APPENDIX B           MAINTENANCE SCHEDULE




                         Locate rehabilitation zones on the site;                                                                                      Restoration Ecologist
In i;a:                  Locale spot treatment areas within zone 2; and                                                                                & Rehabiil atlon
                         Identify rubbish and weeds to be removed etc.                                                                                 Contractor.
                         Ensure appropriate weed removal / control has been                                                                            Rehablll latIon
Pre•revegetation         Implemented:                                                                                                                  Contractor
works                    Irstall erosion & sediment control devices (It required;; arc
                         Acquire mulch, fertiliser, grow-tubes, sun-hardened seedlings etc.
                     •   Implement plant out; and                                                                                                      Restoration Ecologist
Plarl rq             •   Erect signage.                                                                                                                & Rehabili'.allon
                                                                                                                                                       Contractor.
                     •   Monitor seedling health;                                             •   Replace damages seedlings;                           Rehabilitation
Weekly for 2             Check for disturbances from pests (e.g. rabbits, vandals etc);       •   Replace plant guards;                                Contractor.
                     •
months following     n
the completion of
                         Check erosion & sediment control devices are in place and in         •   Re-Instate damaged sediment fencing; and
revegetation works       working order; and                                                   •   Water daily 11 rainfall has not been sufficient.
                         Watering.
                         Monitor plant health;                                                •   Replenish mulch If necessary;                        Rehabilitation
                         Check for disturbances from pests;                                   •   Replace plant guards;                                Contractor,
                         Check for eroslorVsedlmentallon;                                     •   Replace damaged seedlings;
Monthly for the
first 6 months
                         Monitor weeds; and                                                   •   Re-instate damaged sediment fencing;
                         Watering.                                                            •   Treat declared weed species and manage spread of
                                                                                                  other weeds; and
                                                                                              •   Water 11 rainfall has not been sufficient.
                     •   Check mulch;                                                         •   Replenish mulch If necessary;                        Rehabilitation
                     •   Monitor weeds;                                                       •   Treat declared weed species and spray to maintain    Contractor &
                     •   Check for erosion/sedlmentalion; and                                     control over spread of other weeds; and              Restoration
Quarterly            •   Monitor regeneration success.                                        •   Undertaken any additional measures necessary to      EcologlsL
                                                                                                  remediate any unsuccessful rehabilitation woks or
                                                                                                  ensure continued! future rehaoilitation success
                                                                                                  (as suggested by the Rehabilitation Ecologist).
                     n   Complete all required rehabllkatfon works                            •   Undertaken any additional measures necessary to      Rehabilitation
                     •   Monitor plant health;                                                    remediate any unsuccessful rehabilitation works or   Contractor &
12 ^onths            •   Check for disturbances from pests;                                       ensure continued / future rehabilitation success     Restoration
                     •
                                                                                                  (as suggested by the Rehabilitation Ecologist).      Ecologist.
                         Monitor weeds; and
                     •   Complete report on the regeneration success.




10061I_PR205I7_FL_Rrhab.doc                                                                                                                                          Page IS

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.