Contractors undertaking rehabilitation works must be instructed directly of the requirements of this plan. A
copy of this ERP is to be retained and displayed on site at all times during rehabilitation activities. The site
manager should ensure that all relevant contractual documents specify the ERP as a responsibility. The
roles and responsibilities assigned to individuals are outlined in Table 4.1.


TABLE 4.1               ROLES & R   FSPO NSIBIUTIES


Hehabilitatiun contractor    Renabi:itation works.                             Implement the requirements of the ERP;
                                                                               Replace plant mortalities; and
                                                                               Ongoing maintenance.
Restoration Ecologist        Ensure the rehabilitation contractor is           Monitoring of rehabilitation works to
                             hriplernenting the requirements of the ERP.       ensure compliance with the ERP;
                             Report to Project Manger-                         Sign off at end of maintenance period;
                                                                               and
                                                                               Recommend amendments, where
                                                                               necessary.

Matrix Project Pty Ltd /     Ensure the rehabilitation contractor has the      Review monitoring reports to ensure
Project Manager              necessary access to the site. Ensure the          compliance.
                             rehabilitation contractor is implementing the I
                             requirements of the ERP.




10061 l_PR20517_FL_Rehab.doc                                                                                    Page 15

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.