APPENDIX B MAINTENANCE SCHEDULE
Locate rehabilitation zones on the site; Restoration Ecologist
In i;a: Locale spot treatment areas within zone 2; and & Rehabiil atlon
Identify rubbish and weeds to be removed etc. Contractor.
Ensure appropriate weed removal / control has been Rehablll latIon
Pre•revegetation Implemented: Contractor
works Irstall erosion & sediment control devices (It required;; arc
Acquire mulch, fertiliser, grow-tubes, sun-hardened seedlings etc.
• Implement plant out; and Restoration Ecologist
Plarl rq • Erect signage. & Rehabili'.allon
Contractor.
• Monitor seedling health; • Replace damages seedlings; Rehabilitation
Weekly for 2 Check for disturbances from pests (e.g. rabbits, vandals etc); • Replace plant guards; Contractor.
•
months following n
the completion of
Check erosion & sediment control devices are in place and in • Re-Instate damaged sediment fencing; and
revegetation works working order; and • Water daily 11 rainfall has not been sufficient.
Watering.
Monitor plant health; • Replenish mulch If necessary; Rehabilitation
Check for disturbances from pests; • Replace plant guards; Contractor,
Check for eroslorVsedlmentallon; • Replace damaged seedlings;
Monthly for the
first 6 months
Monitor weeds; and • Re-instate damaged sediment fencing;
Watering. • Treat declared weed species and manage spread of
other weeds; and
• Water 11 rainfall has not been sufficient.
• Check mulch; • Replenish mulch If necessary; Rehabilitation
• Monitor weeds; • Treat declared weed species and spray to maintain Contractor &
• Check for erosion/sedlmentalion; and control over spread of other weeds; and Restoration
Quarterly • Monitor regeneration success. • Undertaken any additional measures necessary to EcologlsL
remediate any unsuccessful rehabilitation woks or
ensure continued! future rehaoilitation success
(as suggested by the Rehabilitation Ecologist).
n Complete all required rehabllkatfon works • Undertaken any additional measures necessary to Rehabilitation
• Monitor plant health; remediate any unsuccessful rehabilitation works or Contractor &
12 ^onths • Check for disturbances from pests; ensure continued / future rehabilitation success Restoration
•
(as suggested by the Rehabilitation Ecologist). Ecologist.
Monitor weeds; and
• Complete report on the regeneration success.
10061I_PR205I7_FL_Rrhab.doc Page IS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.