Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
3.5.4 Mulching Site generated mulch from chipped trees and other vegetation and / or other non-weed bearing mulch should be used throughout the rehabilitation areas including around all planted stock. Each plant should be mulched to a radius of 1m surrounding the plant at a depth of 100mm. Mulch should not touch plant stems. Mulch can also be used in areas awaiting rehabilitation (and landscaping) to suppress weed growth 3.5.5 Watering Water crystals are to be placed at the bottom of planting holes and in contact with plant roots (if the water crystals do not contain additional fertiliser). All plants are then to be watered in at planting (approximately 5 - 10L) and as required in the establishment and maintenance periods that follow. Note that Council watering restrictions may apply. 100611 PR20SIY FL_Rehab.duc Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.