e. revegetation
works).
10041 1 _ PR26S t 7_FL_Rehab.doc Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.