Contractors undertaking rehabilitation works must be instructed directly of the requirements of this plan. A
copy of this ERP is to be retained and displayed on site at all times during rehabilitation activities. The site
manager should ensure that all relevant contractual documents specify the ERP as a responsibility. The
roles and responsibilities assigned to individuals are outlined in Table 4.1.
TABLE 4.1 ROLES & R FSPO NSIBIUTIES
Hehabilitatiun contractor Renabi:itation works. Implement the requirements of the ERP;
Replace plant mortalities; and
Ongoing maintenance.
Restoration Ecologist Ensure the rehabilitation contractor is Monitoring of rehabilitation works to
hriplernenting the requirements of the ERP. ensure compliance with the ERP;
Report to Project Manger- Sign off at end of maintenance period;
and
Recommend amendments, where
necessary.
Matrix Project Pty Ltd / Ensure the rehabilitation contractor has the Review monitoring reports to ensure
Project Manager necessary access to the site. Ensure the compliance.
rehabilitation contractor is implementing the I
requirements of the ERP.
10061 l_PR20517_FL_Rehab.doc Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.