Matrix Projects (QLD)- Essence of Peregian, David Low Way Peregian Beach QLD 4573      Page 13



Tree Mana;vement and Protection Plan

Site address:                                  Essence of Peregian, David Low Way
                                               Peregian Beach QLD
                                               Unit Development and Construction
                                               OPW
Contractor:
                                               - Business:
                                               - Mobile:

Site Arborist:
                                               - Business:
                                               - Mobile:

Tree contractor:
                                               - Business:
                                               - Mobile:

The following tree protection procedures are to be undertaken during the development
of the site to insure the safe, healthy, and long-term retention of retained trees
(numbered 7, 8 and 9 in the arborist report by Leaf & Limb Horticultural
Consultancy) identified in the operational works approved by Sunshine Coast
Regional Council. This document is to read in conjunction with the Arborist Report
prepared by Leaf & Limb Horticultural Consultancy for the site.

A laminated copy of these tree protection procedures is to be attached to any tree
protection fencing on the site, and a copy is to be retained on site by the building
contractor supervising the project.

The area within the Tree Protection Zone of any protected tree will be mulched to a
depth of 75mm with composted wood and leaf mulch (created by tree chipper), which
contains no soil fines. The TPZ is to be irrigated once per week or have five 200-litre
drip drums installed (filled twice a week).

Pre Construction

    •    Prior to construction works, a site arborist shall be contracted to supervise all
         tree protection procedures detailed in this document. The site arborist is
         required to have a minimum level 5 AQS qualification in Arboriculture, and a
         minimum 5 years experience in tree protection on construction sites. Their
         details are to he tilled in on all tree protection fencing signage.

    •    Prior to construction works, a tree contractor shall be contracted to conduct all
         pruning operations detailed in this document or instructed to by the site
         arborist. The tree contractor cannot be the site arborist due to perceived
         conflict of interest. The tree contractor must have a minimum level 3 AQS
         qualification in Arboriculture, and be able to follow AS4373-2007. Their
         details are to be filled in at the top of the document.



Leaf and Limb I lorticultural Consultancycci
Prepared by Samuel Cowie                                                     I I'h of June 2009

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.